Managing the banks of the river Łyny from the bridge at ul. Olsztyńska to the bridge at ul. Korpernika in Lidzka WarMinsk (Q132619): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): The project focuses on the use of local natural resources, a protected area of the Lower Town Valley of Lower Łyny Valley in order to develop tourist and recreation areas, strengthening the maintenance of the competitive advantage of the Warmia and Mazury region, based on the natural heritage of the Lidzka WarMinsk natural heritage, which is in line with the SZOOP. The project has planned preparatory work for feasibility studies, surveillance,...) |
||
Property / summary | |||
Property / summary: The project focuses on the use of local natural resources, a protected area of the Lower Town Valley of Lower Łyny Valley in order to develop tourist and recreation areas, strengthening the maintenance of the competitive advantage of the Warmia and Mazury region, based on the natural heritage of the Lidzka WarMinsk natural heritage, which is in line with the SZOOP. The project has planned preparatory work for feasibility studies, surveillance, budget works (flood-related river basins, green, playground, monitoring, didactic charts, bulbar entrance, the introduction of existing water courses, strings, stairs, turbot, fountain, two pitches for the game in the bulbs, leisure places on grass, palette, slipway, audience — the kwalf., toilets, small architecture, lighting), statues, promotion. Once the project has been carried out, the complex of the town of Lizshoulder Warmiński in the city centre will make it very important for recreation and leisure and will become the city’s visiting card, which will translate into an increase in the number of visits. How to implement the project: — Burmistrz Lidzka WarMinsk — manage Proj. — Deputy Mayor — controlling the implementation of Proj. Project coordinator — content-related responsibility and financial responsibility for the progress of the project, supervision and evaluation of work, supervision of reports and reports? annansu, ongoing contact with the MA — Tax of the City — responsibility and supervision of the project budget and the work of the Financial Department — Kier. Department of Economic Affairs and Investments — responsible for tendering, cooperation with contractors for works and services, drafting of minutes — The Ministry of the Economy and Investment — responsible for documentation and contacts with the MA, promotion of the project, checks on the level of performance of the project indicators — Supervision in the project engineer for technical supervision of construction works and their quality, supervision of the entire documentation prepared by the developer. (English) / rank | |||
Revision as of 18:09, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Managing the banks of the river Łyny from the bridge at ul. Olsztyńska to the bridge at ul. Korpernika in Lidzka WarMinsk |
Project in Poland financed by DG Regio |
Statements
4,093,265.5 zloty
0 references
5,350,673.86 zloty
0 references
76.5 percent
0 references
10 June 2014
0 references
31 December 2017
0 references
GMINA MIEJSKA LIDZBARK WARMIŃSKI
0 references
Przedmiotem projektu jest wykorzystanie lokalnych zasobów przyrodniczych, Obszaru Chronionego Krajobrazu Dolina Dolnej Łyny w celu zagospodarowania przestrzeni na cele turystyczno-rekreacyjne, wzmacniające utrzymanie przewagi konkurencyjnej Warmii i Mazur nad innymi regionami w oparciu o zasoby dziedzictwa naturalnego Lidzbarka Warmińskiego co jest zgodne z SZOOP. W ramach projektu zaplanowano-prace przygotowawcze studium wykonalności, nadzór, roboty bud.( zagospodar. przeciwpowodziowe rzeki Łyny, zieleń, plac zabaw, monitoring, tablice dydaktyczne, wejście na Bulwar, udrożnienie istniejących cieków wodnych, ciągi piesze, schody skarpowe, fontanna, dwa boiska do gry w bule, miejsca wypoczynku na trawie, palenisko, pochylnia, widownia - niekwalf., toalety, mała architektura, oświetlenie), posągi, promocja. Po realizacji projektu, kompleksowo zagospodarowane brzegi Łyny w centrum miasta Lidzbark Warmiński sprawią, że przestrzeń ta nabierze dużego znaczenia w zakresie rekreacji i wypoczynku i stanie się wizytówką miasta, co przełoży się na wzrost oczekiwanej liczby odwiedzin. Sposób wdrażania projektu: - Burmistrz Lidzbarka Warmińskiego – zarządza proj. - Z-ca Burmistrza - kontrolujący realizację proj. - Koordynator projektu - odpowiedzialność merytoryczna i ?nansowa za postęp realizacji projektu, nadzór i ocena pracy, nadzór nad sprawozdaniami i rozliczeniami ?nansowymi, bieżący kontakt z IZ - Skarbnik Miasta – odpowiedzialność i nadzór nad budżetem projektu i pracą Referatu Finansowego - Kier. Referatu Gospodarki Kom. i Inwestycji - odpowiada za przetargi, współpracę z wykonawcami robót i usług, sporządzanie protokołów - Kier.Referatu gospodarki Kom. i Inwestycji – odpowiada za dokumentację i kontakty z IZ, promocję projektu, sprawdza poziom osiąganych wskaźników projektu - Nadzór w projekcie-Inżynier Kontraktu - nadzór techniczny nad robotami budowlanymi i ich jakością, nadzór nad całością dokumentacji sporządzanej przez wykonawcę (Polish)
0 references
Identifiers
RPWM.06.02.03-28-0001/16
0 references