INSTALLATION OF SOLAR COLLECTORS AND BIOMASS BOILERS WITHIN THE MUNICIPALITY OF DZWOLA (Q104640): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 12:42, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
INSTALLATION OF SOLAR COLLECTORS AND BIOMASS BOILERS WITHIN THE MUNICIPALITY OF DZWOLA
Project in Poland financed by DG Regio

    Statements

    0 references
    4,296,368.26 zloty
    0 references
    1,031,128.3823999999 Euro
    13 January 2020
    0 references
    5,367,606.85 zloty
    0 references
    1,288,225.6439999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 April 2016
    0 references
    30 November 2018
    0 references
    GMINA DZWOLA
    0 references
    Teren P. obejmuje 17 miejsc. w GDz. Zakres P. zakłada instalację 429 szt. zestaw. kol. słon.(258 szt. 2-panelowych i 171 3-panelowych) posadowionych wyłącznie na dachach lub elewacjach i 81 kotłów na bioma (10szt.-15 kW, 24szt.-20kW, 32szt.-25 kW 9szt.-30kW i 6szt.-35 kW) w obiekt. prywat. do podgrz. CWU o sum. mocy 3,22712MW (1,32MW kolektory i 1,91 MW piece). P. przewid. również zaprojekt. i wykon. portalu internet., kt będzie pełnił funkcje eduk., promoc. oraz oferował usługi on-line. Łączna l. mieszk. GDz korzyst. (GRUPA DOCELOWA) z efektów realiz. P. wyniesie ok. 2040 w 510 obiekt. Instalacje, będące przez cały okres trwałości (5lat) własn. GDz zost. usytuow. na budyn. stanow. własn. osób prywat., z kt GDz. podpisała um. użycz. GŁÓWNYM CELEM P. jest zwiększ. stosow. OZE na terenie GDz. Cele szczegół.: CEL 1: Upowszechn. techno. wytwarz. czystej energii wśród mieszk. poprzez powsz. montaż OZE na terenie gminy [3,22712MW w 2018r.].; CEL 2: Zmniejsz. obciążeń finans. społeczn. lokalnej wynikaj. z opłat za energ. dzięki utworz. Indy wid. Instal. wykorzysta. OZE [2129,54 Mwht/rok od 2019r.]; CEL 3: Reduk. zanieczyszcz. powietrza atmosf. poprzez zmniejsz. emisji związków szkodl. dzięki zwiększ. udziału energii ze źródeł odnawialnych [1234,22 t. ekwiwal. CO2 / rok od 2019r.]. P. przycz. się do realiz. zarówno celu prioryt. 4 (zakład. wsparcie wytwarz. i wykorz.. ener. pochodz. z OZE), jak i celu główn. RPO WL. P., obok korz. społ. i gosp. będzie wpływ. na skuteczniejsze przeciwdzi. zmianom klimatu. P. wpis. się w cele operac. (2.5- Wyposaż. Obsz. Wiej. w infrastr. transp., komun., energet.; 3.6 - Rozw. społ. informac. [uruch. serw. www] w stand. WCAG 2.0]; 4.5 - Racjonal. i efektyw. wykorzysta. zasob. przyr. dla potrzeb gosp. i rekreac., przy zachow. i ochron. walorów środ. przyrodn.) wskaz. w SRWL 2014-2020. GDz. Usytuow. jest w (OSI): Obsz. gospod. wykorzystania walorów przyrod. i kultur. P. w części realizow. będzie na obsz. Nat.2000. (Polish)
    0 references
    The area of P. comprises 17 sites in the MD. The scope of P. requires the installation of 429 units. 2-panel and 171 3-panel) posited only on rooftops or elevations and 81 boilers on a bit (10th.-15 kW, 24th.-20 kW, 32th.-25 kW 9th.-30 kW and 6-35 kW) for the obverse. CWU 3.22712 MW (1.32 MW collector and 1.91 MW furnaces). It will also be designed and implemented on the internet. Total. MD. use of the advantage. (DOCELOWA group) on the effects of implementation. Ms P. will be around 2040 in 510 site. Installations which have been owned for 5 years throughout their life (s). The GDZ was located on the building, which was privatised. The main objectives of the CEM are increased. RES in the area of the MD. Specific objectives: OBJECTIVE 1: The use of renewable energy technology in the municipality of [3.22712 MW in 2018]; OBJECTIVE 2: A minority of the burden of financing social networks, thanks to the work. IndY wid. Installation. RES [2129,54 MWHT/year since 2019]; OBJECTIVE 3: Reductions in air pollution by reducing the emissions of compounds by virtue of the increase in the share of energy from renewable sources [1 234.22 t. CO2/rok since 2019]. It is part of both the priorite objective. 4 (installation of energy from RES) as well as the head. THE ROP (ROP). P., together with the social and economic roots, will be influential in tackling climate change in a more effective way. They are part of the operational objectives. (2.5- equip. You cut. Consumer Infrastructure, Switch-over, Energy.; 3.6 — Communication of information to the public. [running the web] in stand. WCAG 2.0]; 4.5 — Racijon. and a resource efficient. for business and recreation, and with respect to conservation and security purposes, see SRWL 2014-2020. The GDZ. It is a location in (OSI): Use of natural and cultural assets. You will be part of the game. Nat.2000. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0013/16
    0 references