Installation of 5 PV power plants with a total power of 60.71 kW and installation of 9 heat pumps with a total power of 80.51 kW by the Cooperative Bank in Szczytno (Q131835): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 10:59, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of 5 PV power plants with a total power of 60.71 kW and installation of 9 heat pumps with a total power of 80.51 kW by the Cooperative Bank in Szczytno |
Project in Poland financed by DG Regio |
Statements
552,713.35 zloty
0 references
1,005,433.37 zloty
0 references
55.0 percent
0 references
4 November 2019
0 references
30 April 2020
0 references
BANK SPÓŁDZIELCZY W SZCZYTNIE
0 references
Inwestycja objęta niniejszym projektem polega na uruchomieniu elektrowni fotowoltaicznych o mocy łącznej 60,71 kW i Montażu 9 pomp ciepła o mocy łącznej 80,51 kW w Wielbarku, Pasymiu, Purdzie, Dźwierzutach, Szczytnie, i Jedwabnie. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP RPO WiM 2014-2020. Wnioskodawca posiada ważne dokumenty przyłączeniowe do sieci energetycznej. Przedmiotowy projekt nie wymaga zgłoszeń budowy. Niniejszy projekt zakłada dostawę i montaż instalacji fotowoltaicznych z wykorzystaniem technologii polikrystalicznej do produkcji energii elektrycznej. Inwestycja polega na montażu łącznie 199 szt. paneli fotowoltaicznych o mocy 60,71 kW. Panele fotowoltaiczne wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania słonecznego na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Projekt zakłada również montaż pomp ciepła o mocy grzewczej 80,51 kW. Pompa ciepła to urządzenie, które wykorzystuje podstawowe prawa fizyki - wymusza przepływ ciepła z obszaru o niższej temperaturze do miejsca gdzie ta temperatura jest wyższa. 1. Szczytno, ul. Łomżyńska 20 (działka 168/2, obręb 0005) - instalacja fotowoltaiczna o mocy 9,15 kW, 2 pompy powietrzne o mocy grzewczej 19,9kW 2. Dźwierzuty, ul. Kajki 1 (działka 592, obręb 0002)- instalacja fotowoltaiczna o mocy 19,52 kW, 2 pompy powietrzne o mocy grzewczej 19,9kW 3. Jedwabno, ul. Olsztyńska 2 (działka 256, obręb 0005) - instalacja fotowoltaiczna o mocy 6,41 kW, 1 pompa powietrzna o mocy grzewczej 7,8 kW 4. Pasym, ul. Krótka 1 (działka 145, obręb 0004)- instalacja fotowoltaiczna o mocy 13,42 kW, 2 pompy powietrzne o mocy grzewczej 19,9 kW 5. Wielbark, ul. Jagiełły 7 (działka 702, obręb 0020)- instalacja fotowoltaiczna o mocy 12.21 kW, powietrzna pompa o mocy grzewczej 7,8 kW 6. Purda 71B (działka 528/4, obręb 0023)powietrzna pompa ciepła o mocy grzewczej 5,21 kW (Polish)
0 references
The investment covered by this project consists of the commissioning of a PV power plant with a total capacity of 60.71 kW and a total of 9 kW heat pumps with a total power of 80.51 kW in Wielbarku, Pasimiu, Purda, Dźwizuty, Szczytno, and Jednog. The project fulfils all the conditions laid down in the SzocOP ROP WiM 2014-2020. The applicant shall have valid supporting documents for the energy network. The project does not require construction reports. This project involves the supply and installation of photovoltaic installations using polycrystalline technology for the production of electricity. The investment consists of the installation of a total of 199 solar panels having a power of 60.71 kW. Solar panels are using solar radiation to convert solar radiation into electricity. By cable, they transmit energy to inverters where there is a change in direct current into alternating current. The project also includes the installation of heat pumps with a heating capacity of 80.51 kW. A heat pump is a device which makes use of the basic physical rights, forces heat flows from an area with a lower temperature to the place where this temperature is higher. 1. Szczytczytno, ul. Łomżyńska 20 (parcel 168/2, area 0005) — photovoltaic installation with a power output of 9.15 kW, 2 air pumps with a heating output of 19.9 kW 2. Slide projections, ul. Kajki 1 (parcel 592, area 0002) — photovoltaic installation with a power output of 19.52 kW, 2 air pumps with a heating output of 19.9 kW 3. Jedwabno, ul. Olsztyńska 2 (parcel 256, rim 0005) — a photovoltaic installation of 6.41 kW, 1 air pump with a heating power of 7.8 kW 4. Pasym, ul. Short 1 (parcel 145, rim 0004) — photovoltaic installation with a power output of 13.42 kW, 2 air pumps with a heating output of 19.9 kW 5. Wielka Street, ul. Jagiełło 7 (parcel 702, area 0020) — photovoltaic installation with a power output of 12.21 kW, an air pump with a heating output of 7.8 kW 6. Purda 71B (parcel 528/4, perimeter 0023), air heat pump with a heating output of 5.21 kW (English)
0 references
Identifiers
RPWM.04.01.00-28-0216/17
0 references