Development of an innovative system for the management of the infrastructure? a lighting system operated by PLK S.A. & core; (Q83916): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Railway Institute / rank
 
Normal rank

Revision as of 18:51, 9 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of an innovative system for the management of the infrastructure? a lighting system operated by PLK S.A. & core;
Project in Poland financed by DG Regio

    Statements

    0 references
    2,878,174.85 zloty
    0 references
    690,761.964 Euro
    13 January 2020
    0 references
    8,294,082.5 zloty
    0 references
    1,990,579.7999999998 Euro
    13 January 2020
    0 references
    34.7 percent
    0 references
    1 July 2018
    0 references
    31 March 2022
    0 references
    INSTYTUT KOLEJNICTWA
    0 references
    Celem projektu jest opracowanie systemu zarządzania, sterowania i monitorowania oświetlenia terenów kolejowych w skali obszaru działa Spółki PKP PLK S.A. Ideą projektu jest wykorzystanie nowoczesnych opraw LED wyposażonych w cyfrowe złącza sterowania. Opracowana zostanie metoda dynamicznego sterowania intensywnością świecenia opraw, uwzględniająca rzeczywisty ruch pociągów na stacji oraz obecność ludzi na peronach. Projekt zakłada zbudowanie systemu informatycznego, rozsyłającego do obiektów terenowych informacje o planie ściemniania oświetlenia na najbliższy okres (rzędu 1-2 godzin). Sterowniki oświetleniowe na obiektach użyją informacji do sterowania oprawami. Przy braku takiej informacji, sterowniki powinny załączać nominalną intensywność świecenia. Drugim czynnikiem włączającym pełne oświetlenie będą sygnały o obecności ludzi. Projekt zakłada osiągnięcie celu poprzez realizację zadań w następujących krokach: 1. Wykonanie inwentaryzacji, zakończonej audytem energetycznym dla 110 tys. opraw - instalacji nie objętych programami modernizacji 2. Opracowanie otwartych standardów budowy systemu sterowania oświetleniem. Standardy będą definiować elementy systemu i ich funkcjonalność, opisywać metody i protokoły wymiany informacji, złącza (interfejsy) urządzeń. Przewiduje się użycie zarówno komunikacji przez okablowanie jak i komunikacji bezprzewodowej, bezpośrednio do trudnodostępnych opraw. W systemie będą używane nowoczesne oprawy wielu producentów, wyposażone w odpowiednie interfejsy. 3. Na bazie standardów zostaną opracowane modele urządzeń - elementów docelowego systemu. Firmy AREX i SILED opracują reprezentatywny zestaw urządzeń, zgodnych ze standardami. 4. Opracowane zostaną projekty wdrożeniowe instalacji oświetleniowych z użyciem modelowych urządzeń, implemen (Polish)
    0 references
    The aim of the project is to develop a system for the management, control and monitoring of the lighting of the railway sites on the scale of the area operated by PKP PLK S.A. Idem. the project is the use of modern LED luminaires equipped with digital control interfaces.A dynamic control intensity control method will be developed, taking into account the actual train movement in the station and the presence of humans on platforms.The project is designed to build up an IT system, distributing information on the lighting plan for the next (1-2 hour period) to the field premises.The lighting controls on the sites will use information for controlling the control.In the absence of this information, the controls should be accompanied by a nominal illumination intensity.The second factor including full lighting will be the signals of human presence.The purpose of the project is to achieve the objective by carrying out its tasks in the following steps:1.Implementation of the inventory, completed with an energy audit for 110 luminaires, installations not under modernisation programmes 2.Development of open standards for the construction of lighting control system.The standards will define the components of the system and their functionality, describe the methods and protocols of the information exchange, the equipment (interfaces) of the equipment.It is envisaged to use both communication by the cabling and the wireless communication, directly to the hard to reach frameworks.The system will use modern binding bodies for many manufacturers, equipped with appropriate interfaces.3.Models of equipment — the components of the targeted system — will be developed on the basis of standards.AREX and SILED will develop a representative set of devices which are in conformity with the standards.4.Design projects for the implementation of lighting installations using model equipment, implementing equipment will be developed. (English)
    0 references

    Identifiers

    POIR.04.01.01-00-0020/17
    0 references