(10577.18102016.097000011_1113)) (Q2155979): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Province of Prato / rank
 
Normal rank

Revision as of 22:10, 16 July 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10577.18102016.097000011_1113))
Project in Italy financed by DG Regio

    Statements

    0 references
    236,940.0 Euro
    0 references
    1,200,000.0 Euro
    0 references
    19.74 percent
    0 references
    22 December 2015
    0 references
    13 June 2021
    0 references
    13 June 2021
    0 references
    COMUNE DI MONTEMURLO
    0 references
    0 references
    0 references

    43°55'37.09"N, 11°2'14.78"E
    0 references
    L?INTERVENTO RIGUARDA LA REALIZZAZIONE DI UN NUOVO ASILO NIDO NELL?AREA DENOMINATA MORECCI, CONTIGUA AL PLESSO SCOLASTICO CHE OSPITA LA SCUOLA ELEMENTARE DEL CAPOLUOGO.L?INTERVENTO VERRA REALIZZATO IN UNA UNICA FASE PREVEDENDO LA REALIZZAZIONE DEL NUOVO EDIFICIO E LA SISTEMAZIONE DELL?AREA PERTINENZIALE. IN QUESTO MODO SARA POSSIBILE COSTRUIRE IL NUOVO ASILO MANTENENDO L?ATTIVITA DELL?ATTUALE NIDO POSTO IN VIA ROSSELLI (EDIFICIO DENOMINATO NOVELLO, OGGETTO DI ALTRA OPERAZIONE DEL PIU), EVITANDO QUINDI DI RICORRERE AD ALTRE STRUTTURE PROVVISORIE. IL PROGETTO PROPONE UNA PIANTA A FORMA RETTANGOLARE, CIO A SEGUITO DELLA PARTICOLARE MORFOLOGIA DEL TERRENO CHE PRESENTA UN DECLIVIO SULL?ASSE NORD ? SUD: SI E RITENUTO QUINDI NECESSARIO POSIZIONARE IL LATO LUNGO DELL?EDIFICIO SULL?ASSE EST-OVEST IN MODO DA RIDURRE GLI SCAVI DI SBANCAMENTO E LE ALTEZZE DEI MURI DI CONTENIMENTO DELLA SCARPATA, E IN MODO TALE DA PORRE ATTENZIONE A FATTORI BIOCLIMATICI, DOVENDO DISPORRE TUTTE E 3 LE SEZIONI SUL FR (Italian)
    0 references
    DOES THE MEASURE RELATE TO THE SETTING UP OF A NEW CRÈCHE IN THE AREA CALLED MORICCI, ADJACENT TO THE SCHOOL NURSERY SCHOOL, WHICH HOSTS THE PRIMARY SCHOOL OF THE CAPOLUOGO.L? ACTION CARRIED OUT IN A SINGLE STEP BY MAKING PROVISION FOR THE CONSTRUCTION OF THE NEW BUILDING AND THE ACCOMMODATION OF THE RELEVANT AREA. IN THIS WAY, WILL IT BE POSSIBLE TO BUILD THE NEW ASYLUM SYSTEM BY MAINTAINING THE ACTIVITY OF THE CURRENT CRÈCHE IN ROSSELLI (“NOVELLO” BUILDING, WHICH IS THE SUBJECT OF ANOTHER OPERATION OF THE PIU), THUS AVOIDING THE USE OF OTHER TEMPORARY STRUCTURES. DOES THE PROJECT PROPOSE A RECTANGULAR TREE, WHICH IS THE RESULT OF THE PARTICULAR MORPHOLOGY OF THE LAND WITH A DECLINE ON THE NORTHERN AXIS? SOUTH: IT WAS THEREFORE CONSIDERED NECESSARY TO POSITION THE LONG SIDE OF THE BUILDING ON THE TES-OVEST BUILDING IN ORDER TO REDUCE THE STRIPPING AND THE HEIGHTS OF THE DOWNSLOPE CONTAINMENT WALLS, AND IN SUCH A WAY AS TO FOCUS ON BIOCLIMATIC FACTORS, REQUIRING ALL 3 SECTIONS ON FR (English)
    0 references

    Identifiers