Installation of infrastructure to invest and carry out an economic activity in degraded and post-industrial areas in Piekary Śląskie (Q122885): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2531463 / rank
 
Normal rank

Revision as of 20:40, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of infrastructure to invest and carry out an economic activity in degraded and post-industrial areas in Piekary Śląskie
Project in Poland financed by DG Regio

    Statements

    0 references
    2,267,182.49 zloty
    0 references
    544,123.7976 Euro
    13 January 2020
    0 references
    3,291,197.42 zloty
    0 references
    789,887.3807999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 May 2017
    0 references
    30 May 2018
    0 references
    GMINA PIEKARY ŚLĄSKIE
    0 references
    0 references

    50°22'32.9"N, 18°56'16.4"E
    0 references
    Projekt polega na kompleksowym przygotowaniu terenów inwestycyjnych typu brownfield w rejonie ul. Podmiejskiej, DW 911 i ul. Pod Lipami w Piekarach Śląskich, w celu nadania im nowych funkcji gospodarczych wraz z możliwością ich promocji. Przedmiotem projektu jest odwodnienie poprzez budowę sieci kanalizacji deszczowej i budowa drogi, w efekcie czego uzbrojonych zostanie 13,38 ha terenów inwestycyjnych. Elementem projektu jest również promocja inwestycyjna uzbrojonego obszaru. Projekt realizowany będzie w okresie od dnia 25.05.2017 r. do dnia 30.05.2018 r. (Polish)
    0 references
    The project consists of a comprehensive preparation of the investment sites of the brownfield type in the area. Suburban, DW 911 and ul. Below the bars in Piekary Śląskie, in order to give them new economic functions, with the possibility of promoting them. The object of the project is dehydration by the construction of a storm-water sewerage network and the construction of a road, which means that 13,38 hectares of investment areas will be rigged. The project is also designed to promote the investment of an improved area. The project will run from 25.05.2017 to 30.05.2018. (English)
    0 references

    Identifiers

    RPSL.03.01.01-24-01F3/16
    0 references