Improvement of the energy efficiency of the building of the Primary School and of a municipal residential building in Srebrna (Q117049): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Szumowo / rank
 
Normal rank

Revision as of 18:42, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of the energy efficiency of the building of the Primary School and of a municipal residential building in Srebrna
Project in Poland financed by DG Regio

    Statements

    0 references
    787,702.67 zloty
    0 references
    189,048.6408 Euro
    13 January 2020
    0 references
    926,709.05 zloty
    0 references
    222,410.172 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 December 2018
    0 references
    5 October 2020
    0 references
    GMINA SZUMOWO
    0 references
    0 references

    52°55'5.2"N, 22°5'1.0"E
    0 references
    Przedmiotem projektu jest głęboka modernizacja energetyczna dwóch budynków gminnych: budynku Szkoły Podstawowej oraz komunalnego budynku mieszkalnego w Srebrnej. W budynku szkoły przewidziano: - ocieplenie ścian zewnętrznych do fundamentów i wewnętrznych, stropodachów, części dachu (poddasze), stropu nad biblioteką, stropodachu nad wejściem, stropu nad ostatnią kondygnacją, - wymianę drzwi drewnianych, - wymianę starych okien, - regulację hydrauliczną instalacji c.o. - wymianę oświetlenia na energooszczędne - założenie instalacji fotowoltaicznej o mocy 6,1kWp W budynku mieszkalnym przewidziano: - ocieplenie stropu pod nieogrzewanym poddaszem, - ocieplenie ścian zewnętrznych do fundamentów, - wymianę drzwi i okien, - modernizację c.w.u, - nową kotłownię z powietrzną pompą ciepła zasilaną instalacją fotowoltaiczną i kotłem olejowym wraz z modernizacją instalacji c.o. Wskaźniki produktu 1. Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CI 32) - 240628,08 kWh/rok 2. Szacowany roczny spadek emisji gazów cieplarnianych (CI 34) tony równoważnika CO2 - 66,78 MgCO2 3. Liczba zmodernizowanych energetycznie budynków - 2 szt. 4. Powierzchnia użytkowa budynków poddanych termomodernizacji - 975,21 m2 5. Liczba zmodernizowanych źródeł ciepła -1 szt. Wskaźniki rezultatu 1. Ilość zaoszczędzonej energii elektrycznej - 9,84 MWh/rok 2. Ilość zaoszczędzonej energii cieplnej - 666,00 GJ/rok Cel ogólny projektu Poprawa efektywności energetycznej budynku Szkoły Podstawowej i komunalnego budynku mieszkalnego w Srebrnej oraz zmniejszenie emisji gazów cieplarnianych do atmosfery. Cele szczegółowe - zmniejszenie zapotrzebowania budynków gminnych na energię niezbędną do ich ogrzewania, - zmniejszenie zapotrzebowania na energię elektryczną do oświetlenia w budynku szkoły. - wykorzystanie odnawialnych źródeł energii w budynkach, - realizacja funkcji pełnienia przez samorządy wzorcowej roli w zakresie zarządzania energią. (Polish)
    0 references
    The subject of the project is the deep energy renovation of the two municipal buildings: a building in the Primary School and a municipal residential building in Srebrna. The following are foreseen in the school building: — the insulation of external walls to the foundations and interior sides, the tightening of the roof, the parts of the roof, the costlier over the library, the steep addition of the entrance to the floor, the replacement of wood doors, the replacement of the old windows, the hydraulic adjustment of the heating system. — replacement of lighting with energy-efficient lighting — the installation of a 6,1kWp photovoltaic PV installation is foreseen in: — the insulation of the ceiling below the heating system, the insulation of the outer walls into the foundations, — the replacement of doors and windows, — modernisation of water service water, a new boiler with a heat pump powered by a photovoltaic and oil boiler, together with the modernisation of the heating system. output indicators 1. Reduction of annual primary energy consumption in public buildings (CI 32) — 240 628.08 kWh/year 2. Estimated annual decrease in greenhouse gas emissions (CI 34) in tonnes of CO2-eq. — 66,78 MgCO2 3. Number of buildings with improved energy efficiency: 2 4. Usable surface area of buildings undergoing thermal modernisation — 975.21 m² 5. Number of upgraded heat sources — 1 Result indicators 1. Amount of electricity saved: 9.84 MWh/year 2. Amount of thermal energy saved — 666,00 GJ/year Objective objective — Improvement of the energy efficiency of a building building at a primary and municipal residential building in Srebrna and reducing greenhouse gas emissions into the atmosphere. Specific objectives — reducing the demand for energy for heating in municipal buildings — reducing the demand for electricity to light in the school building. — the use of renewable energy in buildings — the performance of local government functions in terms of energy management. (English)
    0 references

    Identifiers

    RPPD.05.03.01-20-0196/18
    0 references