Revitalisation of the spa area of the Mubus centre (Q114459): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Q2509307 / rank | |||
Normal rank |
Revision as of 17:31, 10 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Revitalisation of the spa area of the Mubus centre |
Project in Poland financed by DG Regio |
Statements
11,552,628.52 zloty
0 references
2,772,630.8447999996 Euro
0.24 Euro
13 January 2020
0 references
19,275,590.57 zloty
0 references
65.0 percent
0 references
16 November 2015
0 references
31 December 2020
0 references
MIASTO I GMINA UZDROWISKOWA MUSZYNA
0 references
W projekcie realizowane będą: 1 opracowanie niezbędnej dokumentacji w tym Programu Rewitalizacji, dokumentacji technicznej m.in. projektu budowlanego i analizy finansowej i ekonomicznej, 2 przebudowę nawierzchni płyty rynku, odrestaurowanie piwnic wraz z wykonaniem obiektu o funkcji kulturowej Ratusz uwzględniającego m.in. zagospodarowanie pomieszczeń pełniących funkcje muzealne, punktu poboru wody mineralnej, stylizowaną sala ślubów, taneczna itd.. Parametry obiektu przedstawiają się następująco: wys.11,83m, dł.23,05m, szer.17,50 m, pow. użytk.984,59m2. Liczba kondygnacji: 2 nadziemne i 1 podziemna. Zaprojektowano budynek w miejscu istniejących reliktów archeologicznych. Budynek kształtem nawiązuje do stylistyki budynków publicznych z regionu Sądecczyzny, na planie złożonym z prostokątów wielkością i lokalizacją nawiązujący do istniejących ruin. Obiekt nakryty dachem o niewielkim spadku otoczonym attyką. Zaprojektowano układ konstrukcyjny budynku w konstrukcji szkieletu żelbetowego z żelbetowymi stropami i żelbetowym stropodachem, klatkami schodowymi. Ściany wewn. wykończone tynkiem i okładzinami ściennymi tapety, detale architektoniczne. Wykończenie zewn. tynk zewnętrzny.3 rewitalizację ulicy Kościelnej, poprzez modernizację nawierzchni jezdni, chodnika, oświetlenia i kanalizacji burzowej. W ramach prac zw. z rewitalizacją uli i nawierzchni płyty rynku objętych rewitalizacją będzie 1,61 ha pow. Prace w tym zakresie dot.będą gł. remontu dróg w tym zmianie nawierzchni, istniejących chodników, przebudowy oświetlenia drogowego, remont istniejących urządzeń infrastruktury techn. itd.4 prace inspektora nadzoru,5 działania zw.z promocją i zarządzaniem projektem. (Polish)
0 references
The project will be carried out in the following ways: 1 development of the necessary documentation, including the Rehabilitation Programme, technical documentation including construction and financial and economic analysis, 2 upgrading of the surface of the market plate, restoration of the basement with the installation of the cultural heritage object, including the development of museum premises, mineral water abstraction point, stylised room for weddings, dance etc. The parameters of the facility are as follows: Is.11.83 m, dd.23.05 m, D.17.50 m, and operating for 984.59 m². Number of floors: 2 above-ground and 1 underground. The building has been designed at the site of existing archaeological rellis. The shape of the building is the stylisation of the public buildings in the region of the country, on a plan made up of the rectangular scale and the reference to existing pipes. A covered roof covered by a slight decrease in atlances. The structural layout of the building has been designed in the frame of the gladbeam design with gully tops and steep ceilings, stairways. The walls of the wall and wall of the wall of the wallpaper, including its architectural features. Outer plaster, external, 3 revitalisation of the road street, by upgrading road pavement, pavement, lighting and storm water. In the context of the work connected with the revitalisation of the hives and the pavement of the market plate to be regenerated, it will be 1.61 ha. Work in this respect will be subsidised by the head of the road, including alterations to the pavement, the existing pavements, the conversion of road lighting, the renovation of the existing equipment of technical infrastructure, etc. 4, the work of the supervising supervisor, 5 activities with the promotion and management of the project. (English)
0 references
Identifiers
RPMP.11.02.00-12-0791/17
0 references