Development and reconstruction of the sewage treatment plant in Sulęcina, at the same time as the modernisation of the sanitary and water sewerage system in the agglomeration of Sulęcin agglomeration (Q85428): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Gmina Sulęcin / rank
 
Normal rank

Revision as of 19:19, 9 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development and reconstruction of the sewage treatment plant in Sulęcina, at the same time as the modernisation of the sanitary and water sewerage system in the agglomeration of Sulęcin agglomeration
Project in Poland financed by DG Regio

    Statements

    0 references
    22,753,294.91 zloty
    0 references
    5,460,790.7784 Euro
    13 January 2020
    0 references
    43,900,474.89 zloty
    0 references
    10,536,113.9736 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 February 2015
    0 references
    31 December 2020
    0 references
    GMINA SULĘCIN
    0 references
    0 references

    52°26'29.0"N, 15°6'58.3"E
    0 references
    Projekt obejmuje rozbudowę i przebudowę oczyszczalni ścieków w Sulęcinie, modernizację systemu kanalizacji, w tym rozdział kanalizacji ogólnospławnej na kanalizację sanitarną i deszczową, przebudowę i remont sieci wodociągowej oraz rozbudowę SUW w Sulęcinie. Przepustowość oczyszczalni nie ulega zmianie i wynosić będzie nadal 14 234 RLM. Natomiast wdrażane będą rozwiązania, umożliwiające usuwanie azotu i fosforu do parametrów wymaganych prawem. Obecnie normy w tym zakresie są przekraczane. Ponadto nastąpi poprawa zagospodarowania osadów ściekowych w celu rolniczego wykorzystania. Na oczyszczalni wykonane zostaną m.in. obiekty: zlewnia ścieków dowożonych, pompownia ścieków surowych, stacja dmuchaw i mech. podczyszczania, stacja chemicznego strącania fosforu, 2 bloki biologiczne, budynek mech. odwodniania osadów, zbiornik wapna, magazyny osadu odwodnionego, zbiornik tlenowej stabilizacji, zagęszczacz mech. osadów. W związku z planowanym rozdziałem kanalizacji ogólnospławnej oczyszczalnia zostanie przebudowana pod kątem przyjęcia ścieków deszczowych. Modernizacja systemu kanalizacji obejmuje ponadto renowację odcinków w złym stanie techn. i wyłączenie z eksploatacji odcinków zużytych. W zakresie zaopatrzenia w wodę prace dotyczyć będą budowy nowych odcinków sieci, renowacji odcinków w złym stanie techn. i rozbudowy SUW (2 budynki techn. i 2 zbiorniki na wodę czystą). Realizowane będą wskaźniki produktu: Liczba przebudowanych oczyszczalni ścieków kom.– 1 szt.; Liczba oczyszczalni ścieków kom. wspartych w zakresie przeróbki / zagospodarowania osadów ściekowych – 1 szt.; Długość przebudowanej kanalizacji san.– 2,05 km; Długość wyremontowanej kanalizacji san.– 3,91 km; Długość wybudowanej sieci wodoc.– 4,20 km; Długość przebudowanej sieci wodoc.– 1,27 km; Długość wyremontowanej sieci wodoc.– 1,26 km; Liczba wspartych stacji uzdatniania wody – 1 szt.; Realizowane będą wskaźniki rezultatu: Liczba dodatk. osób korzystających z ulepszonego oczyszczania (Polish)
    0 references
    The project includes the extension and reconstruction of the sewage treatment plant in Sulęcina, modernisation of the sewerage system, including the separation of combined sewerage system into sanitary and rainwater drainage, reconstruction and renovation of the water supply network and the development of the SUW in Sulęcina.The capacity of the plant is not changed and will remain at 14 234 p.e.In contrast, solutions will be put in place to enable the removal of nitrogen and phosphorus to the parameters required by law.At present, standards are being exceeded.In addition, there will be an improvement in the management of sewage sludge for agricultural use.The plants will be constructed, inter alia, with the following:water catchment area of the feeder sewage, crude sewage pumping station, dmuchaw and mech. subwash station, phosphorus precipitation chemical station, 2 biological blocks, mech. sludge drainage, lime container, dehydrated sediment storage, aerobic stabilisation, thickener mech. sediments.In connection with the planned separation of the combined sewerage system, the plant will be rebuilt for the adoption of rainwater.The modernisation of the sewerage system also involves the renovation of sections in poor condition and the exclusion from the operation of waste sections.In the area of water supply, work will focus on the construction of new sections of the network, the renovation of sections in poor condition and the extension of the SUW (2 buildings of technology and 2 tanks for clean water).Product indicators will be implemented:Number of waste water treatment plants upgraded to 1;Number of waste water treatment plants supported in the preparation/management of sewage sludge — 1;The length of the reconstructed sewage system is 2.05 km;The length of the refurbished sewage system is 3.91 km;Length of the constructed mains network — 4.20 km;Length of reconstructed net, 1.27 km;The length of the renovated net, 1.26 km;Number of water purification plants supported — 1;Result indicators will be pursued:Number of persons benefiting from improved treatment (English)
    0 references

    Identifiers

    POIS.02.03.00-00-0183/16
    0 references