MUNICIPALITY OF AGROPOLI (SA) — WORK TO COMPLETE AND RE-WORK THE MUNICIPAL COLLECTION SYSTEM FOR COLLECTION (Q2023094): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in NUTS
 
Property / contained in NUTS: Province of Salerno / rank
 
Normal rank

Revision as of 16:06, 15 July 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
MUNICIPALITY OF AGROPOLI (SA) — WORK TO COMPLETE AND RE-WORK THE MUNICIPAL COLLECTION SYSTEM FOR COLLECTION
Project in Italy financed by DG Regio

    Statements

    0 references
    5,647,356.62 Euro
    0 references
    7,529,808.83 Euro
    0 references
    75.0 percent
    0 references
    28 January 2013
    0 references
    31 December 2018
    0 references
    COMUNE DI AGROPOLI
    0 references
    0 references
    0 references

    40°20'48.88"N, 14°59'47.58"E
    0 references
    IL SISTEMA FOGNARIO DI AGROPOLI ATTUALMENTE HA UN FUNZIONAMENTO CARATTERIZZATO DA COLLETTORI DI TIPO MISTO. IL PROGETTO PERSEGUE I SEGUENTI OBIETTIVI A) COMPLETARE LA RETE FOGNARIA ESISTENTE, B) RIFUNZIONALIZZARE ED ADEGUARE ALLE ESIGENZE REALI DEL COMUNE LA RETE FOGNARIA ESISTENTE C) CONTRIBUIRE ALLA REALIZZAZIONE DI UNA RETE FOGNARIA CITTADINA DI TIPO SEPARATA,I COLLETTORI ACQUE BIANCHE PREVISTI DA PROGETTO CONSENTONO DI SGRAVARE DELLE ACQUE BIANCHE I COLLETTORI MISTI ESISTENTI E LA RETE FOGNARIA ESISTENTE A SEGUITO DEGLI INTERVENTI DI PROGETTO SVOLGERà IL COMPITO DI CONVOGLIARE ESCLUSIVAMENTE LE ACQUE NERE (SOMMA DELLE ACQUE FECALI E DELLE ACQUE DI PRIMA PIOGGIA).A TALE SCOPO VERRANNO REALIZZATE NUOVE CONDOTTE FOGNARIE IN P.V.C. ED IN PEAD PE 100 E PEAD SPIRALATO E INTERVENTI VOLTI ALLA REGIMAZIONE DELLE ACQUE METEORICHE CON LA REALIZZAZIONE DI COLLETTORI PER LE SOLE ACQUE DI PIOGGIA. IN PARTICOLARE VERRANNO REALIZZATE DUE VASCHE DI PRIMA PIOGGIA (AREA PO (Italian)
    0 references
    AGROPOLI’S SEWERAGE SYSTEM CURRENTLY OPERATES WITH MIXED TYPES OF COLLECTORS. THE PROJECT PURSUES THE FOLLOWING OBJECTIVES (A) TO COMPLETE THE EXISTING COLLECTING SYSTEM, (B) RECEIVED, AND TO ADAPT TO THE ACTUAL NEEDS OF THE MUNICIPALITY THE EXISTING SEWERAGE NETWORK (C) CONTRIBUTES TO THE IMPLEMENTATION OF A SEPARATE URBAN SEWERAGE NETWORK, THE PLANNED WHITE WATER COLLECTORS WILL MAKE IT POSSIBLE TO RELEASE THE EXISTING MIXED COLLECTORS AND THE COLLECTING SYSTEM EXISTING AS A RESULT OF THE PROJECT OPERATIONS WILL CARRY THE TASK OF CHANNELLING ONLY THE BLACK WATERS (THE SUM OF FAECAL AND WFD WATERS). TO THIS END, NEW SEWER SYSTEMS WILL BE CARRIED OUT ON THE WATER SUPPLY (SUM OF THE FAECAL AND WFD WATERS). TO THIS END, NEW SEWER SYSTEMS WILL BE CARRIED OUT AS PART OF THE COLLECTION OF SEWERS IN SECTIONS V. AND PE 100 AND PEAD SPIRALATE AND THE DEVELOPMENT OF RAINWATER DRAINAGE THROUGH COLLECTORS ONLY FOR RAIN WATER. IN PARTICULAR, TWO FIRST RAINY BASINS (PO AREA) WILL BE IMPLEMENTED. (English)
    0 references

    Identifiers

    I86G13001670002
    0 references