Operating aid to overcome the permanent and structural difficulties faced by firms in the region (Q2887373): Difference between revisions
Jump to navigation
Jump to search
(BatchIngestion) |
(Added qualifier: readability score (P590521): 0.0013049793959262) |
||||||
Property / summary: The amount of the project is EUR 104,920.41 corresponding to the expenses presented in 2018 for spending on wages, social security, rents, water consumption, electricity and accounting. (English) / qualifier | |||||||
readability score: 0.0013049793959262
|
Latest revision as of 11:59, 20 March 2024
Project Q2887373 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Operating aid to overcome the permanent and structural difficulties faced by firms in the region |
Project Q2887373 in Portugal |
Statements
6,688.68 Euro
0 references
104,920.41 Euro
0 references
6.38 percent
0 references
1 January 2018
0 references
31 January 2019
0 references
LAVANDARIA AFTERPARTY, LDA
0 references
O montante do projeto é de 104.920,41 correspondente as despesas apresentadas no ano de 2018 para gastos com salários, segurança social, rendas, consumo de água, energia elétrica e contabilidade. (Portuguese)
0 references
The amount of the project is EUR 104,920.41 corresponding to the expenses presented in 2018 for spending on wages, social security, rents, water consumption, electricity and accounting. (English)
8 July 2021
0.0013049793959262
0 references
Le montant du projet s’élève à 1 049 220,41 EUR correspondant aux dépenses présentées en 2018 au titre des salaires, de la sécurité sociale, des loyers, de la consommation d’eau, de l’électricité et des dépenses comptables. (French)
5 December 2021
0 references
Der Betrag des Projekts beläuft sich auf 1 049 920,41 EUR, was den 2018 vorgelegten Ausgaben für Gehalts-, Sozialversicherungs-, Miet-, Wasserverbrauchs-, Strom- und Buchhaltungskosten entspricht. (German)
13 December 2021
0 references
Het bedrag van het project bedraagt 104 920,41 EUR, wat overeenkomt met de uitgaven in 2018 voor salaris, sociale zekerheid, huur, waterverbruik, elektriciteit en boekhoudkundige uitgaven. (Dutch)
19 December 2021
0 references
L'importo del progetto è pari a 104 920,41 EUR, corrispondenti alle spese presentate nel 2018 per la retribuzione, la previdenza sociale, l'affitto, il consumo idrico, l'elettricità e le spese contabili. (Italian)
17 January 2022
0 references
El importe del proyecto asciende a 1 049 220,41 EUR, correspondiente a los gastos presentados en 2018 en concepto de sueldos, seguridad social, alquiler, consumo de agua, electricidad y gastos contables. (Spanish)
20 January 2022
0 references
Projekti summa on 104 920,41 eurot, mis vastab 2018. aastal palkadele, sotsiaalkindlustusele, üürile, veetarbimisele, elektrile ja raamatupidamisele tehtud kulutustele. (Estonian)
29 July 2022
0 references
Projekto suma – 104 920,41 EUR, atitinkanti 2018 m. pateiktas išlaidas darbo užmokesčiui, socialinei apsaugai, nuomai, vandens suvartojimui, elektros energijai ir apskaitai. (Lithuanian)
29 July 2022
0 references
Iznos projekta iznosi 104 920,41 EUR, što odgovara troškovima prikazanima u 2018. za rashode za plaće, socijalno osiguranje, najamnine, potrošnju vode, električnu energiju i računovodstvo. (Croatian)
29 July 2022
0 references
Το ποσό του έργου ανέρχεται σε 104 920,41 EUR που αντιστοιχεί στις δαπάνες που παρουσιάστηκαν το 2018 για δαπάνες για μισθούς, κοινωνική ασφάλιση, ενοίκια, κατανάλωση νερού, ηλεκτρική ενέργεια και λογιστική. (Greek)
29 July 2022
0 references
Výška projektu je 1 049 120,41 EUR, čo zodpovedá výdavkom uvedeným v roku 2018 na výdavky na mzdy, sociálne zabezpečenie, nájomné, spotrebu vody, elektrickú energiu a účtovníctvo. (Slovak)
29 July 2022
0 references
Hankkeen määrä on 104 920,41 euroa, joka vastaa vuonna 2018 esitettyjä palkkoihin, sosiaaliturvaan, vuokriin, vedenkulutukseen, sähköön ja kirjanpitoon liittyviä menoja. (Finnish)
29 July 2022
0 references
Kwota projektu wynosi 104 920,41 EUR, co odpowiada wydatkom przedstawionym w 2018 r. na wydatki na wynagrodzenia, ubezpieczenie społeczne, czynsze, zużycie wody, energię elektryczną i księgowość. (Polish)
29 July 2022
0 references
A projekt összege 104 920,41 EUR, amely a 2018-ban a bérekre, a társadalombiztosításra, a bérleti díjakra, a vízfogyasztásra, a villamos energiára és a könyvelésre fordított kiadásoknak felel meg. (Hungarian)
29 July 2022
0 references
Částka projektu činí 104 922,41 EUR, což odpovídá výdajům uvedeným v roce 2018 na výdaje na mzdy, sociální zabezpečení, nájemné, spotřebu vody, elektřinu a účetnictví. (Czech)
29 July 2022
0 references
Projekta summa ir EUR 104 920,41, kas atbilst 2018. gadā uzrādītajiem izdevumiem par algām, sociālo nodrošinājumu, īri, ūdens patēriņu, elektrību un grāmatvedību. (Latvian)
29 July 2022
0 references
Is ionann méid an tionscadail agus EUR 104,920.41 a chomhfhreagraíonn do na costais a tíolacadh in 2018 le haghaidh caiteachas ar phá, slándáil shóisialta, cíosanna, ídiú uisce, leictreachas agus cuntasaíocht. (Irish)
29 July 2022
0 references
Znesek projekta znaša 104 920,41 EUR, kar ustreza stroškom, predstavljenim leta 2018 za izdatke za plače, socialno varnost, najemnine, porabo vode, električno energijo in računovodstvo. (Slovenian)
29 July 2022
0 references
Сумата по проекта е 104 920,41 EUR, съответстващи на разходите, представени през 2018 г. за разходи за заплати, социално осигуряване, наеми, потребление на вода, електричество и счетоводство. (Bulgarian)
29 July 2022
0 references
L-ammont tal-proġett huwa ta’ EUR 104 920.41 li jikkorrispondi għall-ispejjeż ippreżentati fl-2018 għall-infiq fuq il-pagi, is-sigurtà soċjali, il-kirjiet, il-konsum tal-ilma, l-elettriku u l-kontabbiltà. (Maltese)
29 July 2022
0 references
Projektet beløber sig til 104 920,41 EUR svarende til de udgifter, der blev fremlagt i 2018 til udgifter til lønninger, social sikring, husleje, vandforbrug, elektricitet og regnskabsføring. (Danish)
29 July 2022
0 references
Valoarea proiectului este de 104 920,41 EUR, corespunzând cheltuielilor prezentate în 2018 pentru cheltuielile cu salariile, asigurările sociale, chiriile, consumul de apă, electricitatea și contabilitatea. (Romanian)
29 July 2022
0 references
Projektbeloppet uppgår till 104 920,41 EUR, vilket motsvarar de utgifter som redovisades 2018 för utgifter för löner, socialförsäkring, hyror, vattenförbrukning, el och redovisning. (Swedish)
29 July 2022
0 references
23 May 2023
0 references
Santa Cruz
0 references
Identifiers
M1420-11-6076-FEDER-004055
0 references