Property / budget | |||||||||||||||
2,352,000.0 zloty
| |||||||||||||||
Property / budget: 2,352,000.0 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
564,480.0 Euro
| |||||||||||||||
Property / budget: 564,480.0 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 564,480.0 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 564,480.0 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 21:02, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of water supply infrastructure in Nagoszyn |
Project in Poland financed by DG Regio |
Statements
1,999,200.0 zloty
0 references
2,352,000.0 zloty
0 references
85.0 percent
0 references
1 July 2019
0 references
31 December 2020
0 references
GMINA ŻYRAKÓW
0 references
Celem projektu pn. „Poprawa infrastruktury wodociągowej w miejscowości Nagoszyn” jest zapewnienie dostawy wody spełniającej wymogi sanitarne i jakościowe w oparciu o projektowane do budowy sieci wodociągowej na terenie Gminy Żyraków.Projekt obejmuje następujące zadania inwestycyjne:1. Budowę sieci wodociągowej rozdzielczej wraz z niezbędną armaturą regulacyjną, odcinającą i zabezpieczającą o łączonej długości 6933,50 m, z rur PE 100 szereg SDR 17 o średnicach O225 ÷ O90, na którą składają się:? rura przewodowa PE100 SDR11 dn225x20,5mm PN10 - 6775 m,? rura przewodowa PE100 SDR11 dn110x10,0mm PN10 – 4,0 m,? rura przewodowa PE100 SDR11 dn90x8,2mm PN10 – 154,5 m.Na sieci jako uzbrojenie przewidziano zasuwy odcinające oraz hydranty nadziemne. Istniejący wodociąg azbestowy zostanie wyłączony z eksploatacji z chwilą oddania do użytkowania nowej sieci. Sieć istniejąca zostanie pozostawiona w gruncie jako nieczynny rurociąg.2. Zakup i montaż klimatyzatora w pomieszczeniu hali filtrów na stacji uzdatniania wody w Nagoszynie.3. Zakup i montażu obudowy studni na ujęciu wody w Nagoszynie. (Polish)
0 references
The objective of the project: ‘Improvement of the water supply in Nagoszyn’ water infrastructure is the provision of water meeting health and quality requirements on the basis of the design for the construction of the water mains in the municipality of Żyraków.The Project covers the following investment tasks: 1. Construction of a distribution network along with the necessary regulatory system, shut-off and protection with a combined length of 6 933.50 m, from EP pipes 100 SDR 17 to O225 diameter O90 ÷ O100, consisting of:? a line pipe PE11 SRD225 dn20,5x10mm PN6 775-100 m,? line pipe PE11 SRD110 dn10,0x10mm PN4,0-100 m,? line pipe PE11 SDDR90 dn8,2x10mm PN154,5- m. on the net, cut-off valves and above-ground hydrants are provided. The existing asbestos water supply will be excluded from operation as soon as the new network is put into operation. The existing network will be left as open via pipeline. (2) The purchase and installation of the air conditioner in the filter room of the water treatment station in Nagorzyn 3. The purchase and assembly of the housing of wells on the basis of the Nagy’s water. (English)
0 references
Identifiers
RPPK.04.03.02-18-0030/18
0 references