Construction of the Bydgoszcz West – Piła Krzewina line with the extension of the station in this line (Q84409): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / contained in Local Administrative Unit: Sicienko / qualifier
 
Property / contained in NUTS: Bydgosko-toruński / qualifier
 
Property / contained in NUTS: Inowrocławski / qualifier
 
Property / contained in NUTS: Pilski / qualifier
 

Revision as of 09:08, 15 January 2024

Project Q84409 in Poland
Language Label Description Also known as
English
Construction of the Bydgoszcz West – Piła Krzewina line with the extension of the station in this line
Project Q84409 in Poland

    Statements

    0 references
    71,352,158.3 zloty
    0 references
    15,861,584.79 Euro
    13 January 2020
    0 references
    71,352,158.3 zloty
    0 references
    15,861,584.79 Euro
    13 January 2020
    0 references
    100.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2019
    0 references
    POLSKIE SIECI ELEKTROENERGETYCZNE S.A
    0 references
    0 references
    0 references

    53°11'31.78"N, 17°49'31.80"E
    0 references

    53°5'41.42"N, 17°35'50.64"E
    0 references

    53°9'27.83"N, 16°53'34.84"E
    0 references
    W ramach Projektu przewidziano budowę dwutorowej linii 400 kV Bydgoszcz Zachód – Piła Krzewina oraz rozbudowę stacji Bydgoszcz Zachód. Trasa linii zlokalizowana jest na terenie województw: wielkopolskiego oraz kujawsko – pomorskiego, gmin: Białe Błota, Sicienko, Nakło nad Notecią, Mrocza, Sadki, Wyrzysk, Białośliwie, Wysoka, Miasteczko Krajeńskie, Kaczory. Stacja elektroenergetyczna 220/110 kV Bydgoszcz Zachód położona jest na terenie miejscowości Lipniki w gminie Białe Błota, w powiecie bydgoskim, w województwie kujawsko-pomorskim. Projekt realizowany jest na obszarze słabiej rozwiniętym. (Polish)
    0 references
    The project included the construction of a two-track line 400 kV Bydgoszcz West – Piła Krzewina and the expansion of Bydgoszcz West station. The line route is located in the voivodships: Wielkopolskie and Kujawsko-Pomorskie, communes: White Mud, Sicienko, Notebook, Dark, Sadki, Wyrzysk, Białośliwie, High, Krajeńskie Town, Ducks. Power station 220/110 kV Bydgoszcz West is located in Lipniki in the Białe Błota commune, in Bydgoszcz County, Kujawsko-Pomorskie Voivodeship. The project is implemented in a less developed area. (English)
    14 October 2020
    0 references
    Dans le cadre du projet, la construction d’une ligne à deux voies de 400 kV Bydgoszcz Zachód — Piła Krzewina et l’extension de la station Bydgoszcz Zachód. L’itinéraire de la ligne est situé dans les voïvodies: Wielkopolski et Kujawsko-Pomorskie, municipalités: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La centrale électrique 220/110 kV Bydgoszcz Zachód est située à Lipniki, dans la municipalité de Białe Błota, dans le district de Bydgoszcz, dans la voïvodie de Kujawsko-Pomorskie. Le projet est mis en œuvre dans une zone moins développée. (French)
    30 November 2021
    0 references
    Im Rahmen des Projekts wurde der Bau einer zweigleisigen Linie 400 kV Bydgoszcz Zachód – Piła Krzewina und der Ausbau des Bahnhofs Bydgoszcz Zachód durchgeführt. Die Strecke befindet sich in den Woiwodschaften: Wielkopolski und Kujawsko-Pomorskie, Gemeinden: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Enten. Das Kraftwerk 220/110 kV Bydgoszcz Zachód befindet sich in Lipniki in der Gemeinde Białe Błota, im Bezirk Bydgoszcz, in der Woiwodschaft Kujawsko-Pomorskie. Das Projekt wird in einem weniger entwickelten Bereich umgesetzt. (German)
    7 December 2021
    0 references
    Als onderdeel van het project, de bouw van een twee-spoor lijn 400 kV Bydgoszcz Zachód — Piła Krzewina en uitbreiding van het station Bydgoszcz Zachód. De route van de lijn bevindt zich in de voivodships: Wielkopolski en Kujawsko-Pomorskie, gemeenten: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Bydgoszcz Zachód is gelegen in Lipniki in de gemeente Białe Błota, in het district Bydgoszcz, in het woiwodschap Kujawsko-Pomorskie. Het project wordt uitgevoerd in een minder ontwikkeld gebied. (Dutch)
    16 December 2021
    0 references
    Nell'ambito del progetto, la costruzione di una linea a due binari da 400 kV Bydgoszcz Zachód — Piła Krzewina e l'ampliamento della stazione di Bydgoszcz Zachód. Il percorso della linea si trova nei voivodati: Wielkopolski e Kujawsko-Pomorskie, comuni: Fango bianco, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Alto, Città di campagna, Anatra. La centrale elettrica 220/110 kV Bydgoszcz Zachód si trova a Lipniki nel comune di Białe Błota, nel distretto di Bydgoszcz, nel Voivodato di Kujawsko-Pomorskie. Il progetto è in fase di realizzazione in un'area meno sviluppata. (Italian)
    16 January 2022
    0 references
    Como parte del proyecto, la construcción de una línea de dos vías 400 kV Bydgoszcz Zachód — Piła Krzewina y ampliación de la estación de Bydgoszcz Zachód. La ruta de la línea se encuentra en los voivodatos: Wielkopolski y Kujawsko-Pomorskie, municipios: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. La central eléctrica 220/110 kV Bydgoszcz Zachód se encuentra en Lipniki, en el municipio de Białe Błota, en el distrito de Bydgoszcz, en el Voivodato de Kujawsko-Pomorskie. El proyecto se está ejecutando en un área menos desarrollada. (Spanish)
    19 January 2022
    0 references
    Som en del af projektet, opførelsen af en tosporet linje 400 kV Bydgoszcz Zachód — Piła Krzewina og udvidelse af Bydgoszcz Zachód station. Linjens rute er placeret i voivodskaberne: Wielkopolski og Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ands. Kraftværket 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota i bydelen Bydgoszcz i Kujawsko-Pomorskie Voivodeship. Projektet gennemføres i et mindre udviklet område. (Danish)
    26 July 2022
    0 references
    Στο πλαίσιο του έργου, η κατασκευή μιας διπλής γραμμής γραμμής 400 kV Bydgoszcz Zachód — Piła Krzewina και η επέκταση του σταθμού Bydgoszcz Zachód. Η διαδρομή της γραμμής βρίσκεται στα βοεβοδάτα: Wielkopolski και Kujawsko-Pomorskie, δήμοι: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Ο σταθμός παραγωγής ηλεκτρικής ενέργειας 220/110 kV Bydgoszcz Zachód βρίσκεται στο Lipniki του δήμου Białe Błota, στην περιφέρεια Bydgoszcz, στο Voivodeship Kujawsko-Pomorskie. Το έργο υλοποιείται σε λιγότερο ανεπτυγμένη περιοχή. (Greek)
    26 July 2022
    0 references
    Kao dio projekta, izgradnja dvokolosiječne linije 400 kV Bydgoszcz Zachód – Piła Krzewina i proširenje postaje Bydgoszcz Zachód. Ruta linije nalazi se u voivodships: Wielkopolski i Kujawsko-Pomorskie, općine: Bijelo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Visoka, Country Town, Patke. Elektrana 220/110 kV Bydgoszcz Zachód nalazi se u mjestu Lipniki u općini Białe Błota, u okrugu Bydgoszcz, u Kujawsko-pomorskom vojvodstvu. Projekt se provodi u manje razvijenim područjima. (Croatian)
    26 July 2022
    0 references
    Ca parte a proiectului, construirea unei linii cu două linii 400 kV Bydgoszcz Zachód – Piła Krzewina și extinderea stației Bydgoszcz Zachód. Traseul liniei este situat în voievodate: Wielkopolski și Kujawsko-Pomorskie, comune: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Centrala electrică 220/110 kV Bydgoszcz Zachód este situată în Lipniki, în comuna Białe Błota, în districtul Bydgoszcz, în Voievodatul Kujawsko-Pomorskie. Proiectul este implementat într-o zonă mai puțin dezvoltată. (Romanian)
    26 July 2022
    0 references
    Súčasťou projektu je výstavba dvojkoľajovej trate 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšírenie stanice Bydgoszcz Zachód. Trasa linky sa nachádza vo vojvodstvách: Wielkopolski a Kujawsko-Pomorskie, obce: Biely bahno, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektráreň 220/110 kV Bydgoszcz Zachód sa nachádza v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorskom vojvodstve. Projekt sa realizuje v menej rozvinutej oblasti. (Slovak)
    26 July 2022
    0 references
    Bħala parti mill-proġett, il-kostruzzjoni ta’ linja b’żewġ linji 400 kV Bydgoszcz Zachód — Piła Krzewina u l-estensjoni tal-istazzjon Bydgoszcz Zachód. Ir-rotta tal-linja tinsab fil-voivodships: Wielkopolski u Kujawsko-Pomorskie, muniċipalitajiet: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Pajjiż Town, Ducks. L-impjant tal-enerġija 220/110 kV Bydgoszcz Zachód jinsab f’Lipniki fil-muniċipalità ta’ Białe Błota, fid-distrett ta’ Bydgoszcz, fil-Kujawsko-Pomorskie Voivodeship. Il-proġett qed jiġi implimentat f’żona inqas żviluppata. (Maltese)
    26 July 2022
    0 references
    No âmbito do projeto, a construção de uma linha de duas vias de 400 kV Bydgoszcz Zachód — Piła Krzewina e a ampliação da estação de Bydgoszcz Zachód. A rota da linha está localizada nos voivodships: Wielkopolski e Kujawsko-Pomorskie, municípios: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, Alto, Cidade rural, Patos. A central elétrica 220/110 kV Bydgoszcz Zachód está localizada em Lipniki, no concelho de Białe Błota, no distrito de Bydgoszcz, na voivodia de Kujawsko-Pomorskie. O projeto está a ser executado numa área menos desenvolvida. (Portuguese)
    26 July 2022
    0 references
    Osana hanketta kaksiraiteisen linjan rakentaminen 400 kV Bydgoszcz Zachód – Piła Krzewina ja Bydgoszcz Zachódin aseman laajennus. Linjan reitti sijaitsee voivodialuksilla: Wielkopolski ja Kujawsko-Pomorskie, kunnat: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Voimalaitos 220/110 kV Bydgoszcz Zachód sijaitsee Lipnikissa Białe Błotassa, Bydgoszczin alueella Kujawsko-Pomorskien voivodikunnassa. Hanketta toteutetaan vähemmän kehittyneellä alueella. (Finnish)
    26 July 2022
    0 references
    V okviru projekta je bila zgrajena dvotirna proga 400 kV Bydgoszcz Zachód – Piła Krzewina in razširitev postaje Bydgoszcz Zachód. Pot proge se nahaja v vojvodstvu: Wielkopolski in Kujawsko-Pomorskie, občini: Belo blato, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, race. Elektrarna 220/110 kV Bydgoszcz Zachód se nahaja v Lipnikih v občini Białe Błota, v okrožju Bydgoszcz, v Kujavsko-Pomorjanskem vojvodstvu. Projekt se izvaja na manj razvitem območju. (Slovenian)
    26 July 2022
    0 references
    Součástí projektu je výstavba dvoukolejné trati 400 kV Bydgoszcz Zachód – Piła Krzewina a rozšíření stanice Bydgoszcz Zachód. Trasa trati se nachází v voivodships: Wielkopolski a Kujawsko-Pomorskie, obce: Bílé bláto, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Elektrárna 220/110 kV Bydgoszcz Zachód se nachází v Lipniki v obci Białe Błota, v okrese Bydgoszcz, v Kujawsko-Pomorském vojvodství. Projekt je realizován v méně rozvinuté oblasti. (Czech)
    26 July 2022
    0 references
    Kaip projekto dalis, dviejų bėgių linijos 400 kV Bydgoszcz Zachód – Piła Krzewina statyba ir Bydgoszcz Zachód stoties pratęsimas. Linijos maršrutas yra vaivadijose: Wielkopolski ir Kujawsko-Pomorskie savivaldybės: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, antys. Elektrinė 220/110 kV Bydgoszcz Zachód yra Lipnikyje, Białe Błota savivaldybėje, Bydgoščiaus rajone, Kujavijos Pamario vaivadijoje. Projektas įgyvendinamas mažiau išsivysčiusioje srityje. (Lithuanian)
    26 July 2022
    0 references
    Projekta ietvaros divu sliežu ceļu līnijas būvniecība 400 kV Bydgoszcz Zachód — Piła Krzewina un Bydgoszcz Zachód stacijas paplašināšana. Līnijas maršruts atrodas vojevodistē: Wielkopolski un Kujawsko-Pomorskie pašvaldības: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Pīles. Elektrostacija 220/110 kV Bydgoszcz Zachód atrodas Lipniki Błota pašvaldībā, Bydgoszcz rajonā Kujawsko-Pomorskie vojevodistē. Projekts tiek īstenots mazāk attīstītā teritorijā. (Latvian)
    26 July 2022
    0 references
    Като част от проекта, изграждането на двупистна линия 400 kV Bydgoszcz Zachód — Piła Krzewina и разширение на гара Bydgoszcz Zachód. Маршрутът на линията се намира във воеводствата: Wielkopolski и Kujawsko-Pomorskie, общини: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Електроцентрала 220/110 kV Bydgoszcz Zachód се намира в Липники, община Białe Błota, в областта Bydgoszcz, в Kujawsko-Pomorskie Voivodeship. Проектът се изпълнява в по-слабо развита област. (Bulgarian)
    26 July 2022
    0 references
    A projekt részeként egy 400 kV-os Bydgoszcz Zachód – Piła Krzewina vonal építése és a Bydgoszcz Zachód állomás bővítése. A vonal útvonala a vajdaságban található: Wielkopolski és Kujawsko-Pomorskie települések: Fehér iszap, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, kacsa. A Bydgoszcz Zachód 220/110 kV-os erőmű Białe Błota településen, Lipnikiben, Bydgoszcz kerületben, a Kujawsko-Pomorskie vajdaságban található. A projektet egy kevésbé fejlett területen valósítják meg. (Hungarian)
    26 July 2022
    0 references
    Mar chuid den tionscadal, tógáil líne dhá rian 400 kV Bydgoszcz Zachód — Piła Krzewina agus síneadh ar stáisiún Bydgoszcz Zachód. Tá bealach na líne suite sna voivodships: Wielkopolski agus Kujawsko-Pomorskie, bardais: An Mud Bán, Sicienko, Nakło nad Noteció, Dark, Sadki, Wyrzysk, Białośliwie, Ard, Baile Tuaithe, Duganna. Tá stáisiún cumhachta 220/110 kV Bydgoszcz Zachód lonnaithe i Lipniki i mbardas Białe Błota, i gceantar Bydgoszcz, sa Kujawsko-Pomorskie Voivodeship. Tá an tionscadal á chur i bhfeidhm i gceantar nach bhfuil chomh forbartha sin. (Irish)
    26 July 2022
    0 references
    Som en del av projektet, byggandet av en tvåspårig linje 400 kV Bydgoszcz Zachód – Piła Krzewina och utbyggnad av Bydgoszcz Zachód station. Linjens rutt ligger i vovodskeppen: Wielkopolski och Kujawsko-Pomorskie, kommuner: White Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Ducks. Kraftverk 220/110 kV Bydgoszcz Zachód ligger i Lipniki i kommunen Białe Błota, i distriktet Bydgoszcz, i Kujawsko-Pomorskie Voivodeship. Projektet genomförs i ett mindre utvecklat område. (Swedish)
    26 July 2022
    0 references
    Projekti raames ehitati kaherajaline liin 400 kV Bydgoszcz Zachód – Piła Krzewina ja laiendati Bydgoszcz Zachódi jaama. Liini marsruut asub vojevoodkondades: Wielkopolski ja Kujawsko-Pomorskie, omavalitsusüksused: Valge Mud, Sicienko, Nakło nad Notecią, Dark, Sadki, Wyrzysk, Białośliwie, High, Country Town, Bucks. Elektrijaam 220/110 kV Bydgoszcz Zachód asub Lipnikis Białe Błota omavalitsusüksuses Bydgoszczi piirkonnas Kujawsko-Pomorskie vojevoodkonnas. Projekti rakendatakse vähem arenenud piirkonnas. (Estonian)
    26 July 2022
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: bydgoski
    0 references
    WOJ.: KUJAWSKO-POMORSKIE, POW.: nakielski
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: pilski
    0 references
    6 July 2023
    0 references

    Identifiers

    POIS.01.01.02-00-0001/18
    0 references