Regeneration of the monument to 28 in Olsztyn (Q132728): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Q2536802 / rank | |||
Normal rank |
Revision as of 22:41, 10 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Regeneration of the monument to 28 in Olsztyn |
Project in Poland financed by DG Regio |
Statements
354,791.56 zloty
0 references
463,829.81 zloty
0 references
76.5 percent
0 references
15 April 2016
0 references
31 October 2019
0 references
WSPÓLNOTA MIESZKANIOWA WYZWOLENIA 28 10-106 OLSZTYN
0 references
Zakres projektu obejmuje 1 budynek wielorodz. położ. w Olsztynie przy ul. Wyzwolenia 28 – budynek podpiwn., liczba kondyg.: 3, ilość lokali ogółem: 5, w tym mieszk. - 4 i użytkowych - 1 o łącznej pow. użyt. 389,72 m2. Budynek położ. jest w strefie ochr. konserw. i jest wpisany do rej. zabytków pod nr: A-2329). W wybranym do realiz. wariancie stan. przedmiot niniejszego projektu nowa jakość budynku oraz przestrzeni zostanie uzysk. poprzez następ. usprawn.: a) Prace konserw. elewacji budynku b) Prace konserw. na klatce schod. budynku. W zakres wchodziły takze: oprac. dok. tech. progr. pr. kons., proj. bud. stol. okienn., studium wyk. oraz promocja. Więcej w rozdz. 1.1 sw; Interesariuszami przedm. projektu są mieszkańcy kamienicy, a tym samym obszaru rewitalizacji, turyści, służby konserw., GminaOlsztyn. Szczeg. inform. na temat zakresu rzecz. i przyjętych rozw. znajduje się w rozdz. 2.2 studium wykonaln. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inwestycji wdrażany będzie przez benef., tj. Wsp. Mieszk. Wyzwolenia 28 10-106 Olsztyn, która wraz z partn. zapewni zespół osób odpowiedz. za wdroż. projektu, którzy posiadają kwalif. i dośw. w realiz. projektów wdroż. w latach 2007-2013, co potwierdza rozdział 2.4 studium. Projekt po jego zakończ. jednozn. rozwiąże jeden z istot. problemów dotycz. najbardziej zniszcz. i zaniedb. infrastr. techn. przy ul. Wyzwolenia 28 w Olsztynie oraz będzie przeciwdziałał margin. znacznych grup mieszk. zdegrad. społ. i ekon., charakteryz. się zabytkową zabud. otoczenia. W istotny sposób przyczyni się także do społ. aktyw. mieszkańców i wpłynie na obniż. poziomu występ. zjawisk patologii społecz. na danym terenie. Proj. wpis. się w założ. SZOOP RPO WiM 2014-2020, Oś 8 Obszary wymag. rewit., Cel tem. 9 Promow. Włącz. Społ., walka z ubóstw. i wsz. dysk rym., Prior. Inwest. 9 b – Wsp. rewit fizycz., gosp. i społ. ubogich społ.na obszarach miejs. i wiejsk., Cel szcz.: Lepsza jak życia społ. zam. obsz. probl. (Polish)
0 references
The scope of the project consists of 1 multi-family building, Olsztyn, ul. 28 — ext building, number of floors: 3, total number of premises: 5, including the bellows. — 4 and of utility — 1, with a combined use. 389.72 m². The building as a midwife is preserved in the protection zone and is registered as a monument under No: A-2329). The new quality of the building, as well as the space, will be obtained through the following improvements: (a) Works of the façade of the building (b) The works of the building in the staircase. The scope was as follows: technical inspection and promotion procedures. Read more 1.1 sw; The project’s forerunners are the inhabitants of the stony and thus the regeneration area, tourists, the canner, and GminaOlsztyn. The detailed information on the material scope and scope of the proceedings is set out in the chapter. 2.2 of the feasibility study, as well as in the appendix to the proposal. The entire range of investments will be implemented by the beneficiary. WSP. Bellows. The 28 10-106 Olsztyn Liberation process, which, together with the partners, will ensure the answer of the panel for the implementation of the project, which will be implemented and implemented in 2007-2013, as confirmed by chapter 2.4 of the study. On the one hand, the project will solve one of the major problems that arise from the point of view of the most serious problems. The Liberation of 28 in Olsztyn, and will act against the margins of significant groups of residential living, characterised by a historic environment. It will also make an important contribution to the active population and will reduce the level of performance. Take the form. SZOOP ROP WM 2014-2020, Axle 8 Areas required for renewal. 9 Promotion. Enable. The fight against poverty and racism, Prior. Inwest. 9 b — physical and social reviser in the area of the city and the tower areas. A better way of living to the social circle of the Castle. (English)
0 references
Identifiers
RPWM.08.01.00-28-0008/16
0 references