Installation of solar panels with a power rating of 39.78 kW by Business Investment & Counselling the company with limited liability for the use of solar energy for the production of electricity in the Linegas (Q131878): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): The investment covered by this project consists of the purchase and installation of a 39.78 kW photovoltaic power plant in the village of Mrągowo, on the land at ul. “Young” 40 on plot No 125/2. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own bus...)
Property / summary
The investment covered by this project consists of the purchase and installation of a 39.78 kW photovoltaic power plant in the village of Mrągowo, on the land at ul. “Young” 40 on plot No 125/2. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own business and be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws 2015, item (478) and Article 7 (1) 8d with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) (348) it will be made on the basis of the notification without the beneficiary having to have a valid technical connection for all the energy sources included in the project for electricity generation. The applicant currently has a connection point where the contractual power is 270 kW. The project fulfils all the conditions laid down in the SzocOP ROP WiM 2014-2020. The investment consists of the installation of 131 polycrystalline panels with a capacity of 300 W and 2 polycrystalline panels having a power of 240 W with a total power of 39.78 kW joined in independent systems with inverters and the necessary cabling and fittings. Solar panels are using solar radiation to convert solar radiation into electricity. By cable, they transmit energy to inverters where there is a change in direct current into alternating current. The plant will be connected to the grid and there will be no need to install batteries and recharging regulators as the network is capable of absorbing all the energy produced by the photovoltaic system. The electricity produced will be used directly for own account and any surplus will be entered into the grid. (English)
 
Property / summary: The investment covered by this project consists of the purchase and installation of a 39.78 kW photovoltaic power plant in the village of Mrągowo, on the land at ul. “Young” 40 on plot No 125/2. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar installations (e.g. solar collectors, photovoltaic) — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own business and be connected to the grid, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (Journal of Laws 2015, item (478) and Article 7 (1) 8d with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) (348) it will be made on the basis of the notification without the beneficiary having to have a valid technical connection for all the energy sources included in the project for electricity generation. The applicant currently has a connection point where the contractual power is 270 kW. The project fulfils all the conditions laid down in the SzocOP ROP WiM 2014-2020. The investment consists of the installation of 131 polycrystalline panels with a capacity of 300 W and 2 polycrystalline panels having a power of 240 W with a total power of 39.78 kW joined in independent systems with inverters and the necessary cabling and fittings. Solar panels are using solar radiation to convert solar radiation into electricity. By cable, they transmit energy to inverters where there is a change in direct current into alternating current. The plant will be connected to the grid and there will be no need to install batteries and recharging regulators as the network is capable of absorbing all the energy produced by the photovoltaic system. The electricity produced will be used directly for own account and any surplus will be entered into the grid. (English) / rank
Normal rank
 

Revision as of 16:17, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of solar panels with a power rating of 39.78 kW by Business Investment & Counselling the company with limited liability for the use of solar energy for the production of electricity in the Linegas
Project in Poland financed by DG Regio

    Statements

    0 references
    187,000.0 zloty
    0 references
    44,880.0 Euro
    13 January 2020
    0 references
    220,000.0 zloty
    0 references
    52,800.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 March 2017
    0 references
    30 May 2017
    0 references
    BUSINESS INVESTMENT & COUNSELING SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°52'7.0"N, 21°18'18.7"E
    0 references
    Inwestycja objęta niniejszym projektem polega na zakupie i montażu elektrowni fotowoltaicznej o mocy 39,78 kW, w miejscowości Mrągowo, na gruncie przy ul. Młodkowskiego 40 na działce nr 125/2. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO WiM 2014-2020 dla działania 4.1 - instalacji wykorzystujących energię słońca (np. kolektory słoneczne, fotowoltaika) - do 2 MWe/MWth. Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła potrzebom własnym przedsiębiorstwa i będzie podłączona do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii (Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będzie ona dokonywana na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia wszystkich ujętych w projekcie źródeł wytwarzania energii do sieci elektroenergetycznej. Wnioskodawca posiada obecnie przyłącze gdzie moc umowna wynosi 270 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP RPO WiM 2014-2020. Inwestycja polega na montażu 131 sztuk paneli polikrystalicznych o mocy 300 W oraz 2 sztuk paneli polikrystalicznych o mocy 240 W o łącznej mocy 39,78 kW połączonych w samodzielne układy wraz z falownikami, z niezbędnym okablowaniem i osprzętem. Panele fotowoltaiczne wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania słonecznego na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą energię wyprodukowaną przez system fotowoltaiczny. Wyprodukowana energia elektryczna będzie wykorzystywana bezpośrednio na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. (Polish)
    0 references

    Identifiers

    RPWM.04.01.00-28-0264/16
    0 references