Improving water quality and reducing flood risk (Q4404141): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: total cost of selected operations (P577569): 884,093,211.11 euro, remove outdated Cohesion Data information) Tag: Manual revert |
(Changed an Item: Modifying item Q4404141; priority_axis 2014CZ16M1OP002-1) |
||||||||||||||
Property / total cost of selected operations | |||||||||||||||
889,654,360.01 Euro
| |||||||||||||||
Property / total cost of selected operations: 889,654,360.01 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / total cost of selected operations: 889,654,360.01 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 889,654,360.01 Euro / qualifier | |||||||||||||||
Property / total cost of selected operations: 889,654,360.01 Euro / qualifier | |||||||||||||||
point in time: 30 September 2023
|
Latest revision as of 10:30, 22 December 2023
priority axis of 2014CZ16M1OP002
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving water quality and reducing flood risk |
priority axis of 2014CZ16M1OP002 |
Statements
889,654,360.01 Euro
0 references
Identifiers
2014CZ16M1OP002-1
0 references