Improving energy efficiency in U.Z.S STYL DOOR through the use of RES energy (Q4419654): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Import item from Poland) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Bialski / rank | |||
Normal rank |
Revision as of 23:18, 27 October 2022
Project Q4419654 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving energy efficiency in U.Z.S STYL DOOR through the use of RES energy |
Project Q4419654 in Poland |
Statements
148,200.0 zloty
0 references
32,944.86 Euro
0 references
228,000.0 zloty
0 references
50,684.4 Euro
0 references
65.0 percent
0 references
1 October 2022
0 references
30 September 2023
0 references
ROBERT ZABIELSKI U.Z.S STYL DRZWI
0 references
Przedmiotem zamówienia jest rozbudowa instalacji fotowoltaicznej o łącznej mocy moc 68,04 kWp, zlokalizowanej przy ul. Wojska Polskiego 19 w Parczewie, do wytwarzania energii elektrycznej z energii słonecznej o mocy wraz z systemem zarządzania wykorzystującym TIK. Parametry TIK: niezależny inteligentny system monitorowania i zarządzania on-line instalacją; fotowoltaiczną, wyposażony w moduł komunikacyjny ; analiza pracy systemu PV, która poprzez dedykowany program lub stronę www dostarcza informacji nt.: ilości wyprodukowanej energii w danym okresie, danych historycznych dotyczących produkcji energii, wykrytych wad i usterek o elektrycznych parametrów pracy systemu; Projekt realizowany będzie od października 2022 do sierpnia 2023 roku ( rzeczowe zakończenie projektu). Jest gotowy do wdrożenia. (Polish)
0 references
The subject of the contract is the extension of the photovoltaic installation with a total capacity of 68.04 kWp, located at ul. Polish Army 19 in Parczew, to generate electricity from solar power with a management system using ICT. Parameters of ICT: an independent intelligent on-line monitoring and management system; photovoltaic, equipped with a communication module; analysis of the work of the PV system, which through a dedicated program or website provides information on: the amount of energy produced during the period, historical data on energy production, detected defects and faults with the electrical performance of the system; The project will be implemented from October 2022 to August 2023 (actual completion of the project). He’s ready to implement. (English)
21 October 2022
0 references
The subject of the contract is the extension of the photovoltaic installation with a total capacity of 68.04 kWp, located at ul. Polish Army 19 in Parczew, to generate electricity from solar power with a management system using ICT. Parameters of ICT: an independent intelligent on-line monitoring and management system; photovoltaic, equipped with a communication module; analysis of the work of the PV system, which through a dedicated program or website provides information on: the amount of energy produced during the period, historical data on energy production, detected defects and faults with the electrical performance of the system; The project will be implemented from October 2022 to August 2023 (actual completion of the project). He’s ready to implement. (English)
0 references
WOJ.: LUBELSKIE, POW.: parczewski
0 references
Identifiers
RPLU.15.01.00-06-0226/22
0 references