ENERGY EFFICIENCY OF A CLOSED IPES BUILDING, VIA SEEBGG 30 (Q2022809): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: autonomous Province of Bolzano / rank | |||
Normal rank |
Revision as of 02:32, 16 July 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY EFFICIENCY OF A CLOSED IPES BUILDING, VIA SEEBGG 30 |
Project in Italy financed by DG Regio |
Statements
106,165.0 Euro
0 references
249,800.0 Euro
0 references
42.5 percent
0 references
17 November 2015
0 references
28 February 2018
0 references
ISTITUTO PER L'EDILIZIA SOCIALE DELLA PROVINCIA AUTONOMA DI BOLZANO
0 references
L¿EDIFICIO RESIDENZIALE é DI PROPRIETà DELL' IPES E CONSTA DI 3 ALLOGGI. AL PIANO INTERRATO CI SONO LE CANTINE E I VANI TECNICI; AL PIANO TERRA E AL PRIMO PIANO SONO DISTRIBUITI I 3 ALLOGGI, UNO DEI QUALI DUPLEX.\NL¿EDIFICIO HA PIù DI 30 ANNI. IL PROGETTO DI RISANAMENTO PREVEDE PRINCIPALMENTE LA RIQUALIFICAZIONE ENERGETICA DELL¿EDIFICIO.\NNEL DETTAGLIO SARANNO EFFETTUATI I SEGUENTI LAVORI:\N- APPLICAZIONE DELLA COIBENTAZIONE SUI MURI PERIMETRALI\N- COIBENTAZIONE DEL SOLAIO DI CANTINA E DELL¿ULTIMO SOLAIO SOTTO IL TETTO\N- COIBENTAZIONE DEI BALCONI E RINNOVO DELLA PAVIMENTAZIONE\N- ADEGUAMENTO DELLE ALTEZZE DEI PARAPETTI (BALCONI, SCALE)\N- SOSTITUZIONE DEI SERRAMENTI, DELLE PORTE D¿INGRESSO E DEI PORTONI DEL GARAGE\N- MONTAGGIO DELLA LINEA VITA SULLA COPERTURA\N- ADATTAMENTO DELL¿IMPIANTO ELETTRICO E MONTAGGIO DI UN IMPIANTO SATELLITARE CENTRALIZZATO\N- LAVORI DI MANUTENZIONE ESTERNI: RINNOVO DEL MANTO DI CUBETTI NEL CORTILE E ELIMINAZIONE DI BARRIERE ARCHITETTONICHE (P.E. SOG (Italian)
0 references
MY RESIDENTIAL BUILDINGS WILL BE OWNED BY THE IPES AND CONSIST OF 3 DWELLINGS. THE BASEMENT IS RESPONSIBLE FOR THE CELLARS AND THE TECHNICAL ROOMS; ON THE GROUND FLOOR AND THE FIRST FLOOR, THE 3 HOUSING UNITS ARE DISTRIBUTED, ONE OF WHICH IS A DUPLEX. THE CONSOLIDATION PLAN MAINLY INCLUDES THE ENERGY RENOVATION OF THE BUILDING.\ NIN DETAIL, THE FOLLOWING WORKS WILL BE CARRIED OUT:\ N- APPLICATION OF THE PERIMETER WALLS\ N- INSULATION OF THE WINE CELLAR AND OF THE LAST SOLDER UNDER THE ROOF\ N- INSULATION OF BALCONIES AND RENOVATION OF THE HEIGHT OF RAILINGS (BALCONIES, STAIRCASES)\ N- ADAPTATION OF THE HEIGHT OF THE GUARD RAILS (BALCONIES, STAIRCASES)\ N- REPLACEMENT OF WINDOW AND DOOR FRAMES ON THE FRONT LINE ON THE COVERAGE\ N- ADAPTATION OF THE ELECTRICAL INSTALLATION AND INSTALLATION OF A CENTRALISED SATELLITE SYSTEM\ N- MAINTENANCE WORK: RENEWAL OF CUBES IN THE COURTYARD AND ELIMINATION OF ARCHITECTURAL BARRIERS (P.E. SOG (English)
0 references
Identifiers
E19F14000040003
0 references