Construction of street lighting in Bukowcu (Q101988): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 11:36, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of street lighting in Bukowcu
Project in Poland financed by DG Regio

    Statements

    0 references
    408,900.45 zloty
    0 references
    98,136.108 Euro
    13 January 2020
    0 references
    658,876.56 zloty
    0 references
    158,130.3744 Euro
    13 January 2020
    0 references
    77.37 percent
    0 references
    1 October 2017
    0 references
    30 September 2018
    0 references
    GMINA BRÓJCE
    0 references

    51°39'59.0"N, 19°38'13.6"E
    0 references
    CELEM BEZPOŚREDNIM PROJEKTU JEST BUDOWA OŚWIETLENIA ULICZNEGO W BUKOWCU Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (LEDOWE OPRAWY ULICZNE). BUDOWA W/W INFRASTRUKTURY PRZYCZYNI SIĘ DO POPRAWY JAKOŚCI POWIETRZA NA TERENIE GMINY ORAZ CAŁEGO REGIONU ŁÓDZK., A TAKŻE PRZYCZYNI SIĘ DO ZMNIEJSZENIA ZAPOTRZEBOWANIA NA ENERGIĘ SEKTORA PUBLICZNEGO. CELAMI POŚREDNIMI (SZCZEGÓŁOWYMI) PROJEKTU BĘDĄ: • ZWIĘKSZENIE OBSZARU WOJEW. I KRAJU, NA KTÓRYM POPRAWIE ULEGNIE STAN POWIETRZA, • ZWIĘKSZENIE ŚWIADOMOŚCI SPOŁECZ. W ZAKRESIE OCHRONY ŚROD. W TYM W SZCZEGÓLNOŚCI POWIETRZA, • ZMNIEJSZENIE KOSZTÓW EKSPLOATACYJNYCH OŚWIETLENIA ULICZNEGO W PORÓWNANIU DO BUDOWY W SYSTEMIE TRADYCYJNYM, • ZMNIEJSZENIE ENERGOCHŁONNOŚCI SEKTORA PUBLI., • ZWIĘKSZENIE KOMFORTU ŻYCIA MIESZKAŃCÓW GMINY, • ZWIĘKSZENIE BEZPIECZEŃSTWA MIESZKAŃCÓW GMINY, • POPRAWA WYPOSAŻENIA W INFRASTRUKTURĘ UŻYTECZNOŚCI PUBLI. GMINY, • ZMNIEJSZENIE EMISJI ZANIECZYSZCZEŃ (W TYM CO2). CELEM ZAPEWNIENIA BEZKOLIZYJNEGO PROWADZENIA BUDOWY, KOLEJNOŚĆ WYKONYWANIA ROBÓT BĘDZIE NASTĘPUJĄCA: 1. ZŁĄCZA KABLOWE-KOSZTY KWALIF. GMINA WYKONUJE 8 ZŁĄCZY W SZAFKACH OŚWIETLENIA ULICZNEGO. W RAMACH ODRĘBNEGO OPRACOWANIA - KOSZT REALIZACJI PONOSI PGE DYSTRYBUCJA SA, POZA PROJEKTEM GMINY BUDOWANE SĄ I WYMIENIANE ZŁĄCZA W STACJACH TRANSFORMATOROWYCH. GMINA PONOSI JEDYNIE KOSZT MONTAŻU KABLA OD ZŁĄCZA PGE DO SZAFEK OŚWIETLENIA ULICZNEGO. TAKI ZABIEG JEST KONIECZNY ABY WPIĄĆ PROJEKTOWANE OŚWIETLENIE W ISTNIEJĄCE I ZAPEWNIĆ PRZEPŁYW ENERGII, 2. BUDOWA ROZDZIELNI OŚWIETLENIA ULIC, 3. BUDOWA LINII KABLOWEJ, 4. BUDOWA SŁUPÓW OŚWIETLENIA, 5. MONTAŻ OPRAW OŚWIETLENIA, 6. PODŁĄCZENIE PRZEWODÓW, 7. WYKONANIE POMIARÓW, 8. UPORZĄDKOWANIE TERENU. POTENCJALNYMI UŻYTKOWNIKAMI PROJEKTU BĘDĄ WSZYSCY MIESZKAŃCY GMINY BRÓJCE (W ROKU 2015 R. - ZAMIESZKIWAŁO 6 390 OS) ZE SZCZEGÓLNYM WSKAZANIEM MIESZKAŃCÓW MIEJSCOWOŚCI BUKOWIEC ORAZ POTENCJALNI NOWI MIESZKAŃCY GMINY. (Polish)
    0 references
    THE DIRECT OBJECTIVE OF THE PROJECT IS THE CONSTRUCTION OF STREET LIGHTING IN THE BUKOU, WITH THE USE OF ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY EQUIPMENT. THE CONSTRUCTION OF THE INFRASTRUCTURE WILL HELP TO IMPROVE AIR QUALITY IN THE TERRITORY OF THE MUNICIPALITY AND THE REGION AS A WHOLE, AND WILL HELP TO REDUCE THE DEMAND FOR PUBLIC SECTOR ENERGY. THE OBJECTIVES OF THE (SPECIFIC) PROJECT WILL BE TO: • THE INCREASE OF THE AREA OF THE PROVINCE. AND A COUNTRY WHERE AIR IS IMPROVED,• TO INCREASE PUBLIC AWARENESS. WITH REGARD TO THE PROTECTION OF THE LAND. INCLUDING IN PARTICULAR AIR,• REDUCING THE OPERATING COSTS OF STREET LIGHTING IN COMPARISON TO THE TRADITIONAL SYSTEM,• REDUCING THE ENERGY INTENSITY OF THE PUBLIC SECTOR,• IMPROVING THE QUALITY OF LIFE OF THE INHABITANTS OF THE MUNICIPALITY,• IMPROVING THE SAFETY OF THE INHABITANTS OF THE MUNICIPALITY,• THE IMPROVEMENT OF EQUIPMENT FOR PUBLIC UTILITIES INFRASTRUCTURE. MUNICIPALITIES,• REDUCTION OF POLLUTANT EMISSIONS (INCLUDING CO2). IN ORDER TO ENSURE THAT CONSTRUCTION IS FREE OF COURSE, THE ORDER OF EXECUTION OF THE WORKS WILL BE AS FOLLOWS: 1. KABLOWE-KOELY KABALIF CONNECTORS. THE MUNICIPALITY PERFORMS 8 CONNECTORS IN STREET LIGHTING CABINETS. AS PART OF THE SEPARATE STUDY, THE COST OF THE IMPLEMENTATION IS BORNE BY PGE DISTRIBUTION SA, IN ADDITION TO THE MUNICIPAL PROJECT BEING CONSTRUCTED AND THE CONNECTIONS EXCHANGED AT THE TRANSFORMER STATIONS. THE MUNICIPALITY ONLY BEARS THE COST OF INSTALLING THE CABLE FROM PGE TO THE STREET LIGHTING CABINET. THIS TREATMENT IS NECESSARY TO PUT AN END TO THE DESIGN OF LIGHTING IN EXISTING AND SECURE ENERGY FLOWS, 2. CONSTRUCTION OF STREET LIGHTING SUBSTATION, 3. CONSTRUCTION OF A CABLE LINE, 4. CONSTRUCTION OF LIGHTING POLES, 5. INSTALLATION OF LUMINAIRES, 6. WIRE CONNECTION, 7. MEASUREMENT, 8. CLEANING AND TIDYING THE SITE. THE POTENTIAL USERS OF THE PROJECT WILL BE ALL RESIDENTS OF THE MUNICIPALITY OF BÓJCE (2015) WITH 6 390 OS, WITH A SPECIAL INDICATION OF THE INHABITANTS OF THE MUNICIPALITY OF BUKOIEC AND THE POTENTIAL NEW INHABITANTS OF THE MUNICIPALITY. (English)
    0 references

    Identifiers

    RPLD.04.03.01-10-0002/17
    0 references