Construction of sanitary sewerage to improve infrastructure for the village of carmine, Sosnica, Fabians, Lutynia (Q135043): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claims)
(‎Changed an Item)
Property / budget
 
5,317,930.02 zloty
Amount5,317,930.02 zloty
Unitzloty
Property / budget: 5,317,930.02 zloty / rank
 
Normal rank
Property / budget
 
1,276,303.2 Euro
Amount1,276,303.2 Euro
UnitEuro
Property / budget: 1,276,303.2 Euro / rank
 
Preferred rank
Property / budget: 1,276,303.2 Euro / qualifier
 
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
Property / budget: 1,276,303.2 Euro / qualifier
 
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:56, 22 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of sanitary sewerage to improve infrastructure for the village of carmine, Sosnica, Fabians, Lutynia
Project in Poland financed by DG Regio

    Statements

    0 references
    3,390,180.38 zloty
    0 references
    813,643.2912 Euro
    13 January 2020
    0 references
    5,317,930.02 zloty
    0 references
    1,276,303.2 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    26 November 2015
    0 references
    30 June 2018
    0 references
    GMINA DOBRZYCA
    0 references
    Projekt obejmuje budowę sieci kanalizacji sanit. dla odprowadzenia ścieków bytowo-gospodarczych `w Gminie Dobrzyca (aglomeracja Dobrzyca - PLWL072). projekt został podzielony na zad 1,2,3,4,5,6. Zad 1 Obejmuje miejscowości: Karmin, Sośnica, Fabianów. W zakresie robót przewidziano wykonanie rurociągów kan. sanit. grawit. O160-200mm zlokalizowanych w pasach dróg powiatowych i gminnych (Fabianów ul. Nowa, Kwiatowa, Lutyńska, Pleszewska, Przemysłowa, Sośnicka) drogi powiatowe:4309P, 4174P, 4321P,4326P,4323P dr gminne: 628591P, 628551P, 628592P, 628650P,628551P,628566P) oraz odcinkowo na gruntach prywatnych wraz z odgałęzieniami O160mm doprowadzonymi do granicy posesji zakończonych studzienkami PVCO315mm Zakres zadania: Kolektory grawit. PVCf200mm 8159,6 mb Odgałęzienia kan. PVCf160mm 190/1070,2 szt/mb Rurociąg tłoczny PEf160mm 3452,2 mb Rurociąg tłoczny PEf110mm 1865,6 mb Rurociąg tłoczny PEf90mm 1403,1 mb Przepomp. ścieków sieciowe PS 3 szt Zawory napowietrzająco-odpowietrzające ZNO 7 szt Kable energ. YAKY (wew. linie zasilające) 22m Zad 2 Obejmuje miejscowość Lutynia. W zakresie robót przewidziano wykonanie rurociągów kan. sanit. grawit.O200mm zlokalizowanych w pasach dróg gminnych (dr gminne:628650P, 628525P, 628524P) oraz odcinkowo na gruntach prywatnych wraz z odgałęzieniami O160mm doprowadzonymi do granicy posesji zakończonych studzienkami Zakres zadania: Kolektory grawit. PVCf200mm 1302,1 mb, odgałęzienia kan. PVCf160mm 32/213,0 (szt/mb), Rurociąg tłoczny PEf90mm 967,7 mb Przepompownie ścieków sieciowe PS 1 szt Zad3 Promocja. Zad4 Nadzór inwest. Zad5 Dok. - przygotowanie projektu dla m. Karmin, Sośnica, Fabianów. Zad6 Dok. -przygotowanie projektu dla m. Lutynia. Łącznie w ramach projektu zostanie wybudowanych 18433,50mb kolektorów grawitacyjnych, odgałęzień kan. i rurociągów tłocznych. Wartość projektu to 6747131,96PLN w tym koszty kwalifik. 5317930,02PLN, koszty niekwalifik.1429201,94PLN, planowana kwota dofin. to: 3390180,38PLN. (Polish)
    0 references
    The project involves the construction of a water sanitation network for the discharge of domestic waste water in the municipality of Dobrzyca (Dobrzyca agglomeration — PLWL072). the project has been divided into 1,2,3,4,5,6. Zad 1 Includes localities: Carmine, Sosnica, Fabian. For works, provision is made for the construction of a canton of sanit. gravity. O160-200 mm located in the lanes of the county and municipal roads (Fabians ul. New, Kwiatowa, Lutyńska, Pleszzewska, Przemysłowa, Sosnick) Road powiatowe:4309P, 4174P, 4321P, 4326P, 4323P, Dr. municipal: 628591p, 628551P, 628592P, 628650P, 628551P, 628566P) as well as on private land with an O160mm branch junction with an Omm side junction with the completed wells of the completed wells of PVCO315mm Scope of task: Gravity collectors. PVCf200mm 8159,6 mb branch branches. PVCf160mm 190/1070,2 Head/mb Pef160mm Pf3452.2 mm Pf110mm Pef1865.6 mm Pef90m1403,1 mb Pef3mm Pef7mm Pfmm Pfmm Pfmm Pfmth Pfmm Pfmth Pfmm Pmb Pmt Pmt PT PDC Ps YAKY (supply lines) 22 m Zad 2 Includes Lutynia. For the works, provision is made for the construction of an sanity pipeline (sanity) (gminne:628650P, 628525P, 628524P) and on private land, with an O160mm branch junction with an O200mm branch close to the boundary of the completed wells. the scope of the task: Gravity collectors. PVCf200mm 1302,1mb branch, branch. PVCf160mm 32/213,0 (szt/mb), Pf90mm Pf967.7 mm Pfmm Pump pumping station, PS 1 pt: zad3 Promotion. Zad4 Inwest. Zad5 Dok. — Project preparation for m. carmine, Sosnica, Fabians. Zad6 Dok. -preparation of Lutynia. In total, the project will include 18433,50mb gravitational collectors, branch branches and press pipelines. The value of the project is PLN 6747131,96, including the costs of the eligible costs. PLN 5317930,02PLN, ineligible costs PLN 1429201,94, planned amount to be completed: PLN 3390180,38. (English)
    0 references

    Identifiers

    RPWP.04.03.01-30-0027/16
    0 references