Renewable energy sources for inhabitants and public buildings in the municipality of iłów and Słubice. (Q108885): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / beneficiary | |||
Property / beneficiary: Gmina Iłów / rank | |||
Normal rank |
Revision as of 14:51, 10 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renewable energy sources for inhabitants and public buildings in the municipality of iłów and Słubice. |
Project in Poland financed by DG Regio |
Statements
5,374,168.47 zloty
0 references
1,289,800.4327999998 Euro
0.24 Euro
13 January 2020
0 references
8,044,123.47 zloty
0 references
1,930,589.6327999998 Euro
0.24 Euro
13 January 2020
0 references
80.0 percent
0 references
18 July 2016
0 references
31 May 2019
0 references
GMINA IŁÓW
0 references
Założenia: Zaprojektowanie i wybudowanie instalacji w zakresie OZE na terenie Gm.Iłów i Słubice.Wyposażenie 31 budynków użyteczności publ. i 101 indywidualnych gosp. domowych i rolnych w instalacje solarne, pompy ciepła i/lub ogniwa fotowoltaiczne. Min.u 20% użytkowników końcowych instalacja będzie składała się z co najmniej dwóch rodzajów OZE. Cele:zwiększenie udziału OZE w ogólnej produkcji en. elektr. i cieplnej na terenie Gm. Iłów i Słubice i ograniczenie emisji szkodliwych gazów do atmosfery. Budowa małych źródeł energii, zlokalizowanych w miejscu zamieszkania odbiorców, w celu zminimalizowania strat przemysłowych na etapie przesyłu, i w celu utrzymania korzystnego efektu ekologicznego, podniesienie świadomości ekologicznej.Zabezpieczenie mieszkańców Gmin przed występowaniem lokalnych niedoborów en. spowodowanych przerwami w dostawach en. elektr. i cieplnej z sieci gminnych. Zakres: budowa 21 instalacji solarnych w Gm.Iłów, 10 w Gm. Słubice, budowa 71 instalacji fotowoltaicznych w Gm. Iłów, 31 w Gm. Słubice, budowa 48 pomp ciepła w Gm. Iłów, 11 w Gm. Słubice. Podniesienie świadomości ekologicznej mieszkańców 101 gosp.domowych z gmin Iłów i Słubice w zakresie energii odnawialnej poprzez promocję projektu. Gr. docelowa: 71 gosp. domowe z terenu Gm. Iłów i 30 gosp. domowe z terenu Gm. Słubice. 21 budynków należących do Gm. Iłów i 10 do Gm.Słubice. Etapy: e. przygotowawczy-analiza ex ante posiadanej infrastruktury energetycznej i możliwości jej modernizacji, badanie popytu, audyt energetyczny, przygotowanie dok. przetargowej w trybie zaprojektuj i wybuduj, powołanie insp. nadzoru i kadry zarządzającej, promocja i informacja e.projektowania - uzyskanie pozwoleń, uzgodnienia z użytkownikami końcowymi i gestorami infrastruktury, zawarcie porozumienia z zakładami energetycznymi i ciepłowniami; nadzór e.wykonania-instalacja. dostawy, odtworzenia e.eksploatacji-usł.gwarancyjne i serwisowe, utrzymanie i konserwacja infrastruktury e.rozliczenia końcowego (Polish)
0 references
Assumptions: The design and construction of RES installations in the field of Gm.Iłów and Słubice..Equipment 31 of the utility for publ and 101 individual households and agricultural households in solar installations, heat pumps and/or solar cells. 20 % of the end users will consist of at least two types of RES. Objectives: increase the share of RES in the overall production of the electricity and heat in the Gm. iłów and Słubice area and reduce the emission of harmful gases into the atmosphere. Construction of small energy sources located at the customer’s place of residence in order to minimise industrial losses in the transmission phase and to maintain a beneficial ecological effect. Scope: construction of 21 solar installations in G.m.Iłów, 10 in Gm. Słubice, construction of 71 photovoltaic installations in Gm. I, 31 in Gm. Słubice, construction of 48 heat pumps in Gm. I., 11 in Gm. Słubice. To raise the awareness of the local inhabitants of 101 households in the municipalities of iłów and Słubice in the field of renewable energy through the promotion of the project. GR. target: 71 households from the Gm. I and 30 households from the Gm, Słubice area. 21 buildings owned by Gm. iłów and 10 to G.m.Slyembic. Steps: E. ex ante preparatory analysis of existing energy infrastructure and opportunities for modernisation, demand testing, energy audit, preparation of a tender document for design and demolition, appointment of supervisory and executive management, promotion and information e.design — obtaining of permits, arrangements with end users and infrastructure, the conclusion of an agreement with electricity and heating plants; supervision of the installation, supply, maintenance and servicing, maintenance and maintenance of the infrastructure and end-use services (English)
0 references
Identifiers
RPMA.04.01.00-14-6903/16
0 references