Upgrading of the line Veselí n.L. — Tábor — Part II, section Veselí n. L. — Doubí u Tábora, Stage 2, Soběslav — Doud_1 (Q72308): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: Cohesion Fund / rank | |||
Normal rank |
Revision as of 16:07, 7 June 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Upgrading of the line Veselí n.L. — Tábor — Part II, section Veselí n. L. — Doubí u Tábora, Stage 2, Soběslav — Doud_1 |
Project in Czech Republic financed by DG Regio |
Statements
1,495,033,037.18 Czech koruna
0 references
1,804,701,823.0 Czech koruna
0 references
82.84 percent
0 references
10 September 2019
0 references
1 July 2023
0 references
Správa železniční dopravní cesty, státní organizace
0 references
11000
0 references
Na základě přijaté koncepce rozvoje železniční sítě je modernizován i IV. tranzitní železniční koridor. Předmětem projektu je jeho součást - úsek mezi stanicí Soběslav (kde se navazuje na předchozí etapu stavby, úsek Veselí nad Lužnicí (mimo) - Soběslav, dokončený v roce 2015) a zástavkou Doubí u Tábora (včetně). Zde trať navazuje na v předstihu dokončený úsek Tábor - Doubí u Tábora, zprovozněný v roce 2009. (Czech)
0 references
On the basis of the adopted concept for the development of the rail network, the fourth transit railway corridor is being upgraded. The subject of the project is part of the project — a section between the Slunslav station (which follows the previous stage of construction, the section Veselí nad Lužnicí (outside) — Soběslav, completed in 2015) and the pledge of Doubí u Tábora (inclusive). This follows the completion of the completed section of the Tábor — Doubí u Tábora, which became operational in 2009. (English)
0 references
Identifiers
CZ.04.1.41/0.0/0.0/15_001/0000328
0 references