Restructuring and extension of the waste water treatment plant in Suchowola (Q117136): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Białostocki / rank | |||
Normal rank |
Revision as of 05:53, 17 July 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Restructuring and extension of the waste water treatment plant in Suchowola |
Project in Poland financed by DG Regio |
Statements
2,844,866.9 zloty
0 references
3,346,902.24 zloty
0 references
85.0 percent
0 references
15 February 2016
0 references
11 June 2021
0 references
CENTROKOM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Podstawowym problemem związanym z funkcjonowaniem oczyszczalni ścieków w Suchowoli jest jej przestarzała technologia pracy oraz braki w zakresie skutecznego systemu kontroli i monitoringu jakości oczyszczonej wody. Obiekt został wybudowany w latach 90-tych XX w. i od momentu oddania do użytkowania przeszedł większą przebudowę dopiero w 2009 roku. Podjęte wtedy działania miały jednak charakter doraźny i obecnie konieczne jest przeprowadzenie kolejnej inwestycji. W ramach przedsięwzięcia przewidziano: * rozbudowę budynku technologicznego o bezpośrednio przylegający boks składowy (wiatę osadu) oraz wykonanie jego nowej elewacji wraz z ociepleniem ścian zewnętrznych i dachu budynku, wymianę stolarki okiennej i drzwiowej, a także wykonanie fundamentów pod maszyny, nowych posadzek i malatury, * adaptację dwóch istniejących komór do celów stabilizacji tlenowej osadu nadmiernego i zbiornika retencyjnego ścieków, * przebudowę istniejących rurociągów technologicznych grawitacyjnych i ciśnieniowych, * modernizację technologii oczyszczalni, przede wszystkim jej uzupełnienie w zakresie odwadniania i higienizacji osadów, * wykonaniu ciągów komunikacyjnych i placów manewrowych o nawierzchni utwardzonej z kostki betonowej do obsługi budynku technologicznego. Beneficjent jest przygotowany do realizacji projektu – posiada tytuł prawny do nieruchomości, jak również uzyskał wszystkie niezbędne pozwolenia. Ponadto wszczęto postępowanie konkurencyjne zmierzające do wyłonienia wykonawcy robót. Przedsięwzięcie jest zgodne z dyrektywą 91/271/EWG, a także Master Planem dla wdrażania tejże dyrektywy, opracowanym na podstawie AKPOŚK 2017. (Polish)
0 references
The main problem with the operation of the waste water treatment plant in Suechol is its outdated technology and the shortcomings of an effective system of control and monitoring of the quality of the water that is being treated. The site was built in the 90s and only underwent a major overhaul since it became operational in 2009. However, the measures taken were urgent and a further investment is now needed. The project provides for: * extension of the technology building with a directly adjacent building block (a precipitate) and the execution of its new façade with insulation of the external walls and roof of the building, replacement of window and door frames, replacement of window frames and doors, upgrading of the existing two chambers for the aerobic stabilisation of excessive sewage sludge and reservoir, * upgrading of existing gravitational and pressure technology pipelines, * upgrading of the plant’s technology, in particular its replenishment in the field of drainage and sanitation of the sludge, * the construction of a paved area with a concrete stone to operate a technological building. The beneficiary is prepared to implement the project, has a legal title to the property, and has obtained all the necessary permits. In addition, competition proceedings were initiated with a view to selecting the contractor for the works. The project complies with Directive 91/271/EEC, as well as in the Master Plan for the implementation of this Directive, which was drawn up on the basis of AKPOŚK 2017. (English)
0 references
Identifiers
RPPD.06.02.00-20-0033/19
0 references