The renovation of the monumental stony at ul. 1 May 11 in Olsztyn through renovation (Q132710): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 180,352.9968 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 180,352.9968 Euro / rank | |||||||||||||||
Property / EU contribution: 180,352.9968 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 180,352.9968 Euro / qualifier | |||||||||||||||
|
Revision as of 13:36, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The renovation of the monumental stony at ul. 1 May 11 in Olsztyn through renovation |
Project in Poland financed by DG Regio |
Statements
751,470.82 zloty
0 references
1,130,014.32 zloty
0 references
66.5 percent
0 references
3 January 2014
0 references
31 December 2020
0 references
WSPÓLNOTA MIESZKANIOWA NIERUCHOMOŚCI 10-117 OLSZTYN, UL. 1 MAJA 11
0 references
Zakres proj. obejmuje 1 budynek wielorodz. położ. w Olsztynie przy ul. 1 Maja 11 o łącznej pow. użyt. 1024,78 m2. Budynek wpisany do rej. zabytków pod nr : A-1818. W wybranym do realiz. wariancie stanow. przedmiot niniejszego projektu nowa jakość budynku oraz przestrz. zostanie uzysk. poprzez następ. usprawn.: prace rem-kons elewacji, klatki schod., piwnicy, dachu, stolarki okiennej i drzwiow. klatki schod. i piwnic, wym. inst. wod.-kan. stan. część wspólną oraz przyłącza, inst. domof. z kodem Brailla, ośw. automat., ozn. kontrast., mont. budek ornit. Znaczna poprawa stanu zachow. budynku i jego efektyw. energet. (poprzez inst. czujek oszczędz. en. elektr. w częściach wspól. budynku) oraz estetyki. Zainst. zost. nakł. braile'a na domofon. Więcej w rozdz. 1.1 sw; Interesar. przedm. projektu są mieszkańcy kamienicy, a tym samym obszaru rewit., turyści, służby konserw., Gm. Olsztyn. Szczeg. inform. na temat zakresu rzecz. i przyjętych rozwiąz. znajduje się w rozdz. 2.2 sw. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inw. wdraż. będzie przez beneficj., tj. Wsp. Mieszk. Nier. przy ulicy 1 Maja 11, która wraz z podm. współpr. zapewni zespół osób odpow. za wdroż. projektu, którzy posiadają kwalif. i doświad. w realiz. projektów , co potwierdza rozdział 2.4 studium. Projekt po jego zakoń. jednozn. rozw. jeden z istotn. probl. dotycz. najbardz. zniszcz. i zaniedb. infrastr. techn. przy ul. 1 Maja 11 w Olsztynie oraz będzie przeciwdz. margin. znacznych grup mieszk. zdegrad. społecz. i ekon, charakt. się zabytk. zabud. otoczenia. W istotny sposób przyczyni się także do społ. aktyw. mieszk. i wpłynie na obniż. poziomu wyst. zjawisk patol. społ. na danym terenie. Proj. wpis. się w założ. SZOOP RPO WiM 2014-2020, Oś 8 Obsz. wymag. rewit., Cel tem. 9 Prom. Włącz. Społ., walka z ubóstw. i wsz. dysk rym., Prior. Inwest. 9 b – Wsp. rewit. fizycz., gosp. i społ. ubogich społ.na obsz. miejs. i wiejsk., Cel szcz.: Lepsza jak. życia społ. zam. ob. probl. (Polish)
0 references
The range of proj consists of 1 multi-family building in Olsztyn, ul. 1 May 11 on the cumulative use of the loan. 1 024.78 m². A building which is included in historic monuments, under the number: A-1818. At the option chosen to implement this project, the new quality of the building and the change will be achieved through the following improvements: the work of the façade, the cage, the roof, the roof, window and door frames and doors for the staircase and the door. A significant improvement in the conservation status of the building and its energy efficiency. (by means of physical savings in the electrical components of the building) and aesthetics. Zainst. Braile to their record-decks. Read more 1.1 sw; The project consists of people living in a stony and in the same area of revitalisation, tourists, canners., Gm. Olsztyn. Specific information on the material scope and solutions adopted. 2.2 pin and in the appendix to the proposal. It will be implemented by the beneficiary. WSP. Bellows. Not done at the street on 1 May 11, which will provide a team for the implementation of the project, who will be qualified and experienced in the project. this is confirmed by chapter 2.4 of the study. Project after the end of the project. In Olsztyn, on 1 May 11, there will be no more than significant groups of residential living, social and environmental degradation, and the natura of indoor environment. It will also make an important contribution to the welfare of residential institutions and to reduce the level of visibility in the area. Take the form. SZOOP ROP WM 2014-2020, Oś 8 Obsz. required to be completed. 9 Prom. Enable. The fight against poverty and racism, Prior. Inwest. 9 b for the physics of the physicist., business and social affairs of the poor. A better quality of life. (English)
0 references
Identifiers
RPWM.08.01.00-28-0002/18
0 references