Waste treatment by plasma gasification process — feasibility study (Q117914): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): The aim of the project is to analyse the feasibility of development related to the development of a process line for the disposal of municipal waste, from waste water treatment plants and others, through the use of plasma in the gasification process, by preparing a feasibility study, the concept and the scope of the planned development work., remove_old_english_translation) |
||
Property / summary | |||
Property / summary: The aim of the project is to analyse the feasibility of development related to the development of a process line for the disposal of municipal waste, from waste water treatment plants and others, through the use of plasma in the gasification process, by preparing a feasibility study, the concept and the scope of the planned development work. (English) / rank | |||
Revision as of 07:00, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Waste treatment by plasma gasification process — feasibility study |
Project in Poland financed by DG Regio |
Statements
42,500.0 zloty
0 references
50,000.0 zloty
0 references
85.0 percent
0 references
30 September 2016
0 references
31 December 2016
0 references
DOROTA SZARNECKA-PLACKO P.P.H. EKO - SYSTEM - POLSKA
0 references
Celem projektu jest analiza wykonalności prac rozwojowych związanych z opracowaniem linii technologicznej do unieszkodliwiania odpadów komunalnych, z oczyszczalni ścieków oraz innych, za pomocą plazmy w procesie zgazowania, poprzez przygotowanie studium zawierającego ocenę wykonalności, koncepcję i zakres planowanych prac rozwojowych. (Polish)
0 references
Identifiers
RPPK.01.02.00-18-0028/15
0 references