Development of new design for pressure from window and wall pressure screens with improved acoustics and anti-smog filter (Q81777): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Q2512396 / rank | |||
Normal rank |
Revision as of 18:13, 9 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of new design for pressure from window and wall pressure screens with improved acoustics and anti-smog filter |
Project in Poland financed by DG Regio |
Statements
385,983.0 zloty
0 references
867,125.4 zloty
0 references
54.75 percent
0 references
1 March 2019
0 references
29 February 2020
0 references
BROOKVENT POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
SA.42799(2015/X) Przedmiotem projektu jest przeprowadzenie profesjonalnego procesu projektowego (PPP), inwestycja początkowa oraz zakup usługi towarzyszącej wdrożeniu, których efektem będą nowe projekty wzornicze nawiewników ciśnieniowych okiennych i ściennych oraz filtra antysmogowego. Nawiewniki ciśnieniowe stosowane są w budownictwie i zapewniają dopływ świeżego powietrza do pomieszczeń regulując przepływ powietrza przez frez w ramie okiennej lub otwór w ścianie. Brookvent nie dysponuje w ramach swojej oferty tego typu produktami, które mogą być sterowane manualnie, a których chęć stosowania jest zgłaszana przez architektów/projektantów, inwestorów oraz użytkowników. Jednocześnie kolejnymi potrzebami wobec nawiewników jest poprawa parametrów akustycznych i ich designu, a także zmniejszenie przepuszczalności zanieczyszczeń poprzez zastosowanie odpowiednich filtrów o niskiej przepuszczalności, które mogą być wykorzystywane w obu rodzajach nawiewników, co zmniejszy materiałochłonność produkcji. Ww. trudności zostaną wyeliminowane w wyniku realizacji: 1. PPP, w ramach którego zrealizowane zostaną: 1.1. Przeprowadzenie wstępnej diagnozy - diagnoza wykonalności i zasadności realizacji projektu z perspektywy obecnej sytuacji Wnioskodawcy, jego zasobów ludzkich, infrastrukturalnych i finansowych. 1.2. Synteza i analiza - potwierdzenie założeń postawionych w diagnozie w zakresie kluczowych potrzeb, w tym synteza informacji zebranych od potencjalnych odbiorców rozwiązań oraz z zakresu koniecznych rozwiązań technologicznych, zakończona opracowaniem założeń do briefu projektowego. 1.3. Stworzenie prototypów i testowanie rozwiązań – przeprowadzenie procesu zaprojektowania i stworzenie prototypów dla nawiewników oraz filtra, wraz z ich designem oraz nastąpi ich test i weryfikacja poziomu osiągnięcia założonych parametrów technicznych. 2. Inwestycji początkowej obejmującej nakłady na ŚT i WNiP, niezbędne do wdrożenia nowych produktów. 3. Usług towarzyszących wdroże (Polish)
0 references
SA.42799 (2015/X) Project project is the performance of a professional project process (PPP), initial investment and the purchase of accompanying implementation services that will result in new design projects for the supply of window, wall pressure and anti-smog.Pressure taps shall be used in construction and shall provide the fresh air to the room adjusting the air flow through the window frame or the slot in the wall.The Broovent does not dispose, as part of its offer, of such products which may be manually operated and whose intended use is notified by architects/designers, investors and users.At the same time, steps are taken to improve the acoustic parameters and their design and to reduce the permeability of pollutants through the use of appropriate low permeability filters, which can be used in both types of supply, thus reducing the material input of the production.These difficulties will be eliminated as a result of the implementation of:1.A PPP under which the following will be carried out:1.1.Preliminary diagnosis — diagnosis of the feasibility and appropriateness of project implementation from the point of view of the current situation of the applicant, its human resources, its infrastructure and financial resources.1.2.Synthesis and analysis — confirmation of the assumptions made in the diagnosis of the key needs, including the synthesis of the information gathered from the potential recipients of the solutions and the scope of the necessary technological solutions, and the completion of the design for the project brief.1.3.Prototyping and testing of solutions — carrying out the process of designing and prototyping the services and the filter, together with their design and their design and verification of the level of performance of the technical parameters established.2.An initial investment involving investment in the processing of new products.3.Accompanying services (English)
0 references
Identifiers
POIR.02.03.05-02-0038/18
0 references