Construction of a photovoltaic farm with an installed capacity of 0.99 MW, together with the necessary technical infrastructure and connection to the electricity grid in the town of Kraśnik Koszaliński (Q137714): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 13:22, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a photovoltaic farm with an installed capacity of 0.99 MW, together with the necessary technical infrastructure and connection to the electricity grid in the town of Kraśnik Koszaliński |
Project in Poland financed by DG Regio |
Statements
1,951,914.64 zloty
0 references
4,536,229.63 zloty
0 references
71.19 percent
0 references
28 February 2017
0 references
31 July 2018
0 references
ES JUTRZENKA 2 SP. Z O.O.
0 references
Przedmiotem projektu jest budowa farmy fotowoltaicznej o mocy 0,99 MW w miejscowości Kraśnik Koszaliński na działce ew. nr 153. Projekt ma charakter stacjonarny. W ramach realizacji projektu Wnioskodawca dokona zakupu instalacji fotowoltaicznej z niezbędnymi elementami oraz przeprowadzi prace w obrębie infrastruktury elektrycznej niezbędne z punktu widzenia uruchomienia farmy. Projekt będzie składał się z jednego etapu polegającego na budowie farmy fotowoltaicznej. W wyniku realizacji projektu Wnioskodawca rozpocznie produkcję energii elektrycznej ze słońca, dzięki czemu możliwe będzie osiągnięcie określonych w we wniosku wskaźników rezultatu. (Polish)
0 references
The object of the project is the construction of a 0.99 MW photovoltaic farm in the town of Krasnik Koszalin on plot (No 153). The project is stationary. As part of the project, the applicant will purchase the photovoltaic equipment with the necessary elements and will carry out the work within the electrical infrastructure necessary for the operation of the farm. The project will consist of a single phase consisting of the construction of a photovoltaic farm. As a result of the project, the applicant will start producing electricity from the sun, which will make it possible to achieve the result indicators set out in the proposal. (English)
0 references
Identifiers
RPZP.02.10.00-32-A109/16
0 references