INSTALLATION OF PHOTOVOLTAIC SYSTEM FOR THE PRODUCTION OF ELECTRICITY OF 150,0 KWP, UNDER EXCHANGE ON SITE, PLACED ON THE ROOF OF THE BUILDING; REPLACEMENT OF ORDINARY LIGHTING WITH LED LAMPS FOR A TOTAL OF 1.740,000 LUMENS (Q4279790): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(BatchIngestion) |
||
Property / contained in Local Administrative Unit | |||
Property / contained in Local Administrative Unit: Spoleto / rank | |||
Normal rank |
Revision as of 03:09, 10 June 2023
Project Q4279790 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | INSTALLATION OF PHOTOVOLTAIC SYSTEM FOR THE PRODUCTION OF ELECTRICITY OF 150,0 KWP, UNDER EXCHANGE ON SITE, PLACED ON THE ROOF OF THE BUILDING; REPLACEMENT OF ORDINARY LIGHTING WITH LED LAMPS FOR A TOTAL OF 1.740,000 LUMENS |
Project Q4279790 in Italy |
Statements
57,198.0 Euro
0 references
114,396.0 Euro
0 references
50.0 percent
0 references
1 March 2018
0 references
30 September 2019
0 references
TECNOKAR TRAILERS S.R.L.
0 references
I33D18000070007 (Italian)
0 references
SPOLETO
0 references
8 April 2023
0 references