Creation of the Centre for Family Support in a rebuilt and upgraded Urban Culture Centre building (Q132709): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Pasym / rank
 
Normal rank

Revision as of 22:40, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Creation of the Centre for Family Support in a rebuilt and upgraded Urban Culture Centre building
Project in Poland financed by DG Regio

    Statements

    0 references
    1,382,204.3 zloty
    0 references
    331,729.032 Euro
    13 January 2020
    0 references
    2,125,755.35 zloty
    0 references
    510,181.284 Euro
    13 January 2020
    0 references
    72.11 percent
    0 references
    28 February 2017
    0 references
    31 March 2019
    0 references
    GMINA PASYM
    0 references
    0 references

    53°39'7.9"N, 20°47'30.1"E
    0 references
    Przedmiotem projektu jest modernizacja i przebudowa budynku Miejskiego Ośrodka Kultury na potrzeby działalności Centrum Wspierania Rodziny. Lokalizacja projektu: Miasto Pasym (ul. Rynek 10A) na dz. nr 106, 107, 108 i 111 obr.4, Pasym. Zakres projektu: prace rozbiórkowe, prace budowlane, wyposażenie. Szczeg. informacje na temat zakresu rzecz. i przyjętych rozwiązań znajduje się w rozdz. 2.2 studium wyk. oraz w wyciągu dokum. techn. będącej załączn. do wniosku. Projekt wpisuje się w założenia SZOOP RPOWiM 2014-2020, Oś priorytetowa 8 Obszary wymagające rewitalizacji, Cel tematyczny 9 Promowanie włączenia społecznego, walka z ubóstwem i wszelka dyskryminacją, Priorytet inwestycyjny 9 b – wspieranie rewitalizacji fizycznej, gospodarczej i społecznej ubogich społeczności na obszarach miejskich i wiejskich,Cel szczegółowy: Lepsza jakość życia społeczności zamieszkujących obszary problemowe. Projekt wynika z LPR Pasymia, przyczynia się do integracji mieszkańców i do wyprowadzenia ze stanu kryzysowego zdegradowanego obszaru, jego kompleksowej rewitalizacji fizycznej, gospodarczej i przestrzennej. Projekt promuje włączenie społeczne, walkę z ubóstwem i wszelką dyskryminacją. Zrewitalizowany obszar pozwoli na aktywizację lokalnej społeczności zamieszkującej zdegradowane obszary, w tym osoby niepełnosprawne, przez co jakość życia (zdrowotnego, społecznego) zostanie podniesiona. Wśród etapów realizacji przeds. wymienia się: oprac. dokumentacji techn., studium wyk., roboty budowlane, nadzór inwestorski, promocja projektu. Cały zakres inw. wdrażany będzie przez beneficjenta, tj. Gminę Pasym, która wyodrębniła ze swej struktury zespół pracowników odpowiedz. za wdrożenie projektu, którzy posiadają wysokie kwalifikacje i doświad. w realizacji projektów wdrożonych w latach 2007-2013, co potwierdza rozdział 2.4 studium. (Polish)
    0 references
    The aim of the project is to modernise and upgrade the building of the Municipal Culture Centre for the activities of the Centre for Family Support. Location of the project: Town of Pasym (ul. Market 10A) on 106, 107, 108 and 111 to.4, Pasym. Scope of the project: demolition works, construction works, equipment. Specific information on the scope of the matter and the solutions adopted are to be found in the chapter. 2.2 study note and annex to the application. The project is in line with the assumptions of SZOOP RPOWiM 2014-2020, Priority 8 Areas for Regeneration, Thematic Objective 9 Promoting social inclusion, combating poverty and any discrimination, Investment Priority 9 b — supporting physical, economic and social regeneration of deprived communities in urban and rural areas, Specific objective: Improved quality of life for communities living in problem areas. The project stems from the LPR Paasimia, contributes to the integration of the inhabitants and leads to the crisis situation of a degraded area, its comprehensive physical, economic and spatial regeneration. The project promotes social inclusion, the fight against poverty and any discrimination. The revamped area will allow the animation of the local community living in degraded areas, including people with disabilities, thus raising the quality of life (health, social). The following points are included in the stages of the morning’s implementation: technical documentation, technical documentation, output, construction work, investor supervision, project promotion. The entire scope will be implemented by the beneficiary, i.e. The municipality of Pasym has separated from its structure a team of staff for the implementation of the project, who are highly qualified and experienced in the implementation of the projects implemented in 2007-2013, as confirmed by chapter 2.4 of the study. (English)
    0 references

    Identifiers

    RPWM.08.01.00-28-0002/17
    0 references