Thermal modernisation of public buildings located in the municipalities of the Union of Płock Municipalities (Q108956): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 10,247,594.54 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 2,459,422.6895999997 Euro / rank | |||||||||||||||
Property / budget: 2,459,422.6895999997 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 2,459,422.6895999997 Euro / qualifier | |||||||||||||||
|
Revision as of 19:07, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings located in the municipalities of the Union of Płock Municipalities |
Project in Poland financed by DG Regio |
Statements
6,294,838.66 zloty
0 references
80.0 percent
0 references
1 September 2016
0 references
30 September 2018
0 references
ZWIĄZEK GMIN REGIONU PŁOCKIEGO
0 references
Przedmiotowy projekt dotyczy głębokiej termomodernizacji połączonej z wymianą źródeł ciepła oraz zastosowaniem odnawialnych źródeł energii dla 16 budynków użyteczności publicznej zlokalizowanych na terenie Gmin Związku Gmin Regionu Płockiego. Liderem projektu jest Związek Gmin Regionu Płockiego a Parterami (beneficjentami końcowymi) 8 Gmin położonych na jego terenie (łącznie 16 obiektów), tj.: Staroźreby, Bodzanów, Brudzeń Duży, Bulkowo, Gąbin, Gostynin, Nowy Duninów, Radzanowo . Dla obiektów sporządzone zostały Audyty Energetyczne oraz dokumentacja budowlano – wykonawcza wraz z przedmiarami i kosztorysami. Projekt obejmuje rozwiązania kompleksowe, w tym m.in.: ocieplenia budynków, wymianę okien i drzwi, wymianę oświetlenia na energooszczędne, przebudowę systemów grzewczych, przebudowę i budowę systemów wentylacji, instalacje OZE, systemy zarządzania energią. Przedmiotowy projektu nie stanowi dużego projektu w rozumieniu zapisów art.100 Rozporządzenia 1303/2013. Koszt kwalifikowany został indywidualnie wyznaczony na poziomie każdej inwestycji stanowiącej składową projektu i obejmuje: (1) Roboty budowlane i instalacyjne związane bezpośrednio z termomodernizacją i wymienione w Audycie Energetycznym, (2) Koszt Nadzoru Inwestorskiego, (3) Koszt Promocji Projektu, (4) Koszt Sporządzenia Audytu Energetycznego Ex Post. Planowana w projekcie wymiana źródeł ciepła (4 budynki) spełnia wymogi regulaminu tj. generuje zmniejszenie emisji, CO2 powyżej 60% w porównaniu do istniejących instalacji oraz spełnia wymogi określone w środkach wykonawczych do dyrektywy 2009/125/WE z dnia 21 10.2009 r.. Planowane dofinansowanie kosztów kwalifikowanych nie przekracza wartości progowych określonych w Regulaminie Konkursu. Dofinansowanie nie stanowi Pomocy Publicznej, o której mowa w art. 107 Traktatu o funkcjonowaniu Unii Europejskiej. Projekt nie stanowi projektu generującego dochód w rozumieniu art. 61 Rozporządzenia 1303/2013.Projekt jest wykonalny technicznie i instytucjonalnie. (Polish)
0 references
This project concerns deep thermal modernisation combined with the exchange of sources of heat and the use of renewable energy sources for 16 public buildings located in the municipalities of the Union of Płock Municipalities. The project leader is the Union of Płock Municipalities and the partners (the final beneficiaries) of the 8 Municipalities located on its territory (16 sites in total), i.e.: Staroźba, Bozanów, Bruja Duży, Bulkowo, Gobins, Gostynin, Nowy Dwuniów, Radzredefined. The plants were drawn up with an energy audit and a construction file, with a bill of quantities and a cost estimate. The project covers comprehensive solutions including, but not limited to: warming of buildings, replacement of windows and doors, replacement of lighting on energy efficient, upgrading of heating systems, reconstruction and construction of ventilation systems, renewable energy installations, energy management systems. The project in question does not constitute a major project within the meaning of Article 100 of Regulation (EC) No 1303/2013. The eligible cost has been individually set at the level of each investment component of the project and includes: (1) Construction and installation works directly linked to thermal modernisation and listed in the Energy Audit, (2) The Investor Supervisory Authority, (3) The Cost of Promotion of Project, (4) Cost of Ex Post Energy Audit. The replacement of heat sources (4 buildings) planned in the project meets the requirements of the Regulation, i.e. it generates a reduction in emissions, CO2 above 60 % compared to the existing installations and complies with the requirements set out in the implementing measures of Directive 2009/125/EC of 21 10.2009. The planned grant of eligible costs does not exceed the thresholds laid down in the Competition Rules. The aid does not constitute State aid under Article 107 of the Treaty on the Functioning of the European Union. The project does not constitute a revenue-generating project within the meaning of Article 61 of Regulation 1303/2013.Projekt is technically and institutionally feasible. (English)
0 references
Identifiers
RPMA.04.02.00-14-4595/16
0 references