Energy savings on Building 1304/46 (Q73321): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: EU contribution (P835): 50,917.428 euro)
Property / EU contribution
50,917.428 Euro
Amount50,917.428 Euro
UnitEuro
 
Property / EU contribution: 50,917.428 Euro / rank
Preferred rank
 
Property / EU contribution: 50,917.428 Euro / qualifier
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
 
Property / EU contribution: 50,917.428 Euro / qualifier
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 09:24, 22 September 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings on Building 1304/46
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    1,272,935.7 Czech koruna
    0 references
    4,243,119.0 Czech koruna
    0 references
    169,724.76 Euro
    10 January 2020
    0 references
    30 percent
    0 references
    31 July 2018
    0 references
    Pražská vodohospodářská společnost a.s.
    0 references
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Stavební úpravy zahrnují zateplení obvodového pláště administrativní budovy čerpací stanice vody z důvodu zlepšení tepelně technických a energetických vlastností objektu. Jedná se o zateplení fasád objektu kontaktním zateplovacím systémem (KZS) a výměnu výplní otvorů. Součástí úprav je i zateplení střechy stávajícího objektu včetně a instalace tepelného čerpadla, které bude sloužit k ohřevu TUV. (Czech)
    0 references
    The construction work includes the insulation of the building envelope of the administrative building of the water pump station due to the improvement of the thermal and energy properties of the building. This is a insulation of the facades of the object by the contact warm system (KZS) and the exchange of the holes is filled. The modifications include the insulation of the roof of the existing building, including the installation of a heat pump which will be used to heat the TUV. (English)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/17_070/0006429
    0 references