Comprehensive and deep thermal modernisation of the Bofa Building in m. Suchowola (Q105274): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item) |
||||||||||||||
Property / budget | |||||||||||||||
940,311.84 zloty
| |||||||||||||||
Property / budget: 940,311.84 zloty / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
225,674.84 Euro
| |||||||||||||||
Property / budget: 225,674.84 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 225,674.84 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.24 Euro
| |||||||||||||||
Property / budget: 225,674.84 Euro / qualifier | |||||||||||||||
point in time: 13 January 2020
|
Revision as of 18:11, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Comprehensive and deep thermal modernisation of the Bofa Building in m. Suchowola |
Project in Poland financed by DG Regio |
Statements
799,265.05 zloty
0 references
940,311.84 zloty
0 references
85.0 percent
0 references
8 January 2019
0 references
30 November 2021
0 references
GMINA WOHYŃ
0 references
Głów. celem P.: Poprawa jakości środ. natur. na terenie Gminy Wohyń wpływająca na wzrost jakości życia społ. lokalnej oraz zwiększenie konkurencyjności obszaru. C. szczegół. są: 1.Zoptymalizowanie działań zwięk. efektywność energ. sektora publ., 2. Łagodzenie zmian klimatu poprzez ogran. emisji zanieczyszczeń do atmosfery, 3. Zwiększenie wykorzystania energii poch. z OZE. Grupa docel.: użytkownicy budynku ZSZ w Suchowoli (uczniowie i nauczyciele), pozostali mieszkańcy i podm. funkcjon. na terenie Gminy Wohyń. Pow. użytk. budynku ZSZ w Suchowoli 1441,96m2. Rezultatami proj. będą: Ilość zaoszczedz. energii cieplnej -1441,28GJ/rok; Ilość zaoszczędzonej energii elektr.-23,22MWh/rok, Zmniejszenie rocznego zużycia energii pierwotnej w bud. publ.(CI32) -699894,44kWh/rok; Szacowany roczny spadek emisji gazów ciepl.(CI34) - 227,83 t.r. CO2/rok; Prod. energii cieplnej z nowo wybud./nowych mocy wytwór. instalacji wykorzyst. OZE -212,71MWht/rok; Prod. energii elekt.z nowo wybud./nowych mocy wytwórczych instalacji wykorzyst. OZE-2,27MWhe/rok;Dodat. zdolność wyt. energii z OZE(CI30)-0,10232MW. Produkty: Liczba wybud. jednostek wytwarzania energii elektr. z OZE-1szt., Liczba wybud. jedn. wytwarzania energii cieplnej z OZE-1szt.; Liczba zmodern.energet.budynków-1szt.;Liczba budynk. dostosow.do potrzeb osób z niepełnospr.-1szt. Zakres obejm. wykonanie prac termomod.: *dociepl. stropu wewn., *ocieplenie ścian zew., *wymianę stolarki okienno-drzwiowej, *montaż kotła na biomasę o mocy 100kW, *montaż instalacji fotowolt.o mocy 2,32 kW, *wymiana instalacji co.; *moderniz. kotłowni, *montaż grzejn. stal.płytowych z zaworami i głowicami termostat.; *wykonanie robót towarzysz., *wym. oświetlenia na LED. Wydatki niekwalfik. - zakup schodolazu i dostos. łazienek dla potrzeb osób z niepełnospr. Zg. z audytem energ. efektywność energet. budynku wzrośnie o 61,44%; wybrano wariant inwest. dla OZE-kocioł na biomasę 100kW(s.30) i inst. fotowoltaiczna 2,32kW (s.38) Proj. zgodny z POP dla strefy lub. (Polish)
0 references
The main objectives of P.: Improving the quality of the local area and increasing the competitiveness of the local area and increasing the competitiveness of the area. The details of which are: 1.Optimisation of activities to increase energy efficiency in the public sector, 2. Mitigating climate change by atmospheric emissions, 3. Increasing the use of energy from renewable sources. Target group: users of the ZZ building in Suchowola (students and teachers), other inhabitants and substations in the municipality of Wolhyń. Area of operation of the SRZ in Suhowola 1 441.96 m². They will: Quantity in default heat 1441,28 GJ/year; Amount of electric energy saved — 23.22 MWh/year, Reduction of annual primary energy consumption in public pul. (CI32) -699 894.44 kWh/year; Estimated annual decrease in gas emissions (CI34) — 227,83 by T.R. CO2/rok; Production of heat from the new/new power plant. RES -212,71MWt/year; Production of electricity from new/new generation capacity of an installation. OF-2,27MWhe/year; additional Energy Capacity from RES (CI30) -0.10232 MW. Products: Number of units generating electricity generation from EEE-1k. Number of modern energy refurbishment -1 buildings, Number of modernised buildings — persons with disabilities — 1 The scope of completion of the work. * ext., * insulation of the wall of the wall, * replacement of window/door frames, * installation of a biomass boiler with a power of 100 kW, * installation of a foam-tube installation with a power of 2.32 kW, * replacement of the installation as. * retrofitting for boiler rooms, * Assembly of steel radiators, with taps and thermostat heads.; * the execution of works., * out of LED lighting. Expenditure not in respect of the costs of expenditure for expenditure on expenditure not in respect of non-member countries. Purchase of the staircase and of the bathroom for the needs of disabled persons. The energy efficiency estimate of the building will increase by 61.44 %; the investment option was selected. for the OGE-boiler biomass 100 kW (p. 30) and a photovoltaic (PV) 2.32 kW (p. 38), the option is in line with the POP for the zone or. (English)
0 references
Identifiers
RPLU.05.02.00-06-0023/19
0 references