Increasing customer service standards of Koleje Dolnośląskie S.A. through the development of technical facilities for servicing and servicing rolling stock (Q4426575): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Import item from Poland) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Legnicko-głogowski / rank | |||
Normal rank |
Revision as of 23:13, 27 October 2022
Project Q4426575 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing customer service standards of Koleje Dolnośląskie S.A. through the development of technical facilities for servicing and servicing rolling stock |
Project Q4426575 in Poland |
Statements
48,128,256.79 zloty
0 references
10,698,911.48 Euro
0 references
56,621,478.58 zloty
0 references
12,586,954.69 Euro
0 references
85.0 percent
0 references
27 March 2020
0 references
30 June 2023
0 references
KOLEJE DOLNOŚLĄSKIE SPÓŁKA AKCYJNA
0 references
Przedmiotowy projekt zakłada budowę zaplecza technicznego do obsługi i serwisowania taboru Spółki Koleje Dolnośląskie S.A. Zakres przedsięwzięcia obejmuje: • budynek do obsługi i serwisowania taboru kolejowego • wiatę magazynową • stację paliw: dystrybutor paliwa ze zbiornikiem podziemnym o pojemności 30 m3 • punkty z pompami do wypompowywania nieczystości z pojazdów szynowych i punkty uzupełniania wody w pojazdach • utwardzoną nawierzchnię komunikacji pieszo-jezdnej, miejsca postojowe • usunięcie kolizji poprzez likwidację lub przebudowę istniejącej zabudowy, infrastruktury technicznej z projektowanymi obiektami; • likwidację, przebudowę, budowę: układu torowego i sieci trakcyjnej; • budowę, przebudowę, rozbiórkę innych obiektów budowlanych, w tym infrastruktury kolejowej; • zakup biletomatów; • wyposażenie stanowiska do badania pantografów • wyposażenie stanowiska do badania sprężyn • wyposażenie stanowiska do pomiarów ram wózków • zakup mobilnych pomostów – 10 szt. • zakup wózków technologicznych – 10 szt. • zakup przyrządów pomiarowych • zakup pojazdu akumulatorowego • wyposażenie magazynu składowania • dostawa i montaż suwnicy • dostawa i montaż tokarki * zakup biletomatów (systemu sprzedaży biletów) wyposażonych w funkcje tablic informacji pasażerskiej, infomaty i bezpłatny dostęp do internetu oraz Odnawialne Źródła Energii. W wyniku realizacji inwestycji powstanie nowoczesne centrum serwisowania gwarantujące utrzymanie wysokiej jakości usług transportowych oraz odpowiedniego poziomy bezpieczeństwa użytkowania taboru. W ramach projektu przewidziano także zadania związane z opracowaniem dokumentacji (w tym PFU, dokumentacji projektowej wraz z uzyskaniem pozwolenia na budowę, opracowanie SW), działania informacyjno-promocyjne a także koszty związane z zaangażowaniem personelu w realizację projektu. Realizacji projektu wpłynie także pozytywnie na czas wykonywania przeglądów-zostanie on znacznie skrócony w porównaniu do obecnego czasu(ter (Polish)
0 references
The project assumes the construction of technical facilities for servicing and servicing the rolling stock of Koleje Dolnośląskie S.A. The scope of the project includes: • building for the operation and servicing of rolling stock • storage shed • fuel station: fuel distributor with an underground tank with a capacity of 30 m³ • points with pumps for pumping out uncleanness from rail vehicles and refuelling points in vehicles • paved pavement of pedestrian-driving communication, parking spaces • removal of collisions by decommissioning or redevelopment of existing buildings, technical infrastructure with the designed facilities; • decommissioning, reconstruction, construction: track system and overhead contact line; • construction, reconstruction, demolition of other buildings, including railway infrastructure; • purchase of ticket machines; • equipment of the pantograph test station • equipment of the spring test station • equipment for measuring the frames of trolleys • purchase of mobile platforms — 10 pcs. • purchase of technological trolleys — 10 pcs. • purchase of measuring instruments • purchase of a battery vehicle • storage equipment • delivery and installation of a gantry • delivery and installation of lathes * purchase of ticket machines (ticket sales system) equipped with the functions of passenger information boards, infomats and free internet access and Renewable Energy Sources. As a result of the investment, a modern service centre will be created to guarantee the maintenance of high quality transport services and appropriate levels of safety of rolling stock use. The project also includes tasks related to the preparation of documentation (including PFU, project documentation with obtaining a building permit, development of SW), information and promotion activities as well as costs related to the involvement of staff in the implementation of the project. The project will also have a positive impact on the duration of the surveys — it will be significantly reduced compared to the current time(ter) (English)
0 references
WOJ.: DOLNOŚLĄSKIE, POW.: Legnica
0 references
Identifiers
RPDS.05.02.01-02-0001/20
0 references