“Management and development of public spaces in Orléans” (Q132785): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 4,450,492.19 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,068,118.1256000001 Euro / rank | |||||||||||||||
Property / budget: 1,068,118.1256000001 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 1,068,118.1256000001 Euro / qualifier | |||||||||||||||
|
Revision as of 23:27, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Management and development of public spaces in Orléans” |
Project in Poland financed by DG Regio |
Statements
2,602,981.14 zloty
0 references
76.5 percent
0 references
2 August 2016
0 references
31 December 2019
0 references
GMINA ORNETA
0 references
Projekt wpisuje się w założenia SzOOP RPOWiM, dzięki wpływowi projektu na podniesienie atrakcyjności społ. oraz nadaniu walorów funkcjonalnych i estetycznych przestrzeniom objętych projektem, przy uwzględnieniu ich regionalnej tożsamości. Projekt jest również zgodny z celem tematycznym 9–Promowanie włączenia społecznego,walka z ubóstwem i wszelką dyskryminacją oraz celem szczegółowym–lepsza jakość życia społ. zamieszkujących obszary problemowe(punkt 3.7WD). Projekt wiąże się z całkowitym wydatkiem 4 450 492,15 zł. Zgodnie z harmonogramem rzeczowo-finansowym projekt zakłada: prace przygotowawcze, roboty budowlane, nadzór w projekcie, promocja projektu, rezerwa na nieprzewidziane wydatki, studium wykonalności. Projekt przewiduje wykonanie prac w trzech lokalizacjach 1) ul. Ks. Jerzego Popiełuszki • zieleń (obszary biologicznie czynne): • nawierzchnie utwardzone (ciągi piesze, drogi): • nawierzchnie poliuretanowe • obiekty użytkowe • zieleń • mała architektura i urządzenia zabawowe 2) Zagospodarowanie terenów zielonych przy jeziorze Mieczowym: • zieleń (obszary biologicznie czynne, plaża, nawierzchnia pod urządzenia siłowni, opaski i ścieżki dekoracyjne, klomby okalające istniejące drzewa): • nawierzchnie utwardzone (ciągi piesze, ścieżki rowerowe, fontanna): • nawierzchnie poliuretanowe - place zabaw dla dzieci: • elementy drewniane • obiekty użytkowe i urządzenia • mała architektura, urządzenia zabawowe, urządzenia w siłowni 3) Ul. Bażyńskiego - 1 Maja: • zieleń (obszary biologicznie czynne, nawierzchnia pod urządzenia siłowni, opaski i ścieżki dekoracyjne, klomby okalające istniejące drzewa): • nawierzchnie utwardzone (ciągi piesze, ścieżki rowerowe) • nawierzchnie poliuretanowe - place zabaw dla dzieci: • obrzeże chodnikowe • palisada z kruszywa naturalnego • ogrodzenie ze stali ocynk • obiekty użytkowe • mała architektura, urządzenia zabawowe, urządzenia w siłowni. (Polish)
0 references
The project is part of the establishment of the RPOVM project, thanks to the impact of the project on increasing the attractiveness of the project and giving the functional and aesthetic qualities of the projects covered by the project, taking into account their regional identity. The project is also in line with the thematic objective 9 — Promoting social inclusion, combating poverty and any discrimination and in order to improve the quality of life of areas of concern (3.7WD point). The project involves a total expenditure of PLN 4 450 492,15. In line with the material and financial schedule, the project is to: preparatory work, construction work, project monitoring, project promotion, contingency reserve, feasibility study. The project provides for the execution of works in three locations 1) ul. Kp. Jerzy Popiearch• green (biologically active area): • paved surfaces (strings, roads): • polyurethane surfaces• utility-building surfaces• greed• small architecture and toy devices 2) Management of green spaces at the Miód lake: • green areas (biologically active areas, beach, machinery of actuators, wrapping and decoration, Clomors of the existing trees): • paved surfaces (footpaths, cycle paths, fountain): • polyurethane road surfaces — children’s playgrounds: • wooden items• utility facilities and equipment• small architecture, toy devices, machinery in 3) Ul. Banżyński — 1 May: • green areas (biologically active areas, pavement of actuators, armbands and decorative paths, on the one hand, on the one hand, on the other), on the other: • paved surfaces (footpaths, cycle paths)• polyurethane surfaces — children’s playgrounds: • pavement paths from virgin aggregate• fencing from zinc to zinc• utilitarian structures• small architectures, toy devices, machinery in actuators. (English)
0 references
Identifiers
RPWM.08.01.00-28-0049/16
0 references