RIVER ENERGY S.R.L. (Q2038087): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Province of Imperia / rank | |||
Normal rank |
Revision as of 12:20, 16 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | RIVER ENERGY S.R.L. |
Project in Italy financed by DG Regio |
Statements
9,915.0 Euro
0 references
19,830.0 Euro
0 references
50.0 percent
0 references
12 July 2016
0 references
29 August 2018
0 references
15 January 2017
0 references
RIVER ENERGY S.R.L.
0 references
L'INTERVENTO, SINTETICAMENTE, CONTA NELL'INSTALLAZIONE DI UN MISURATORE DI LIVELLO SUL CANALE, IN COMUNICAZIONE CON LA CENTRALE, TALE DA PERMETTERE ALL'OPERATORE DI SAPERE IN TEMPO REALE IL LIVELLO DEL CANALE. IN TEMPO REALE, QUINDI, L'OPERATORE PUO' DECIDERE, QUALORA LA PORTATA DEL CORSO D'ACQUA FOSSE ECCESSIVA, DI CHIUDERE (O REGOLARE) L'ACCESSO AL CANALE PER EVITARE L' INGHIAIAMENTO DEL CANALE, APRIRE (O REGOLARE) LA PARATOIA SULLA DESABBIATRICE, PRESERVANDO DALL'INGHIAIAMENTO IL CANALE, LA VASCA DI CARICO E LA SUCCESSIVA TURBINA. SI RIMANDA ALLA RELAZIONE ALLEGATA PER I DETTAGLI (Italian)
0 references
THE ACTION, IN SUMMARISED FORM, COUNTS IN THE INSTALLATION OF A LEVEL METER ON THE CHANNEL, IN COMMUNICATION WITH THE POWER STATION, ENABLING THE OPERATOR TO KNOW THE LEVEL OF THE CHANNEL IN REAL TIME. IN REAL TIME, THEREFORE, THE OPERATOR MAY DECIDE, IN THE EVENT THAT THE EXTENT OF THE COURSE OF WATER IS EXCESSIVE, TO CLOSE (OR ADJUST) ACCESS TO THE CHANNEL IN ORDER TO AVOID THE SWINGING-UP OF THE CANAL, TO OPEN (OR TO SETTLE) THE GATE ONTO THE DESABBIOATRICE, WHILE PRESERVING THE CHANNEL, THE LOAD TANK AND THE NEXT TURBINE. REFER TO ATTACHED REPORT FOR DETAILS (English)
0 references
Identifiers
G21F18000100007
0 references