Increasing the energy efficiency of public utility facilities, i.e. the building of the Municipal Office of the City and the Municipality and the building of the School Complex in Witnica. (Q100326): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Gorzowski / rank | |||
Normal rank |
Revision as of 04:52, 16 July 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing the energy efficiency of public utility facilities, i.e. the building of the Municipal Office of the City and the Municipality and the building of the School Complex in Witnica. |
Project in Poland financed by DG Regio |
Statements
1,927,747.41 zloty
0 references
2,267,938.14 zloty
0 references
85.0 percent
0 references
1 October 2015
0 references
31 July 2019
0 references
GMINA WITNICA
0 references
Przedmiotem projektu jest termomodernizacja oraz budowa elektrycznej instalacji fotowoltaicznej na budynku Urzędu Miasta i Gminy oraz na budynku Zespołu Szkolno-Przedszkolnego w Witnicy. Przedsięwzięcie zaplanowane zostało w celu: - zmniejszenia kosztów zużycia energii przez Wnioskodawcę – cel bezpośredni; - ograniczenia negatywnego wpływu na środowisko związanego z produkcją i zużyciem energii w sposób tradycyjny, z wykorzystaniem paliw nieodnawialnych – cel pośredni; - wzrost udziału produkcji z OZE na terenie województwa – cel pośredni; - podniesienie efektywności ogrzewania; - poprawa stanu środowiska naturalnego poprzez zmniejszenie emisji gazów cieplarnianych i substancji; - poprzez ocieplenie ścian, wymianę okien i drzwi - usprawnienie wentylacji pomieszczeń, podniesienie komfortu termicznego osób korzystających z budynku. Przeprowadzone prace wpłyną na poprawę mikroklimatu pomieszczeń i w przypadku budynku szkolno-przedszkolnego stworzą lepsze warunki do nauki. W ramach projektu planuje się realizację następujących zadań: Prace przygotowawcze: 1. Sporządzenie dokumentacji technicznej 2. Sporządzenie Studium wykonalności 3. Przygotowanie dokumentacji dot. postępowania dla wyboru wykonawcy inwestycji 4. Ogłoszenie postępowania na realizację inwestycji 5. Rozstrzygnięcie postępowania; podpisanie umowy z wykonawcą inwestycji Termomodernizacja UMiG: 1. Docieplenie ścian zewnętrznych 2. Docieplenie dachu 3. Wymiana stolarki okiennej i drzwiowej 4. Poprawa sprawności cieplnej systemu grzewczego Termomodernizacja Szkoły: 1. Docieplenie ścian zewnętrznych – szkoła 2. Docieplenie ścian zewnętrznych – sala gimnastyczna i łącznik 3. Docieplenie dachu 4. Wymiana stolarki okiennej i drzwiowej 5. Poprawa sprawności cieplnej systemu grzewczego Budowa instalacji fotowoltaicznej w Urzędzie Miasta i Gminy oraz w Zespole Szkolno-Przedszkolnym: 1. Montaż systemu mocowania 2. Montaż i konfiguracja paneli fotowoltaicznych (Polish)
0 references
The project is a thermal renovation and the construction of a electrical photovoltaic installation on the premises of the Town Hall and Local Authority and at the School and School Team in Witnicer. The project is designed to: — a reduction in the cost of energy consumption by the Applicant — direct objective; — to reduce the negative environmental impacts associated with the production and use of energy on a traditional basis, using non-renewable fuels — an intermediate target; The increase in the share of production from RES in the region is an increase in the intermediate target; Increasing the efficiency of heating; Improving the environment by reducing greenhouse gases and substances; — by insulation of walls, replacement of windows and doors — improvement of space ventilation, improvement of the thermal comfort of those using the building. The work carried out will improve the microclimate of the rooms and, in the case of a school and nursery building, will create better conditions for learning. The project intends to carry out the following tasks: Preparatory works: 1. The drawing up of technical documentation 2. Draw up a feasibility study 3. Preparation of documentation for the selection of the contractor for the investment 4. The announcement of the procedure for the implementation of the investment 5. The resolution of the proceedings; signature of the agreement with the Fusion investment contractor for the thermal modernisation of the UMiG: 1. Insulation of external walls 2. Insulation of roof 3. Replacement of window and door frames 4. Improving the thermal efficiency of the Thermal Modernisation of the School: 1. Insulation of external walls — school 2. Insulation of external walls — gym and link 3. Insulation of roof 4. Replacement of window and door frames 5. Improving the thermal efficiency of the heating system for the construction of a photovoltaic installation in the Town and Local Authority and in the School and School Group: 1. Mounting of the 2 attachment system. Installation and configuration of solar panels (English)
0 references
Identifiers
RPLB.03.02.01-08-0042/16
0 references