Improving energy efficiency and air quality control in the city of Szczuczyn, through the replacement of luminaires and the construction of pollution measurement systems (Q117085): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2509823 / rank
 
Normal rank

Revision as of 18:52, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving energy efficiency and air quality control in the city of Szczuczyn, through the replacement of luminaires and the construction of pollution measurement systems
Project in Poland financed by DG Regio

    Statements

    0 references
    711,710.95 zloty
    0 references
    170,810.628 Euro
    13 January 2020
    0 references
    938,425.1 zloty
    0 references
    225,222.02399999998 Euro
    13 January 2020
    0 references
    78.0 percent
    0 references
    8 June 2018
    0 references
    29 April 2019
    0 references
    GMINA SZCZUCZYN
    0 references
    0 references

    53°33'46.8"N, 22°17'7.8"E
    0 references
    Gmina Szczuczyn zamierza zrealizować przedsięwzięcie polegające na modernizacji systemu oświetlenia ulicznego (463 punktów świetlnych) w części miejskiej oraz budowie stacji pomiaru zanieczyszczeń (mierzącej poziom pyłu PM10), wraz z systemem informowania o ich stężeniu mieszkańców. Konkurs w którym aplikuje Wnioskodawca dotyczy projektów Strategii niskoemisyjnych z wyłączeniem BOF, Typ 3: 3. Montaż/instalacja efektywnego energetycznie oświetlenia w gminach lub obiektach użyteczności publicznej oraz systemy sterowania oświetleniem (ulicznym) oraz Typ 5- 5. Systemy pomiaru zanieczyszczeń w miastach (takich, jak pył PM10 i benzo(a)piren) oraz systemy informowania mieszkańców o poziomach zanieczyszczeń. Celem głównym projektu jest poprawa stanu środowiska, w tym przede wszystkim poprawa stanu jakości powietrza w skali lokalnej, poprzez modernizację oświetlenia oraz budowę systemu pomiaru zanieczyszczeń w mieście Szczuczyn w okresie II kwartał 2018 -II kwartał 2019 r. Projekt będzie realizowany w okresie II kwartał 2018 -II kwartał 2019 r. Wartość kwalifikowalna projektu to niecały 1 mln zł, z czego 78 % stanowi dotacja. Przedsięwzięcie pozytywnie wpłynie na ochronę środowiska i zdrowia ludzi wywołując efekt ekologiczny w postaci redukcji CO2 (o 77,62 %). Planuje się iż, w wyniku realizacji projektu moc pracy systemu oświetlenia po modernizacji wynosić będzie 11,29 kW, a całkowita oszczędność energii pierwotnej wyniesie 473 882 kWh. Poprawa jakości powietrza uzyskana będzie dzięki unikniętej emisji zanieczyszczeń do atmosfery w wyniku zamiany nieefektywnych energetycznie opraw sodowych wraz z osprzętem, na energooszczędne oprawy LED. (Polish)
    0 references
    The municipality of Szczuczyn intends to carry out a project to modernise the street lighting system (463 points) in the urban part and to construct a station for the measurement of pollutants (PM10 level), together with a system of information on the concentration of the inhabitants. The competition in which the applicant is applying concerns a low carbon strategy with the exception of the BOF, Type 3: 3. Installation/installation of energy-efficient lighting in municipalities or public utility facilities and lighting control systems (street) and Type 5-5. Urban pollution measurement systems (such as PM10 and benzo (a) pyrene) and information systems for residents on pollution levels. The main objective of the project is to improve the state of the environment, including in particular the improvement of local air quality through the modernisation of lighting and the construction of a pollution measurement system in the city of Szczuczyn in the period of the second quarter of 2018 to II/quarter 2019. the project will be implemented in the second quarter of 2018 to II/quarter 2019. the project’s eligible costs amount to PLN 1 million, 78 % of which is a subsidy. The project will have a positive impact on the protection of the environment and human health by creating green effects in the form of CO2 reductions (by 77.62 %). As a result of the project, the illumination of the lighting system will be 11.29 kW as a result of the project, with a total primary energy saving of 473 882 kWh. Improvements in air quality will be achieved through avoided atmospheric emissions from the conversion of energy inefficient luminaires together with their fittings into the atmosphere. (English)
    0 references

    Identifiers

    RPPD.05.04.01-20-0006/17
    0 references