Revision as of 02:19, 7 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of the building of the Health Centre in Passport and Pashice’s Office
Project in Poland financed by DG Regio

    Statements

    0 references
    702,656.32 zloty
    0 references
    168,637.51679999998 Euro
    13 January 2020
    0 references
    1,017,372.9 zloty
    0 references
    244,169.49599999998 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 June 2016
    0 references
    29 December 2017
    0 references
    GMINA PASZOWICE
    0 references
    Przedmiotem projektu jest termomodernizacja 2 budynków użyteczności publicznej – Urzędu Gminy w Paszowicach i Ośrodka Zdrowia w Paszowicach (województwo dolnośląskie, powiat jaworski, gmina Paszowice, miejscowość Paszowice, obszar wiejski. Projekt stanowi samodzielną jednostkę analizy i obejmuje wszystkie zadania inwestycyjne niezbędne do zapewnienia funkcjonalności i operacyjności infrastruktury zaraz po zakończeniu realizacji zakresu rzeczowego. Projekt obejmuje: Dokumentację (Zadanie nr 1); Roboty budowlane – budynek UG w Paszowicach (Zadanie nr 2), Roboty budowlane – budynek Ośrodka Zdrowia w Paszowicach (Zadanie nr 3), Nadzór inwestorski (Zadanie nr 4), Promocja projektu (Zadanie nr 5). Dotychczas zrealizowano prace przygotowawcze. Roboty budowlane nie zostały rozpoczęte. Pozyskano zezwolenia budowlane na cały zakres inwestycji: Zadanie nr 2: decyzja nr 357/2013 z dnia 10-10-2013, wydana przez Starostę Jaworskiego – obejmuje cały zakres przedsięwzięcia i jest prawomocna; Zadanie nr 3: decyzja nr 241/2013 z dnia 29.07.2013 oraz decyzja zmieniająca nr 118/2016 z dnia 18.05.2016 r. – wydana przez Starostę Jaworskiego – obejmuje cały zakres przedsięwzięcia i jest prawomocna. Zadanie nr 2 Roboty budowlane: budynek UG w Paszowicach: ocieplenie ścian zewnętrznych, stropu pod poddaszem nieogrzewanym, ocieplenie stropodachu, montaż nawiewników higroskopowych regulowanych automatycznie, wymiana drzwi zewnętrznych, budowa kotłowni gazowej z gazowym, kondensacyjnym kotłem c.o. Zadanie nr 3 Roboty budowlane: budynek Ośrodka Zdrowia w Paszowicach: modernizacja systemu grzewczego, w tym wymiana źródła ciepła na gruntową pompę ciepła oraz wymiana instalacji c.o.; wymiana drzwi zewnętrznych na nowe; ocieplenie stropodachu; wymiana okien; montaż nawiewników higroskopowych; ocieplenie stropu; modernizacja instalacji c.w.u.; ocieplenie ścian zewnętrznych. Komponent edukacyjny zaplanowano m.in. przeszkolenie osób stale przebywających w obiektach w zakresie oszczędnego gospodarowa (Polish)
    0 references
    The project is a thermo-modernisation of 2 public buildings — the local authority in the Passport and Health Centre (Dolnośląskie Province, Jaworski District, Passport town of Pashowice, Passport town, Passport area. The project shall be an independent unit of analysis and shall include all the investment tasks necessary to ensure the functionality and operability of the infrastructure as soon as the realisation of the physical scope of the infrastructure is completed. The project includes: Documentation (Task No 1); Construction work for the UG in Passport (Task No 2), Construction of a building for the Health Centre in Passport (Zadanie 3), Investor’s supervision (Task No 4), Project promoter (Task No 5). Preparatory work has been carried out so far. The works have not started. Building authorisations were obtained for the whole range of investments: Task No 2: decision No 357/2013 of 10-10-2013 by the Starowa Jaworski — covers the whole project and is final; Task No 3: decision No 241/2013 of 29.07.2013 and amending Decision No 118/2016 of 18.05.2016 — issued by the Starowa Jaworski — covers the whole of the project and is final. Task No 2 Construction works: UG in Passport: insulation of the outer walls, the ceiling under the non-heated screen, the insulation of the roof, the installation of a regulated hiropot of regulated hidromes, the replacement of external doors, the construction of a gas-fired boiler from gas condensing, condensing boiler heaters and No 3 Construction works: the building of the Health Centre in Passport: modernisation of the heating system, including replacement of the heat source on the ground heat pump and replacement of the heating system. replacement of external doors into new doors; steep warming; replacement of windows; hygrouting device; ceiling warming; modernisation of hot service water installations; insulation of external walls. An educational component is designed, inter alia, to train people on a permanent economic basis. (English)
    0 references

    Identifiers

    RPDS.03.03.01-02-0013/16