The key to your career (Q99690): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Brodnica County / rank | |||
Normal rank |
Revision as of 11:08, 10 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The key to your career |
Project in Poland financed by DG Regio |
Statements
484,821.93 zloty
0 references
570,378.75 zloty
0 references
85.0 percent
0 references
3 September 2018
0 references
28 June 2019
0 references
POWIAT BRODNICKI
0 references
Gł produkty i rezultaty P: • Liczba nauczycieli obj wsparciem: 9 os (5K,4M); • Liczba U objętych wsparciem w zakr rozwij komp kluczowych – 490 536 os (258 290 K, 232 246 M); • Liczba nauczycieli obj wsparciem w zakresie TIK w programie – 4 osób (2K,2M); • Liczba szkół i placówek systemu oświaty wyposaż w sprzęt TIK do prowadzenia zaj edukacyjnych – 3 szt. • Liczba szkół których pracownie przedmiotowe zostały doposażone w programie – 3 szt. • Liczba U, którzy nabyli kompetencje kluczowe po opuszczeniu programu – 490 536 os (258 290 K, 232 246 M). • Liczba nauczycieli, którzy nabyli kompetencje po opuszczeniu programu – 9 os. Gr docelową P stanowią U: I LO w B-cy- 280U (151 K,129 M),Technikum im. Zesłańców Sybiru (CKZiU)-150 200 U (81 111 K, 69 89 M) i LO w Jabłonowie Pomorskim-60U 56U (26 K,34 28 K,28 M) oraz 9 nauczycieli (5K, 4M) ze szkół prow kszt ogólne obj wsp w programie. Gł zad zaplanowane w P: realiz dod zaj dydaktyczno-wyrównawczych, (zaj TIK, z przedm matematyczno-przyrodniczych, j. obcych, przedsiębiorczości), doposaż pracowni przyrodniczych i matematycznych w pom dydaktyczne (m.in. do nauki metodą eksperymentu), szkolenia dla nauczycieli z zakresu TIK i nauczania metodą eksperymentu; realiz zaj z zakresu dor zawodowego oraz wsparcie psycholog-pedagog dla U zagrożonych przedwczesnym opuszczeniem systemu oświaty. Wszystkie zaj zaplanowane w P odbywać się będą w salach i pracowniach szkolnych. Wnioskodawca nie planuje zlecania zadań ani ich części podmiotom zewnętrznym. P nie generuje dochodów. Wnioskodawca zobowiązuję się do osiągnięcia przez szkoły objęte wsparciem w okresie do 6 m-y od daty zakończenia realiz P wszystkich funkcjonalności określonych w Regulaminie konkursu (str.15-16). P będzie realiz z uwzględnie przepisów dot bezpiecznych i higienicz warunków pracy, o których mowa w Rozporz Ministra Eduakcji Narodowej i Sportu z dnia 31 grudnia 2002 r. w sprawie bezpieczeństwa i higieny w publicznych i niepublicznych szkołach i placówkach. W (Polish)
0 references
Saw the products and deliverables of P: • Number of teachers support: 9 os (5K, 4M); • Number of U supported in the Key Division — 490 536 os (258 290 K, 232 246 M); • Number of teachers support ICT support in the programme — 4 persons (2K, 2M); • Number of schools and educational facilities equipped with ICT equipment to teach — 3. • Number of schools that are being retrofitted — 3 • Number of Us with key competences after leaving the programme — 490 536 os (258 290 K, 232 246 M). • Number of teachers who have acquired competence after leaving the programme — 9 people The target group P consists of U: And LO in B-cy-280U (151 K, 129 M), Technical College of Sybiru (CKZU) -150 200 U (81 111 K, 69 89 M), and LO in Jabłons Pomorwo-60U 56U (26 K, 34 28 K, 28 M) and 9 teachers (5K, 4M) from schools for general support in the programme. Have considered the planned activities in the P: use of teaching and compensation services, (j. ICT, MST, foreign, entrepreneurship), provide for the provision of scientific and mathematical workshops in teaching methods (including study methods), training for teachers in ICT and teaching methods; address professional careers and support psycho-social counselling to the U at risk of premature leaving the education system. All the will take place in the classroom and classrooms. The applicant does not plan to delegate tasks or parts of it to external entities. P does not generate revenue. The applicant shall undertake to achieve, by the schools covered by the support, up to 6 hours from the date on which all of the functionalities set out in the Rules of Procedure are completed (p. 15-16). The P will take into account the provisions on safe and hygienic conditions laid down in the Regulation of the Minister for National Education and Sport of 31 December 2002 on health and safety in public and non-public schools and establishments. IN THE (English)
0 references
Identifiers
RPKP.10.02.02-04-0019/17
0 references