Developing the infrastructure base for social purposes (Q139090): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): In order to create an appropriate quality of space and space, the following tasks will be carried out: “Building an infrastructure base for social purposes”, which will set up projects such as: • Construction of TSOs with towers and equipment• Construction of an external chamber and pitch• Performance of fencing and lighting of the project will create an attractive and safe space for increasing the population’s integration and increasing the q...)
Property / summary
In order to create an appropriate quality of space and space, the following tasks will be carried out: “Building an infrastructure base for social purposes”, which will set up projects such as: • Construction of TSOs with towers and equipment• Construction of an external chamber and pitch• Performance of fencing and lighting of the project will create an attractive and safe space for increasing the population’s integration and increasing the quality of life of the area’s inhabitants. The procedural interface of the project will be ensured by involving the project staff with experience of project implementation, with years of experience in the administration, familiar with the framework provided for by the competition procedures. Implementation: the project will be carried out in a “projectj and Explosion” mode, an open tender procedure launched by the contractor on the basis of and in accordance with the wording of the Public Procurement Law Act. After the contractor has been selected, the contractor will prepare project documentation and gain the necessary permits/permits/arrangements and other documents and studies necessary for the implementation of the project. It will then purchase the relevant materials and will carry out the construction work to be supervised by the supervising inspector. 88f09b6dd. The project will be deemed to be completed once the works and all the documents have been received. The indicators and results of the project will be monitored at regular intervals (at least once per year) by their designated persons. (English)
 
Property / summary: In order to create an appropriate quality of space and space, the following tasks will be carried out: “Building an infrastructure base for social purposes”, which will set up projects such as: • Construction of TSOs with towers and equipment• Construction of an external chamber and pitch• Performance of fencing and lighting of the project will create an attractive and safe space for increasing the population’s integration and increasing the quality of life of the area’s inhabitants. The procedural interface of the project will be ensured by involving the project staff with experience of project implementation, with years of experience in the administration, familiar with the framework provided for by the competition procedures. Implementation: the project will be carried out in a “projectj and Explosion” mode, an open tender procedure launched by the contractor on the basis of and in accordance with the wording of the Public Procurement Law Act. After the contractor has been selected, the contractor will prepare project documentation and gain the necessary permits/permits/arrangements and other documents and studies necessary for the implementation of the project. It will then purchase the relevant materials and will carry out the construction work to be supervised by the supervising inspector. 88f09b6dd. The project will be deemed to be completed once the works and all the documents have been received. The indicators and results of the project will be monitored at regular intervals (at least once per year) by their designated persons. (English) / rank
Normal rank
 

Revision as of 19:47, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Developing the infrastructure base for social purposes
Project in Poland financed by DG Regio

    Statements

    0 references
    1,004,250.0 zloty
    0 references
    241,020.0 Euro
    13 January 2020
    0 references
    1,339,000.0 zloty
    0 references
    321,360.0 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    10 January 2020
    0 references
    30 August 2021
    0 references
    GMINA RYMAŃ
    0 references
    0 references
    W celu stworzenia odpowiedniej jakości warunków oraz przestrzeni, realizowane będą następujące zadania: „ Rozbudowa bazy infrastrukturalnej na cele społeczne”, w ramach której stworzone zostaną takie przedsięwzięcia jak: • Budowa remizy OSP z salą wiejską i wyposażeniem • Budowa siłowni zewnętrznej i boiska • Wykonanie ogrodzenia i oświetlenia Rezultatem realizacji projektu będzie stworzenie atrakcyjnej i bezpiecznej przestrzeni umożliwiającej zwiększenie integracji mieszkańców oraz podniesienie jakości życia mieszkańców obszaru. Płaszczyzna proceduralna projektu zostanie zapewniona przez zaangażowanie w realizację projektu kadry posiadającej doświadczenie w realizacji projektów, z wieloletnim doświadczeniem w administracji, znających ramy przewidziane przez procedury konkursowe. Wdrażanie: projekt realizowany będzie w trybie „zaprojektuj i wybuduj”, wykonawcę prac wyłoni przetarg nieograniczony, ogłoszony w oparciu i zgodnie z brzmieniem ustawy prawo zamówień publicznych. Po wyłonieniu wykonawcy, wykonawca przygotuje dokumentację projektową oraz zdobędzie niezbędne zezwolenia/pozwolenia/uzgodnienia i inne dokumenty oraz analizy konieczne do realizacji projektu. Następnie zakupi odpowiednie materiały i przeprowadzi roboty budowlane, które będą nadzorowane przez inspektora nadzoru Wydruk kontrolny, suma kontrolna: 88f09b6dcd budowlanego. Realizacja projektu zostanie uznana za zakończoną po dokonaniu odbioru robót i wszystkich dokumentów. Wskaźniki i efekty realizacji projektu będą monitorowane w regularnych odstępach czasu (co najmniej raz na rok) przez wyznaczone do tego osoby (Polish)
    0 references

    Identifiers

    RPZP.09.03.00-32-0075/18
    0 references