Control of the ivy gate (Q10621): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||||||||||||||
Property / EU contribution | |||||||||||||||
175,662.0 Czech koruna
| |||||||||||||||
Property / EU contribution: 175,662.0 Czech koruna / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
7,026.48 Euro
| |||||||||||||||
Property / EU contribution: 7,026.48 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 7,026.48 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.04 Euro
| |||||||||||||||
Property / EU contribution: 7,026.48 Euro / qualifier | |||||||||||||||
point in time: 10 January 2020
|
Revision as of 10:19, 19 June 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Control of the ivy gate |
Project in Czech Republic financed by DG Regio |
Statements
175,662.0 Czech koruna
0 references
234,216.0 Czech koruna
0 references
75 percent
0 references
1 April 2017
0 references
9 January 2018
0 references
9 January 2018
0 references
ATE, s. r. o.
0 references
35002
0 references
Předmětem projektu je vývoj elektronického zařízení pro kontrolu polohy břeven závor přejezdového zabezpečovacího zařízení v závislosti na čase (sklápění a zvedání) a kontrolu celistvosti břeven závor. a. (Czech)
0 references
The purpose of the project is the development of an electronic device for checking the position of the shore of the ivy gate, depending on the time (tilting and lifting) and checking the integrity of the bank in brackets. a. (English)
0 references
Identifiers
CZ.01.1.02/0.0/0.0/16_045/0008595
0 references