Modernisation of the system of 35B63 network water pumps at PGE GiEK S.A. Oddział Elektrociepłownia Kielce (Q84439): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): The modernisation of the 35B63 pumps is intended to increase efficiency in relation to its initial efficiency.The investor expects that the equipment of pumps in the new propulsion system will lead to an increase in the efficiency of pumping, the matching of pumps with the required adjustment fields and a reduction in demand for electric power, resulting in a saving in electricity.In addition, it is also important to secure the high reliabilit...) |
||
Property / summary | |||
Property / summary: The modernisation of the 35B63 pumps is intended to increase efficiency in relation to its initial efficiency.The investor expects that the equipment of pumps in the new propulsion system will lead to an increase in the efficiency of pumping, the matching of pumps with the required adjustment fields and a reduction in demand for electric power, resulting in a saving in electricity.In addition, it is also important to secure the high reliability of the work of modernised pumping plants and to ensure that customers continue to supply heat.The purpose of the project is to:— the modernisation of 35B63 pumps with the use of new materials and implementation technologies, which will make it possible to improve the performance of the parameters in terms of factory status;— replacement of existing ring engines and associated system cascades for cages in conjunction with frequency changers to be performed by means of the power supply, control and control of the NQC15AAP101 and NQC25AAP101 network pumps with a engine of 800 kW 690 V 50 Hz based on frequency changers. (English) / rank | |||
Revision as of 13:02, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the system of 35B63 network water pumps at PGE GiEK S.A. Oddział Elektrociepłownia Kielce |
Project in Poland financed by DG Regio |
Statements
1,050,000.0 zloty
0 references
1,400,000.0 zloty
0 references
75.0 percent
0 references
24 April 2018
0 references
30 April 2019
0 references
PGE ENERGIA CIEPŁA SPÓŁKA AKCYJNA
0 references
Modernizacja parametrowa pomp 35B63 ma na celu podniesienie sprawności w stosunku do jej pierwotnej sprawności fabrycznej. Inwestor oczekuje, że wyposażenie pomp w nowe układy napędowe doprowadzi do wzrostu sprawności pompowania, dopasowania pracy pomp do wymaganych pól regulacji oraz obniżenia zapotrzebowania na moc elektryczną, co w efekcie końcowym przełoży się na oszczędność energii elektrycznej. Dodatkowo duże znaczenie przykłada się też do uzyskania wysokiej niezawodności pracy zmodernizowanych zespołów pompowych oraz zapewnienia odbiorcy ciągłości dostaw ciepła. Celem Projektu jest: - modernizacja pomp 35B63 z zastosowaniem nowych materiałów i technologii wykonania, co umożliwi poprawienie uzyskiwanych parametrów względem stanu fabrycznego; - wymiana istniejących silników pierścieniowych i współpracujących z nimi układów kaskad zaworowych na silniki klatkowe współpracujące z przemiennikami częstotliwości, które zostaną zrealizowane przez wykonanie układu zasilania, sterowania i regulacji pomp wody sieciowej NQC15AP101 i NQC25AP101 z silnikami 800 kW 690 V 50 Hz w oparciu o przemienniki częstotliwości. (Polish)
0 references
Identifiers
POIS.01.02.00-00-0008/18
0 references