Calibration of optical sensor systems and special sensors for NPPs (Q10193): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / fund | |||
Property / fund: European Regional Development Fund / rank | |||
Normal rank |
Revision as of 19:41, 6 June 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Calibration of optical sensor systems and special sensors for NPPs |
Project in Czech Republic financed by DG Regio |
Statements
22,702,680.0 Czech koruna
0 references
38,220,000.0 Czech koruna
0 references
59.4 percent
0 references
1 January 2017
0 references
23 September 2019
0 references
ÚJV Řež, a. s.
0 references
25068
0 references
Projekt je orientován na výzkum interní a externí laserové kalibrace systému pro sledování stavu dokončených inženýrských staveb. Pilotní systém s interním a externím kalibračním modulem, bude aplikován v systému pro měření tvarových změn kontejnmentů JE Temelín. Interní reference v systému umožní jeho nepřetržitou funkčnost i v případě, že systém bude odpojen od vnějších zdrojů. Externí pak umožní periodickou vzdálenou kalibraci, která bude mít přímou návaznost na základní normály. a. (Czech)
0 references
The project is research on an internal and external laser calibration of a system for monitoring the status of completed civil engineering works. The pilot system, with an internal and external calibration module, will be applied in a system to measure structural containment of the Temelín NPP. The internal system reference in the system will allow for its continuous functionality even if the system is disconnected from external sources. External means will allow a periodically separated calibration that will be directly linked to the base normal. a. (English)
0 references
Identifiers
CZ.01.1.02/0.0/0.0/15_019/0004506
0 references