Energy efficiency improvement of the Institute of Energy — Research Institute in Warsaw (Q84581): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: Cohesion Fund / rank | |||
Normal rank |
Revision as of 10:23, 7 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy efficiency improvement of the Institute of Energy — Research Institute in Warsaw |
Project in Poland financed by DG Regio |
Statements
2,210,812.29 zloty
0 references
3,631,426.24 zloty
0 references
82.0 percent
0 references
21 December 2017
0 references
31 December 2020
0 references
INSTYTUT ENERGETYKI INSTYTUT BADAWCZY
0 references
Projekt będzie realizowany w województwie mazowieckim, w Warszawie,przy ulicy Augustówka 36 na nieruchomości, którą Wnioskodawca włada na mocy użytkowania wieczystego. Niniejszy Projekt dotyczy kompleksowej głębokiej termomodernizacji budynku Instytutu Energetyki (IEn) w Warszawie. Cele, jakie w ramach Projektu zrealizuje Wnioskodawca to: Cel główny: zwiększenie efektywności energetycznej budynku Instytutu Energetyki w Warszawie. Cele szczegółowe: - zmniejszenie kosztów eksploatacji budynku Instytutu, dzięki oszczędności energii elektrycznej i cieplnej; - zmniejszenie zużycia energii końcowej i pierwotnej, potrzebnej do ogrzewania infrastruktury Instytutu; - wzrost czystości powietrza w otoczeniu budynku, poprzez redukcję emisji gazów cieplarnianych; - poprawa jakości korzystania z infrastruktury publicznej – poprawa komfortu pracy i przebywania w budynku. Osiągnięcie powyższych celów będzie możliwe poprzez przeprowadzenie następujących działań, stanowiących wydatki kwalifikowane Projektu o podanych wartościach (zł): - Prace przygotowawcze: dokumentacja aplikacyjna (studium wykonalności), Prace przygotowawcze: dokumentacja projektowo - techniczna (dokumentacja: techniczna, przetargowa, projektowa, przyrodnicza), Roboty budowlane: Ocieplenie ścian szczytowych – 1419,15 m2; Ocieplenie dachu nad klatką schodową oraz maszynownią – 96,25 m2; Wymiana drzwi zewnętrznych – 24,52 m2; Ocieplenie stropodachu niewentylowanego 788,64 m2; Wymiana okien klatki schodowej - 14,04 m2; Ocieplenie ścian osłonowych – 1827,73 m2; Ocieplenie ścian cokołowych piwnic – 141,0 m2; Modernizacja instalacji c.w.u. – 1 kpl.; Modernizacja instalacji c.o. – 1 kpl. Budowa nadachowej instalacji PV – 39,96 kWp; Wymiana oświetlenia – 1 kpl., Promocja Projektu, Nadzór inwestorski, Audyt ex-post. (Polish)
0 references
The project will be implemented in Mazowieckie Province, in Warsaw, on the street Augustówka 36 on the real estate which the Applicant has a command on the basis of the perpetual usufruct.This draft concerns a comprehensive deep thermal renovation of the premises of the Institute of Energy (en) in Warsaw.The project will implement the objectives of the project:Goal:increase the energy efficiency of the Warsaw Institute of Energy.Specific objectives:— a reduction in the costs of operating the premises of the Institute, thanks to the saving of electricity and heat;A reduction in the final and primary energy consumption needed to heat the infrastructure of the Institute;The increase in the purity of the air in the surroundings of the building by reducing greenhouse gas emissions;Improving the quality of use of public infrastructure — improving the comfort of working and living in the building.It will be possible to achieve the above objectives by carrying out the following actions, representing eligible expenditure of the Project, with these values (PLN):Preparatory work:application documentation (feasibility study), Preparatory work:project documentation — technical documentation (documentation:technical, tendering, project and nature), Construction works:Insulation of peak walls — 1 419.15 m²;Roof insulation of the staircase and its engine room — 96.25 m²;Replacement of external doors — 24.52 m²;788.64 m² unventilated insulation;Replacement of a stairway window — 14.04 m²;Casing wall insulation — 1 827.73 m²;Warming of coro- wall walls — 141.0 m²;Modernisation of the hot-water installations — 1 kpl;Modernisation of 1kpl installation.Construction of an overreaching PV — 39,96 kWp;Replacement of lighting — 1 kpl, Promotion of the project, Investor’s supervision, ex-post audit. (English)
0 references
Identifiers
POIS.01.03.01-00-0084/17
0 references