The regeneration of the old bath and the bulbars over the river Czarna Hańcz in Suwałki. (Q117460): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 11:49, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The regeneration of the old bath and the bulbars over the river Czarna Hańcz in Suwałki. |
Project in Poland financed by DG Regio |
Statements
5,445,398.88 zloty
0 references
13,252,217.97 zloty
0 references
70.0 percent
0 references
18 December 2017
0 references
17 December 2019
0 references
MIASTO SUWAŁKI
0 references
Projekt obejmuje 2 zadania tj. rewitalizację budynku byłej łaźni z przeznaczeniem budynku na cele publiczne (zadanie 1) oraz rewitalizację z zagospodarowaniem części terenów przyległych w celu utworzenia bulwarów nad rzeką Czarna Hańcza w Suwałkach (zadanie 2). Łączna powierzchnia zrewitalizowanych terenów wyniesie 5,33 ha. Oba zadania znajdują się w zdegradowanym obszarze miasta Suwałki i zaliczone zostały do podstawowych działań rewitalizacyjnych w ramach „Zintegrowanego Programu Rewitalizacyjnego Miasta Suwałki na lata 2017-2023”. Zadanie 1 obejmuje zaadaptowanie historycznego budynku łaźni na obiekt użyteczności publicznej z przestrzenią wystawienniczą przeznaczoną na galerię oraz na potrzeby usług kultury i sportu jako zaplecza bulwarów nad rzeką Czarna Hańcza w Suwałkach w celu prowadzenia licznych działań na rzecz rewitalizacji tego obszaru miasta. W obiekcie znajdzie się również punkt gastronomiczny i wypożyczalnią sprzętu sportowego. Ze względów funkcjonalnych projekt zakłada przebudowę, rozbudowę i nadbudowę, wraz ze zmianą sposobu użytkowania zdewastowanego budynku na budynek użyteczności publicznej pod nazwą „Stara Łaźnia”. Zadanie 2 przewiduje rewitalizację i zagospodarowanie terenów nadrzecznych i utworzenie bulwarów nad rzeką Czarna Hańcza położonych w bezpośrednim sąsiedztwie budynku starej łaźni. Prace obejmą m.in. wykonanie chodników, ścieżek rowerowych i ciągów pieszo-rowerowych, nasadzenia zieleni (trawniki i łąki kwiatowe) z elementami małej architektury, oświetlenie terenu z iluminacją oraz liniami zasilającymi. Prace obejmą też regulację brzegów rzeki z umocnieniem podstawy skarp (od mostu na ul. Mickiewicza do mostu na ul. Kościuszki), budową nabrzeża rekreacyjnego i slipu dla kajaków, przepławkę dla ryb z remontem jazu oraz kładkę dla pieszych i rowerzystów. Koszty ogółem: 13.252.217,97 zł Koszty kwalifikowalne: 7.779.141,34 zł Kwota dofinansowania: 6.223.313,00 zł (EFRR i budżet państwa) Okres realizacji: 18.12.2017-17.12.2019 r. (Polish)
0 references
The project consists of 2 tasks, i.e. the renovation of the building of the former piece of building for public purposes (task 1) and the revitalisation of the management of the adjacent part of the building in order to form the bulbars on the river Czarna Hańcz in Suwałki (Task 2). The total area of regenerated land will be 5.33 ha. Both tasks are located in the degraded area of Suwałki and are included among the main regeneration activities within the ‘Integrated Programme of the City of Suwałki City for 2017-2023’. Activity 1 consists of adapting the historical building of the bath to a public service site with an exhibition space for the galleries, and for the purposes of cultural and sports services, as the back office on the river Czarna Hańcz in Suwałki in order to carry out a number of activities for the revitalisation of this area of the city. The facility will also include a catering outlet and sports equipment; For functional reasons, the project involves reconstruction, extension and overbuilding, including a change in the use of the devastated building into a public building called ‘Starta Łąźnia’. Activity 2 provides for the revitalisation and development of riverside land and the establishment of a bullbar over the river Czarna Hańcz in the immediate vicinity of the old bath. Works will cover, inter alia, pavements, cycle paths and pedestrian/cycle paths, planting of green trees (lawn and flower meadows) with small architectural features, field lighting with iluminine and power lines. The works will also cover the regulation of the banks of the river with the fixing of the base of the turbot (from the bridge to the street). Mickiewicza bridge to ul. Kościuszki), the construction of a recreational berth and slipu for kayaks, the fish ladder from the renovation of the weir and the footbridge for pedestrians and cyclists. Total costs: PLN 13.252.217,97 Eligible costs: PLN 7.779.141,34 grant amount: PLN 6.223.313,00 (ERDF and national budget) 18.12.2017-17.12.2019 (English)
0 references
Identifiers
RPPD.08.05.00-20-0007/18
0 references