Rescue and use of the Convention of Concontera in Chochšový Monastery (Q59997): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: EU contribution (P835): 2,159,454.3419999997 euro) |
(Changed an Item: Fixing rounding issue) |
||||||||||||||
Property / EU contribution | |||||||||||||||
2,159,454.34 Euro
| |||||||||||||||
Property / EU contribution: 2,159,454.34 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 2,159,454.34 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 2,159,454.34 Euro / qualifier | |||||||||||||||
point in time: 1 October 2020
|
Revision as of 18:08, 21 September 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Rescue and use of the Convention of Concontera in Chochšový Monastery |
Project in Czech Republic financed by DG Regio |
Statements
53,986,358.55 Czech koruna
0 references
63,513,363.0 Czech koruna
0 references
85 percent
0 references
28 January 2016
0 references
30 November 2020
0 references
Obec Chotěšov
0 references
33214
0 references
Projekt se týká obnovy konventu kláštera v Chotěšově. Úpravy se týkají části 1.NP, obnovy zpřístupnění průchodu do vnitřního dvora, opravy schodiště do 2.NP a úpravy v úrovni 2.NP, obnova fasády a jižní zahrady. V havarijním stavu je kanalizační systém a dochází k destrukci kleneb ve 2.NP včetně trhlin na fasádě. V 1.NP zůstane muzeum (bude realizována nová expozice), s výstavní expozicí barokní soch. Bude vybudováno sociálního zařízení v 1NP i 2.NP. 1. a 2.NP bude propojeno výtahem. (Czech)
0 references
The project concerns the restoration of the Convention of the monastery in Chochšove. The adjustments concern the part of 1. NP, the renewal of access to the internal courtyard, the repair of the stairs to 2-NP and the adjustment in the level of the 2-NP, the renovation of the façade and the south gardens. In the emergency state, the sewerage system and the destruction of jewellery in the 2th NP, including cracks in the façade, are taking place. In 1.NP, a museum will remain a museum (new treatment will be realised), with exhibition exhibition on Baroque. Both 1NP and 2.NP. will be built. 1. and 2.NP will be connected to the lift. (English)
0 references
Identifiers
CZ.06.3.33/0.0/0.0/15_015/0000336
0 references