Construction of a photovoltaic power plant of up to 40 kW in Smolyan (Q137693): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): The aim of the project is to increase the use of renewable energy sources and reduce greenhouse gas emissions in the district of Kolbaskowo by the construction of a 39.5 kW photovoltaic power plant. The entire energy produced, the applicant intends to sell. The project is not permanently attached to the land, nor does it require the land to be converted, since it constitutes a ground installation, and must therefore be regarded as being of a t...)
Property / summary
The aim of the project is to increase the use of renewable energy sources and reduce greenhouse gas emissions in the district of Kolbaskowo by the construction of a 39.5 kW photovoltaic power plant. The entire energy produced, the applicant intends to sell. The project is not permanently attached to the land, nor does it require the land to be converted, since it constitutes a ground installation, and must therefore be regarded as being of a transient nature. The project will be carried out in the following steps: (1) Purchase of equipment, (2) Installation of equipment, (3) installation of the installation into the network. The implementation of these investment tasks will be carried out on the basis of a project, the end of which is planned for October 2017. (English)
 
Property / summary: The aim of the project is to increase the use of renewable energy sources and reduce greenhouse gas emissions in the district of Kolbaskowo by the construction of a 39.5 kW photovoltaic power plant. The entire energy produced, the applicant intends to sell. The project is not permanently attached to the land, nor does it require the land to be converted, since it constitutes a ground installation, and must therefore be regarded as being of a transient nature. The project will be carried out in the following steps: (1) Purchase of equipment, (2) Installation of equipment, (3) installation of the installation into the network. The implementation of these investment tasks will be carried out on the basis of a project, the end of which is planned for October 2017. (English) / rank
Normal rank
 

Revision as of 19:09, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic power plant of up to 40 kW in Smolyan
Project in Poland financed by DG Regio

    Statements

    0 references
    137,691.5 zloty
    0 references
    33,045.96 Euro
    13 January 2020
    0 references
    161,990.0 zloty
    0 references
    38,877.6 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2016
    0 references
    31 October 2017
    0 references
    PIOTR ŻABIŃSKI
    0 references
    0 references
    Celem projektu jest zwiększenie wykorzystania odnawialnych źródeł energii oraz redukcja emisji gazów cieplarnianych w gminie Kołbaskowo poprzez budowę instalacji fotowoltaicznej o mocy 39,5 kW. Całość wyprodukowanej energii Wnioskodawca zamierza sprzedawać. Projekt, nie jest trwale związany z gruntem ani też nie wymaga przekształcenia terenu, ponieważ stanowi instalację naziemną, wobec tego należy uznać, że ma charakter niestacjonarny. Projekt zostanie zrealizowany w następujących etapach: 1) Zakup urządzeń, 2) Montaż urządzeń, 3) Przyłączenie instalacji do sieci. Wykonanie powyższych zadań inwestycyjnych stanowić będzie realizację projektu, którego zakończenie planowane jest na październik 2017 r. (Polish)
    0 references

    Identifiers

    RPZP.02.10.00-32-A049/16
    0 references