Thermal modernisation of Primary School No 5 in Napomarów (Q114879): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 119,961.6264 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 119,961.6264 Euro / rank | |||||||||||||||
Property / EU contribution: 119,961.6264 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 119,961.6264 Euro / qualifier | |||||||||||||||
|
Revision as of 10:09, 24 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of Primary School No 5 in Napomarów |
Project in Poland financed by DG Regio |
Statements
499,840.11 zloty
0 references
612,266.19 zloty
0 references
81.64 percent
0 references
4 May 2018
0 references
30 November 2018
0 references
GMINA NAMYSŁÓW
0 references
Projekt obejmuje 1 zadanie inwestycyjne, realizowane na istniejącym budynku. Przedmiotem projektu będzie głęboka modernizacja energetyczna budynku Szkoły Podstawowej Nr5 w Namysłowie. Zakres prac obejmuje: modernizację instalacji wewnętrznej c.o., docieplenie dachu dobudowanych pomieszczeń poddasza, docieplenie stropu tarasu, docieplenie ścian zewnętrznych parteru i wykonanie zielonej ściany poprzez obsadzenie ściany zachodniej pnączami samoczepnymi, I piętra i poddasza, docieplenie dachów lukarn krytych papą, docieplenie ścian zewnętrznych parteru pod tarasem, docieplenie stropu nad poddaszem, docieplenie ścian zewnętrznych piwnicy, wykonanie instalacji wentylacji nawiewno-wywiewnej mechanicznej z odzyskiem ciepła, docieplenie dachu istniejących pomieszczeń poddasza, wymiana okien zewnętrznych PCV, docieplenie ścian zewnętrznych przy gruncie, docieplenie podłogi na gruncie piwnicy, modernizacja instalacji c.w.u. poprzez zamontowanie dodatkowego zestawu solarnego(OZE) w oparciu o podgrzewacz biwalentny z wykonaniem rozprowadzeń c.w.u. do pkt poboru, wymiana istniejących drzwi zewnętrznych wejściowych, wymiana źródeł światła i opraw oświetleniowych na energooszczędne-LED. Należy podkreślić, że wszystkie prace wynikają z audytów energetycznych sporządzonych przez osoby posiadające wymagane kwalifikacje (tj. Panowie J. Janeczek, J. Nowak i Andrzej Turowicz). Raport z przeprowadzonego audytu został sporządzony w dn.2017-01-17 i stanowi załącznik do dokumentacji aplikacyjnej. Realizacja projektu planowana jest na ok.6 miesięcy w 2018r. Projekt nie jest przedsięwzięciem partnerskim. Zakres planowanych prac jest spójny z audytami energetycznymi oraz projektem budowlanym. Produkty, jakie powstaną dzięki realizacji projektu to:1 zmodernizowany energetycznie budynek, 1 wybudowana jednostka wytwarzania energii cieplnej z OZE, 0,0054 MWt dodatkowej zdolności wytwarzania energii cieplnej ze źródeł odnawialnych, 751m2 powierzchni użytkowej budynków poddanych termomoder (Polish)
0 references
The project comprises 1 investment tasks, which are being carried out on an existing building. The object of the project will be the deep energy renovation of the basic Nr5 Primary School Building in Napomyak. This work comprises: modernisation of the internal installation of heating equipment, the insulation of the roof of the enclosure, the insulation of the roof of the ground floor and the insulation of the roof of the ground floor and the implementation of the green wall by filling the wall of the ground floor wall and the wall, insulation of the roof of the ground floor under the terrace, insulation of the outer wall of the basement, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, insulation of outdoor walls on the ground, heating of outdoor walls on the ground, retrofitting of existing external doors, replacement of existing external doors, replacement of light sources and luminaires on energy efficient LED. It should be stressed that all the work is the result of energy audits carried out by persons with the required qualifications (i.e.: Mr J. Janeczek, J. Nowak and Mr. Andrzej Turowicz). The audit report was drawn up in 2017-01-17 and is annexed to the application file. The project is planned for 6 months in 2018. The project is not a partnership. The scope of the planned work is consistent with energy audits and the construction project. The products to be produced by the project are 1 modernised energy building, 1 built unit of heat generation from RES, 0,0054 MWt of the additional renewable heat generation capacity, 751 m² of usable building surface of the buildings undergoing Thermomodem. (English)
0 references
Identifiers
RPOP.03.02.01-16-0024/17
0 references