Improving the low-carbon economy of the city of Hajnówka by building a micro-installation of photovoltaic and solar collectors (Q116897): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 148,864.0704 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 148,864.0704 Euro / rank | |||||||||||||||
Property / EU contribution: 148,864.0704 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 148,864.0704 Euro / qualifier | |||||||||||||||
|
Revision as of 10:37, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the low-carbon economy of the city of Hajnówka by building a micro-installation of photovoltaic and solar collectors |
Project in Poland financed by DG Regio |
Statements
620,266.96 zloty
0 references
954,256.89 zloty
0 references
65.0 percent
0 references
15 February 2017
0 references
14 December 2018
0 references
GMINA MIEJSKA HAJNÓWKA
0 references
Projekt posiada dwie grupy celów: kwantyfikowane cele bezpośrednie i cele o wymiarze społecznym (trudne do kwantyfikacji). Celami bezpośrednimi projektu są: wzrost produkcji energii z OZE i redukcja emisji CO2. Do celów społecznych należy podniesienie jakości życia mieszkańców poprzez: wzrost jakości infrastruktury technicznej, ochronę środowiska w wyniku redukcji zanieczyszczeń do atmosfery, redukcję kosztów opłat za energię przez mieszkańców. Projekt obejmuje realizację trzech zadań: - przygotowanie dokumentacji technicznej, - instalacja kolektorów słonecznych i paneli fotowoltaicznych, - nadzór inwestorski. W ramach projektu będzie wykonane: 48 instalacji kolektorów słonecznych, 35 instalacje fotowoltaiczne na budynkach mieszkańców gminy. Projekt jest wnioskowany do dofinansowania w ramach typu projektu pierwszego: Energetyka oparta na odnawialnych źródłach energii (energia odnawialna: słoneczna). Beneficjentem projektu jest Gmina Miejska Hajnówka, beneficjenci ostateczni projektu to mieszkańcy gminy, mieszkańcy obiektów – domów w których zostaną zainstalowane urządzenia oraz beneficjenci pośredni – wszyscy mieszkańcy gminy i regionu. Po realizacji projektu zostaną osiągnięte następujące wskaźniki: -Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 35 szt. - Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 48 szt. - Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych – 0,21 MW - Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych – 0,14 MW. - Szacowany roczny spadek emisji gazów cieplarnianych -134,24 Mt/ rok. CO2/rok - Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE – 74,82 MWh/rok - Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 134,00 MWh/rok (Polish)
0 references
The project has two sets of objectives: quantified direct objectives and social targets (difficult to quantify). The direct objectives of the project are to: increase in renewable energy production and reduction of CO2 emissions. For social purposes, the quality of life of the inhabitants should be improved by: increase in the quality of the technical infrastructure, environmental protection as a result of atmospheric pollution reduction, the reduction of the costs of energy charges by the population. The project involves three tasks: Preparation of technical documentation, installation of solar collectors and solar panels, investment supervision. The project will be carried out by: 48 solar collectors installations, 35 photovoltaic installations for the buildings of the municipality. The project is requested for funding under the type of first project: Renewable energy (renewable energy: solar). The beneficiary of the project is the Municipality of Hajnówka, the final beneficiaries of the project are residents of the municipality, the inhabitants of the premises — the houses in which the equipment will be installed and the indirect beneficiaries — all inhabitants of the municipality and region. Following the implementation of the project, the following indicators will be met: Number of units of generation of electricity produced from RES — 35. Number of units of generation of thermal energy produced from RES — 48. Additional capacity for generating renewable thermal energy — 0.21 MW — Additional capacity for generating renewable electricity — 0.14 MW. Estimated annual decrease of GHG emissions — 134,24 Mt/year. CO2/rok — Heat energy production from newly built RES installations — 74.82 MWh/year — Electricity production from newly built RES installations — 134.00 MWh/year (English)
0 references
Identifiers
RPPD.05.01.00-20-0419/17
0 references