Conversion and reconstruction of technology installations for water treatment, including the extension of the technological system to retention and equalisation reservoirs with the next to that of the existing SUW in Riga (Q132488): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Q2524569 / rank | |||
Normal rank |
Revision as of 22:47, 10 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Conversion and reconstruction of technology installations for water treatment, including the extension of the technological system to retention and equalisation reservoirs with the next to that of the existing SUW in Riga |
Project in Poland financed by DG Regio |
Statements
988,003.9 zloty
0 references
1,531,050.0 zloty
0 references
85.0 percent
0 references
28 February 2018
0 references
30 June 2020
0 references
GMINA RYBNO
0 references
Zostaną podjęte działania: wymiana urządzeń SUW w Rybnie na zapewniające właściwą jakość wody pitnej, usprawnienie systemu tłoczenia wody do sieci tak, aby zapewniał utrzymanie właściwego ciśn. przy jednoczesnej oszczędności energii. Zaplanowano wykonanie nast. prac: wymianę i przebud. inst. technolog. uzdatn. wody w oparciu o filtrację dwustopniową-odżelazianie i odmanganianie w filtrach ciśnieniowych oraz rozbudowę układu technologicznego o zbiorniki retencyjno-wyrówn. z układem pompowym II st. Zakres prac obejmuje: -Ujęcia wody:wymiana: pomp głębinowych wraz z głowicą i armaturą, w studniach 1,2,3; płyt nastudziennych na obudowach studni z włazami, kominkami wentyl. i drabinkami złazowymi;ukształtowanie terenu wokół obudów studni wraz z umocnieniem kostką betonową i obrzeżami. -Technologia SUW: wymiana: inst. technolog., zbiorników i orurowania wraz z osprzętem odżelaziaczy; złóż filtr. z rozbudową o II stopień uzdatniania wody; instalacji napowietrz., płukania, filtrów i chlorowania;demontaż zbiorników hydroforowych z armaturą;montaż: zestawu pomp II-go st.; zbiorników retencyjno-wyrówn.; jednostki osuszania powietrza w hali filtrów;naprawa daszków z mocowaniem oraz uzbrojenie istn. wywietrzaków w przepustnice. -Zasilanie energet. i sterowanie: wymiana inst. oświetlenia oraz gniazd;montaż zasilania urządzeń oraz ogrzewania elektr.;sterowanie automatyczne procesem technologii uzdatn. wody (pełne). -Roboty ogólnobudowlane. Produkt: przebudowana i rozbudowana SUW o Q śr. dob=287 m3/d. Interesariusze: 2 619 mieszkańców Rybna oraz podmioty gospodarcze (Zakład Przetwórstwa Mięsnego) będą korzystać z wody pitnej o wysokich parametrach jakośc., produkowanej w sposób energooszczędny. Projekt kwalifikuje się do dofinansow. zgodnie z założ. z SZOOP dla osi 5 jako typ projektu: budowa i modernizacja systemów zaopatrzenia w wodę (sieci wodociągowe, ujęcia i stacje uzdatniania wody), zamyka się w granicach aglomeracji Rybno(Uchw. Nr XX/475/16 Sejmiku Woj. Warm-Maz). (Polish)
0 references
Action will be taken: the replacement of SUW devices in Riga to ensure the proper quality of drinking water, improving the draining of water into the grid so as to ensure that the correct press is maintained while saving energy. It is planned to carry out the following work: water treatment and conversion. water treatment based on the filtration of two stages of water treatment and filtration in pressure filters and extension of the technology system for retention/equalisation tanks. — wody:wymiana: deep water pumps with head and fittings, 1,2,3; well shaped boards in enclosures of manhole wells, ventilation fireplaces and fracture ladders; the terrain around the well with the concrete enclosure and the perimeter of the wells. — SUM technology: exchange: (b) (b) (a) (a) (b) (a) (a) (b) (a) (b), (b) (a) (b), (b), (b), (b), (b), (b), and ( obtain filtration with II water treatment; installation of aeration, rinsing, filters and chlorination; dismantling of hydroform-tanks with fittings; assembly: a combination of pumps on the basis of the capital base; reservoirs and reservoirs; units of drying the air in the filter hall; repair of the dakate (s) and its attachment (s) in the pass. Energy supply and steering: replacement of lighting and sockets; installation of power supply and heating equipment; control of the automatic process of water treatment technology (full). — general works Product: rebuilt and enlarged SUW with Q mr. dob = 287 m³/d. 2 619 people and operators (Zakład Przetwórstwa Mięsnego) will use drinking water with a high quality of quality, manufactured in an energy-efficient way. The project is eligible for the project, as set out in the SZOOP for Axis 5 as the type of project: construction and modernisation of water supply systems (water supply, treatment and water treatment plants) is closed within the boundaries of the agglomeration of Rybno (Uchw. No XX/475/16 of the Seimas. Warm-Maz). (English)
0 references
Identifiers
RPWM.05.02.00-28-0010/18
0 references